Powered By Kitlog Pro v2.0
JAMESs Web Site
VELOCITY- XLRG
Landing Gear/RG
Work Logs Found:
30
Category Work Time:
103 Hours
Date
Hours
Work Log Summary
Details
02-19-2024
4.00
Main gear axles and brakes.
Details
02-08-2024
5.00
Installed main landing gear.
Details
10-28-2017
2.00
Reinstall Nose gear guides
Details
05-25-2017
6.00
Install park brake block and handle.
Details
05-18-2017
3.00
Work on installing nose gear micro switch
Details
04-20-2017
5.00
Install micro switches on nose and main gear
Details
10-28-2016
2.00
Nut plates for bootie bump cover
Details
10-18-2016
5.00
Worked on cutting bottom of doors and glass work
Details
10-14-2016
4.00
Bracket and sanded gap on landing gear doors
Details
10-13-2016
6.00
Brackets for main gear doors
Details
10-07-2016
5.00
Work on fitting Co-Pilot retract door
Details
10-06-2016
5.00
Sanded brackets and sized doors to fit fuselage.
Details
10-05-2016
5.00
Worked on spindles, brackets, foam reinforcement o
Details
10-04-2016
5.00
Boxed in over gear leg and behind leg socket.
Details
09-30-2016
2.00
More bid work in the gear leg socket area.
Details
09-27-2016
2.00
Glass in gear leg sockets
Details
07-26-2016
5.00
Get fuselage ready for leg sockets
Details
05-21-2016
5.00
Worked on Cleveland brakes and make axel support b
Details
05-19-2016
2.00
New leg sockets had to be made.
Details
11-08-2014
2.00
Brake line prep
Details
11-06-2014
2.00
Carbon bid on main gear legs
Details
11-03-2014
4.00
Glassed up other side of main gear
Details
11-02-2014
3.00
I going too carbon bid the main landing gear
Details
01-12-2013
3.50
Nose gear guides
Details
11-19-2012
0.50
Sand filler on main legs
Details
11-14-2012
1.00
Trim nose wheel gides
Details
11-10-2012
2.00
Install brake line sheild
Details
11-04-2012
3.00
Gear sockets
Details
10-30-2012
3.00
Cut away back out side landing gear doors
Details
10-29-2012
1.00
Nose gear doors
Details
SITE NAVIGATION
Contact Builder
VELOCITY- XLRG Home
Category
# Logs
# Hours
All
847
2528
Brakes
3
10
Bulkheads
1
1
Canard/Elevator
49
122
Control System
17
58
Doors/Windows
78
192
Electrical/Instrumen
21
66
Engine/Propeller
141
432
Fairings
10
34
Filling to priming
155
533
Final Assembly/Finis
1
2
Fuel System
137
407
Fuselage
75
194
Inspections
1
1
Instrument Panel
7
20
Interior
52
192
Kit Purchase/Conditi
2
26
Landing Gear/RG
30
103
Painting
2
8
Shop
5
16
Time away from build
18
Tools
2
5
Wheels/Axles
4
10
Wings/Winglets
36
96
Copyright © 2001-2024 Matronics. All Rights Reserved.