LAAD Avion LLC
Work
Logs
Found:
16
|
Category Work Time: 50 Hours
|
Date
|
Hours
|
Work Log Summary
|
Details
|
01-05-2013
|
4.50
|
Install Gas tank, check flapperon brackets, reins
|
|
|
|
12-15-2012
|
4.00
|
Spinner install,reinstall prop, cowling heat shiel
|
Details
|
|
|
12-12-2012
|
3.00
|
Spinner attach points, and prop cutouts
|
Details
|
|
|
12-09-2012
|
1.50
|
Finish fiberglass airduct, attach oil cooler, plac
|
|
|
|
12-08-2012
|
2.50
|
Blast tube regulator, fiberglass airduct, cowling
|
|
|
|
12-03-2012
|
2.00
|
Prepare air duct for fibeglass, oil hoses, panel w
|
|
|
|
11-29-2012
|
3.00
|
Oil cooler assembly, start air duct installation
|
|
|
|
11-28-2012
|
2.50
|
Oil cooler box,
|
|
|
|
11-25-2012
|
4.00
|
Overflow hose, heater cable install
|
Details
|
|
|
11-20-2012
|
3.00
|
Install box cooler, radiator, clean up wiring
|
|
|
|
11-18-2012
|
1.50
|
EGT probes, wrap exhausts, start cooler box
|
|
|
|
11-17-2012
|
3.00
|
Prop on, muffler on, trim tail pipe, cowling
|
|
|
|
11-14-2012
|
4.00
|
fuel lines,fuel return line, MAP hose, pitot tube,
|
|
|
|
11-10-2012
|
7.00
|
Install engine mount,cooling shield, mate engine t
|
|
|
|
11-08-2012
|
3.00
|
install battery, wiring harnesses, fuel pressure s
|
|
|
|
11-04-2012
|
1.50
|
Open and inventory engine kit-finally
|
Details
|
|
|
|
|
|
|
|
|