Date
|
Hours
|
Work Log Summary
|
Details
|
10-24-2016
|
1.00
|
Finishing up wiring ELT
|
Details
|
|
|
10-22-2016
|
3.00
|
Finish ELT antenna, wire mini din plug
|
Details
|
|
|
09-24-2016
|
1.00
|
Ran ELT wiring
|
Details
|
|
|
09-21-2016
|
3.00
|
Finished Wiring Seat Heaters
|
Details
|
|
|
09-18-2016
|
2.00
|
Rear Heated Seat wiring-1
|
Details
|
|
|
07-13-2016
|
1.00
|
GPS antenna wiring
|
Details
|
|
|
11-23-2015
|
1.00
|
Begin roll servo install-1
|
Details
|
|
|
06-21-2015
|
2.00
|
Ran taxi & landing light wires
|
Details
|
|
|
04-27-2015
|
4.00
|
EMS terminate network cable, secure wires to F/W
|
Details
|
|
|
03-30-2015
|
2.00
|
Wired panel lights/GTN antenna connection
|
Details
|
|
|
03-21-2015
|
2.00
|
Wires for boost pump light
|
Details
|
|
|
03-18-2015
|
1.00
|
Starter contactor wiring
|
Details
|
|
|
03-16-2015
|
1.00
|
Starter contactot wiring
|
Details
|
|
|
03-13-2015
|
2.00
|
Termporary install of EMS module
|
Details
|
|
|
03-12-2015
|
2.00
|
Mount for EMS module
|
Details
|
|
|
03-05-2015
|
2.00
|
Distribution Hub-3
|
Details
|
|
|
03-04-2015
|
2.00
|
Distribution Hub-2
|
Details
|
|
|
03-03-2015
|
2.00
|
Distribution hub-1
|
Details
|
|
|
02-23-2015
|
2.00
|
Connect GTN650 to ARINC-429
|
Details
|
|
|
02-20-2015
|
1.00
|
Connect D-1000 to VP-X
|
Details
|
|
|
02-18-2015
|
3.00
|
Wire USB to Dynon connector, add resistor-xponder
|
Details
|
|
|
02-17-2015
|
2.00
|
USB cable for Dynon Screen
|
Details
|
|
|
02-16-2015
|
3.00
|
Connected dimmer wire, changed some VP-X wires
|
Details
|
|
|
02-12-2015
|
2.00
|
Failsafe warinig audio connected
|
Details
|
|
|
02-11-2015
|
3.00
|
D-1000 power & xponder wiring
|
Details
|
|
|
02-09-2015
|
3.00
|
Dynon screen wire run-1
|
Details
|
|
|
02-07-2015
|
4.00
|
Finished up power & ground wiring from the radio s
|
Details
|
|
|
01-30-2015
|
1.00
|
Finish wiring mic/phones
|
Details
|
|
|
01-28-2015
|
1.50
|
Prepped mic/phone cables
|
Details
|
|
|
01-25-2015
|
0.50
|
Terminated antenna cable for A-210
|
Details
|
|
|
01-24-2015
|
1.00
|
Termination of mic/phone wires
|
Details
|
|
|
01-23-2015
|
1.00
|
Replace ground tabs, begin mic/phone wiring
|
Details
|
|
|
09-19-2013
|
1.00
|
Fabbed battery positive cable, mod to hold down cl
|
Details
|
|
|
09-18-2013
|
2.00
|
Fabbed ground wire to battery
|
Details
|
|
|
09-14-2013
|
1.00
|
Suntail--added molex connector
|
Details
|
|
|
03-08-2013
|
1.00
|
Pilot Map Light
|
Details
|
|
|
03-07-2013
|
1.00
|
Rear Map Light, Rear Stick Lockout-final
|
Details
|
|
|
03-06-2013
|
3.00
|
R. Seatback support plate-wiring cover
|
Details
|
|
|
03-03-2013
|
2.00
|
Front Map Light Cover, Rear Stick Lockout Switch
|
Details
|
|
|
03-02-2013
|
3.00
|
Antenna Coax, PIlot Map Light-1
|
Details
|
|
|
02-27-2013
|
2.00
|
HOBBS Meter Install
|
Details
|
|
|
02-23-2013
|
3.00
|
VP-X Wiring-2
|
Details
|
|
|
02-20-2013
|
2.00
|
Nav/Strobe Terminal Block Wiring
|
Details
|
|
|
02-17-2013
