Work Logs Found: 78
Category Work Time: 192 Hours
 Date
Hours
Work Log Summary

Details

 04-26-2020
4.00
Install door panels and key lock.
Details
       

 04-25-2020
4.00
Door locking rods and assembly.
Details
       

 04-26-2019
3.00
Window trim in the making.
Details
       

 04-25-2019
1.00
Sand able micro around windows with peel-ply
Details
       

 04-24-2019
3.00
Pilot side door window installation.
Details
       

 04-21-2019
4.00
Prep for window and glue in place.
Details
       

 04-20-2019
3.00
Installing windows in doors
Details
       

 01-13-2017
2.00
Mount door micro switches and spring pin actuator
Details
       

 01-11-2017
4.00
Install door open micro switch
Details
       

 02-07-2015
1.00
Door lock was removed and trashed
Details
       

 11-14-2014
3.00
Moved shop around again and sand door ends
Details
       

 11-09-2014
3.00
Worked on door. Strake end.& Gear legs.
Details
       

 11-08-2014
2.00
Finishing the door panels
Details
       

 11-06-2014
1.50
Door panel pull handle
Details
       

 10-26-2014
3.00
Stake door handle and bid on main spare
Details
       

 10-23-2014
3.00
Micro and bid in arm rest on doors
Details
       

 11-23-2013
4.00
Sand and prime doors again.
Details
       

 10-20-2013
4.00
Prime doors and NACA scoop
Details
       

 02-26-2013
2.50
Cut for weather strip
Details
       

 02-23-2013
5.00
Fill Latch pin tube area
Details
       

 02-19-2013
1.50
More door work
Details
     

 02-18-2013
1.50
Fitting the fuselage to the door
Details
       

 02-17-2013
2.50
Door cut out re-sizing for even spacing.
Details
       

 02-16-2013
2.50
Fill and sand door hinge tabs
Details
       

 02-15-2013
2.50
Time to set up level for door springs
Details
       

 02-14-2013
2.50
Install door gas springs
Details
       

 02-12-2013
4.00
Bid in over head swich panle and work on handles
Details
       

 02-11-2013
5.00
Over head switch panel
Details
       

 02-08-2013
2.00
2 bid on door spring hard pionts
Details
       

 02-07-2013
2.50
Hold handles need some filling
Details
     

 02-06-2013
1.50
Fill and sand hinge areas
Details
     

 02-05-2013
2.50
Installed the hard points for the door spring
Details
       

 02-04-2013
1.50
Hard points for door spring
Details
     

 02-03-2013
1.50
Hinge pockets
Details
       

 02-03-2013
5.00
2 bid in the cabon beams
Details
       

 02-02-2013
4.00
Sand beams for lay-ups
Details
     

 01-31-2013
3.50
Install front carbon beams
Details
       

 01-30-2013
2.50
Fit front carbon beams
Details
       

 01-29-2013
2.00
Installed center section of the Carbon Beam
Details
       

 01-28-2013
3.50
Carbon Beams installed
Details
       

 01-27-2013
3.00
Inside the fuselage at hinge area.
Details
       

 01-27-2013
2.50
Fit and install hard pionts in beam.
Details
       

 01-26-2013
2.00
Bid on open face of fuselage hinge area
Details
       

 01-25-2013
1.50
Worked on door hinge area
Details
     

 01-25-2013
0.50
Heat up door one more time
Details
     

 01-24-2013
1.50
Last fuselage door receiver tube
Details
     

 01-23-2013
1.50
Fix door tube
Details
     

 01-22-2013
1.00
Time to cut bid
Details
     

 01-22-2013
2.00
Pilot door receivers
Details
     

 01-21-2013
2.00
Install lach pin tubes in fueslage
Details
     

 01-20-2013
1.50
Heat door to fit
Details
       

 01-20-2013
3.00
Door locking rods
Details
       

 01-20-2013
2.00
Door lock
Details
     

 01-17-2013
1.50
Receiver tubes for the fuselage
Details
     

 01-15-2013
1.50
Door guide for rod
Details
     

 01-11-2013
2.00
Fill and sand the door.
Details
     

 01-10-2013
1.00
Lock mechanism
Details
       

 01-06-2013
3.00
Time to work on the latching system
Details
       

 01-05-2013
3.00
Time to heat the doors to fit
Details
       

 12-26-2012
2.00
Hinge beds on fuselage
Details
     

 12-25-2012
1.50
TRIAX and bid on top of hinge tabs
Details
       

 12-24-2012
3.00
Time to hang the doors
Details
       

 12-23-2012
4.00
Sanded doors for 3 bid lay-up Then did lay-up
Details
       

 12-23-2012
1.50
Jack Brace was here to help !!!!
Details
       

 12-20-2012
3.00
Close in door hinge pieces
Details
       

 12-16-2012
1.00
More door work.
Details
     

 12-15-2012
0.50
2 bib on doors
Details
       

 12-10-2012
1.00
Glued on pilot hinge
Details
     

 12-09-2012
1.00
Glue on hinge
Details
     

 12-09-2012
2.50
Cut fuselage for hinges
Details
       

 12-08-2012
2.00
Hinge pionts attached
Details
       

 12-04-2012
1.00
Hinge lay-up
Details
     

 11-27-2012
3.50
Hinge placement
Details
       

 11-19-2012
1.50
Finished door opening
Details
     

 11-17-2012
3.50
Fuselagde door hole treatment
Details
       

 11-16-2012
2.00
Door weather strip prep.
Details
       

 11-13-2012
4.00
Molding TRIAX in place
Details
     

 11-01-2012
3.00
Door cut out
Details
     