Neils Web Site
EX-3
Fuselage
Work Logs Found:
67
Category Work Time:
196 Hours
Date
Hours
Work Log Summary
Details
05-30-2023
2.00
Rear Tail Wheel Suspension
Details
06-08-2022
2.00
Paint right root header
Details
04-21-2022
3.00
Prime, Paint and Install Pulley Cages
Details
10-19-2021
3.00
Level Fusalage for wing install
Details
10-18-2021
2.00
Fabricate "Bullets" to be used in wing install
Details
08-09-2021
2.00
Install Tail Wheel
Details
08-05-2021
1.50
Drill support tubes onto RT Horizontal Stab
Details
08-04-2021
3.00
Install main Gears and wheels
Details
08-02-2021
2.00
Install 3X3 Cabane Vee
Details
07-29-2021
1.50
Install lower supports on Alpha Omega shocks
Details
07-26-2021
2.00
Install brake lines on mains
Details
07-23-2021
3.00
Assemble Flap handle
Details
07-22-2021
2.50
Install Fire wall Grommets and Drain
Details
06-23-2021
3.00
Boot Cowl Defrost Vent
Details
06-22-2021
3.00
Attach boot cowl hatch
Details
06-21-2021
5.00
Fit Boot Cowl to fusalage
Details
06-17-2021
4.00
Clamp boot cowl assembly components
Details
05-17-2021
1.00
Build Boot cowl assembly jig
Details
05-14-2021
2.00
Attach Faux Instrument Panel
Details
05-12-2021
4.00
Build firewall Tunnel
Details
05-11-2021
3.00
Attach fire wall Angles
Details
05-10-2021
4.00
Fabricate Fire wall insulation
Details
05-05-2021
4.00
Rudder Cables and Break attach
Details
05-04-2021
1.50
Fit and attach fabric spacers
Details
05-03-2021
4.50
Install Top Stringer
Details
03-31-2021
6.00
Complete Jack Screw Install
Details
03-30-2021
3.00
Drill Jack screw thrust Bearing
Details
03-26-2021
4.00
Fit elevator jack screw to fusalage
Details
03-25-2021
2.00
Elevator bungee cable clamp
Details
03-24-2021
2.00
Install Elevator Trim Bungee
Details
03-23-2021
3.00
Set Rudder Deflection to 7 inches
Details
03-17-2021
4.00
Install and test fule line fittings
Details
03-15-2021
3.00
Drill frame for vertical stab and rudder
Details
03-10-2021
3.00
Fuel line anti-chafe
Details
03-09-2021
4.00
Start Attaching fule lines to fusalage
Details
03-08-2021
3.00
Lay out and cut fuel lines per FS44
Details
03-04-2021
4.00
Install and run Elevator Cables
Details
03-03-2021
5.00
Install floor board
Details
03-01-2021
2.00
Install rear rudder pedals
Details
02-26-2021
2.50
Install front heel plates and pedals
Details
02-25-2021
1.50
Install control Stubs
Details
02-24-2021
3.00
Install rear of Torque Tube
Details
02-23-2021
3.00
Install Front bushing for torque tube
Details
02-22-2021
3.00
Install Seat Base Reinforcement
Details
02-19-2021
4.00
Final fill and feather cargo door
Details
01-21-2021
4.00
Install heat duct and shield
Details
01-20-2021
1.50
First coat of filler Cargo door to fusalage
Details
01-19-2021
5.00
Install Stringers on Left and Right Sides
Details
01-18-2021
4.00
Install Throttle Quandrants
Details
01-15-2021
1.50
Install low fuel point drain
Details
01-14-2021
4.00
Adhear Elevator Fairlead blocks
Details
01-13-2021
2.00
Assemble Bottem Stringer
Details
01-11-2021
2.50
Install fron bagge floor and front floor
Details
01-08-2021
3.00
Install rudder fairleads
Details
01-07-2021
2.00
Bond and trim cargo door extensions
Details
01-06-2021
2.00
Bond door frame
Details
01-05-2021
1.50
Install fuel line cover
Details
01-04-2021
4.00
Rivet Extended Cargo area
Details
01-02-2021
3.50
Fit and install Cargo door
Details
12-28-2020
5.00
Fit, drill and cleco extended baggage
Details
12-23-2020
1.50
Plumb Fuel Selector
Details
11-24-2020
3.00
Pre Assemble Torque Tube
Details
11-23-2020
1.50
Assemble Trim Jack Screw
Details
11-19-2020
3.00
Assemble rear pedals
Details
11-18-2020
2.00
Assemble front pedals
Details
11-17-2020
5.00
Inspect and repair fusalage finish
Details
11-16-2020
1.00
Move fusalage on work bench
Details
SITE NAVIGATION
Contact Builder
EX-3 Home
Category
# Logs
# Hours
All
298
3372
Avionics
34
456
Delivery & Invenory
2
23
Empennage
10
306
Engine
6
82
Finish
43
781
Firewall Forward
49
564
Fuselage
67
700
Wings
87
460