|
1.00
|
VP-X wiring
|
Details
|
|
|
02-16-2013
|
2.00
|
Pitch Servo Installation-5
|
Details
|
|
|
02-15-2013
|
2.00
|
Pitch Servo installation-4
|
Details
|
|
|
02-14-2013
|
1.00
|
Pitch Servo installation-3
|
Details
|
|
|
02-11-2013
|
1.00
|
Pitch Servo installation-2
|
Details
|
|
|
02-10-2013
|
1.00
|
Pitch Servo installation-1
|
Details
|
|
|
01-26-2013
|
4.00
|
E-bus wiring
|
Details
|
|
|
01-24-2013
|
2.00
|
Mic/Phone jack wiring-2
|
Details
|
|
|
01-22-2013
|
1.00
|
Tail cone wire cleanup
|
Details
|
|
|
01-20-2013
|
3.00
|
Terminal Strip Wiring-4
|
Details
|
|
|
01-19-2013
|
1.00
|
Mic/Phone jack wiring
|
Details
|
|
|
01-17-2013
|
2.00
|
Terminal Strip Wiring-3
|
Details
|
|
|
01-13-2013
|
2.00
|
Terminal Strip Wiring-2
|
Details
|
|
|
01-12-2013
|
4.00
|
Terminal Strip Wiring-1
|
Details
|
|
|
01-11-2013
|
2.00
|
Terminal Strip for Stick Wiring-3
|
Details
|
|
|
01-09-2013
|
2.00
|
Reat Stick Wiring Connector-3
|
Details
|
|
|
01-06-2013
|
2.00
|
Rear Stick Wiring Connector-2
|
Details
|
|
|
01-05-2013
|
2.00
|
Rear Stick Wiring Connector-1
|
Details
|
|
|
01-03-2013
|
2.00
|
Panel Switches
|
Details
|
|
|
01-01-2013
|
3.00
|
Mic & Phone jacks-2
|
Details
|
|
|
12-31-2012
|
1.00
|
Power outlet rear, mic & phone jacks
|
Details
|
|
|
12-29-2012
|
3.00
|
Infinity grip install-5
|
Details
|
|
|
12-28-2012
|
2.00
|
Infinity grip install-4
|
Details
|
|
|
12-26-2012
|
1.00
|
Terminal Strip for Stick Wiring-Redo
|
Details
|
|
|
12-21-2012
|
1.00
|
Terminal Strip for Stick wiring-2
|
Details
|
|
|
12-20-2012
|
1.00
|
Terminal Strip for Stick Wiring-1
|
Details
|
|
|
12-18-2012
|
1.00
|
Infinity grip install-3
|
Details
|
|
|
12-15-2012
|
2.00
|
Infinity grip install-2 (goof up)
|
Details
|
|
|
12-13-2012
|
1.00
|
Infinity grip install
|
Details
|
|
|
12-11-2012
|
1.00
|
Armrest switch wiring-2
|
Details
|
|
|
12-10-2012
|
1.00
|
Armrest switch wiring-1
|
Details
|
|
|
11-30-2012
|
2.00
|
Right switch panel-1
|
Details
|
|
|
11-29-2012
|
1.00
|
Ground block, grommet edging
|
Details
|
|
|
11-27-2012
|
1.00
|
Distribution block wiring-2
|
Details
|
|
|
11-25-2012
|
2.00
|
Distribution block wiring
|
Details
|
|
|
11-24-2012
|
0.50
|
Under Floor Conduit-2
|
Details
|
|
|
11-24-2012
|
2.00
|
Install distribution hub, power terminal on VP-X
|
Details
|
|
|
11-22-2012
|
0.50
|
Under Floor Conduit-1
|
Details
|
|
|
11-19-2012
|
1.00
|
OAT Probe wire
|
Details
|
|
|
11-18-2012
|
0.50
|
OAT Probe-1
|
Details
|
|
|
11-18-2012
|
1.50
|
Front floor mod-2
|
Details
|
|
|
11-17-2012
|
2.00
|
ADAHRS Mount-2, Front floor mod
|
Details
|
|
|
11-15-2012
|
1.00
|
VP-X Mount-3, ADAHRS Mount-1
|
Details
|
|
|
11-14-2012
|
1.00
|
VP-X Mount-2
|
Details
|
|
|
11-13-2012
|
1.00
|
VP-X Mount-1
|
Details
|
|
|
11-12-2012
|
1.00
|
Started #6 power feed to VP-X
|
Details
|
|
|
11-07-2012
|
0.50
|
Pulled wires to tail
|
Details
|
|
|
11-03-2012
|
0.50
|
Flap Motor Connectorized
|
Details
|
|