Work Logs Found: 75
Category Work Time: 194 Hours
 Date
Hours
Work Log Summary

Details

 02-19-2019
5.00
The push pull cables were finally attached to the
Details
       

 02-06-2018
3.00
Overhead air vents installed.
Details
     

 03-26-2017
2.00
Prep for throat, mixture and propeller cables at i
Details
       

 03-19-2017
4.00
Trim duct and made a new one for other side
Details
       

 03-18-2017
5.00
Working on defrost for glare shield.
       

 03-17-2017
2.00
Micro bottom of doors to get ready for paint.
       

 02-15-2017
1.00
Finished mounting the back panels with all the scr
Details
     

 12-29-2016
2.00
Painted the back and front sliding seat rails.
Details
       

 12-22-2016
4.00
Install back seats and clean up
Details
       

 12-21-2016
4.00
Clean up and 2 bids on hard pionts for back seats
Details
       

 12-19-2016
4.00
Moved hard points for back seats
Details
       

 12-18-2016
3.00
Back seat slide rails were mounted to seats
Details
       

 12-16-2016
3.00
Cut and weld back seat rails for height
Details
       

 12-15-2016
3.00
Co-Pilot seat in place now
Details
       

 12-13-2016
3.00
Pilot seat in place.
Details
       

 12-08-2016
2.00
2 bid on Co-Piot seat hard pionts
Details
     

 12-07-2016
4.00
Installing the Co-pilot side seat hard points and
Details
       

 11-28-2016
6.00
Work on installing seats
Details
       

 11-27-2016
2.00
Remove Pilot side kick plate
Details
       

 11-26-2016
2.00
2 bid on hard pionts
Details
       

 11-25-2016
3.00
Hard pionts going in.
Details
       

 11-24-2016
1.00
Seat mounting slides need work
Details
       

 11-24-2016
1.00
Install my new seats after changing stuff.
Details
       

 11-24-2016
2.00
Hard points need to be sunken to level seats.
Details
       

 11-22-2016
2.00
Finish the install on the avionics shelf.
Details
     

 11-21-2016
4.00
Work on installing seats
Details
       

 11-21-2016
3.00
Installed avionics shelf.
Details
       

 11-20-2016
3.00
Bent avionics shelf and triax ends to hold up.
Details
     

 11-18-2016
2.00
Avionics shelf ready for bending
Details
     

 11-02-2016
2.00
Fine tuning on glare shield
Details
     

 11-01-2016
2.00
Tie down hard pionts
Details
       

 10-31-2016
3.00
Instrument glare shield attachment
Details
       

 10-25-2016
3.00
Instrument panel adjusting
Details
       

 01-31-2016
2.00
Getting things ready for mounting the glare shield
Details
       

 01-10-2016
1.00
Worked on glare shield,1 bid on elevator tube hole
Details
     

 01-09-2016
2.00
Installed instrument panel
Details
       

 01-02-2016
1.00
Sand and add micro to panel
Details
     

 12-31-2015
2.00
Cleaned up instrument panel and micro
Details
     

 12-30-2015
2.00
Filled in ends on instrument panel
Details
       

 12-27-2015
4.00
Modify instrument panel so it is 20 degrees and fa
Details
       

 03-15-2015
2.00
Lay-ups for Instrument panel
Details
       

 06-12-2014
2.00
Install toe brake cylinders
Details
       

 05-26-2014
1.00
Toe brake cylinders are in
Details
     

 05-17-2014
4.00
Templates for back panel.
Details
       

 05-14-2014
3.00
Assemble rudder pedals with push pull bell crank
Details
       

 05-13-2014
1.00
Fill in master cylinder hole
Details
       

 05-11-2014
2.00
Mount toe brake rail
Details
       

 05-10-2014
3.00
Worked on rudder and toe brake pedals
Details
       

 05-06-2014
2.00
Work on insturument panel
Details
       

 01-31-2014
1.00
Added more TRIAX and bid to panel
Details
     

 01-28-2014
1.50
Make instrument panel
Details
     

 06-11-2013
2.00
Fresh air water drain tubes.
Details
       

 06-06-2013
1.50
Rivet in overhead fresh air
Details
       

 06-01-2013
2.50
Floxed in over head fresh air .
Details
     

 05-30-2013
3.00
Removed fuselage over light swiches
Details
       

 05-26-2013
2.00
Bondo for air vents
Details
     

 05-21-2013
3.50
Overhead fresh air and lights
Details
       

 05-20-2013
1.50
Tap seat belt hard points
Details
       

 05-20-2013
1.00
Fit aluminum carpet stip in place.
Details
       

 05-18-2013
4.00
Glass up kick plate foam
Details
       

 05-18-2013
2.00
Dowels for kick plate aluminum strip.
Details
       

 05-12-2013
1.75
Foam for door kick plate
Details
       

 05-11-2013
3.50
Milled fiber in hard points with 3 bid
Details
       

 05-09-2013
2.50
Prep hard points for seat belts
Details
       

 04-14-2013
4.00
TRIAX Mid engine mount
Details
       

 04-07-2013
4.00
TRIAX for engine mount
Details
       

 03-10-2013
1.50
Drilled back seat rail
Details
     

 03-10-2013
2.50
Bolts for front seat
Details
       

 03-10-2013
3.50
Back seat hard points
Details
       

 03-09-2013
1.00
Installed the pilot seat
Details
       

 03-09-2013
4.00
Installed side plates for seats
Details
       

 03-08-2013
2.50
Sand and apply top coat
Details
       

 02-17-2013
3.50
Working on overhead fresh air duct
Details
       

 02-17-2013
3.50
Over Head fresh air duct
Details
     

 10-31-2012
1.50
Speed brake
Details
       