KitLog pro

Powered By Kitlog Pro v2.0

Steve & Nancy Riffe
Work Logs Found: 91
Category Work Time: 157 Hours
 Date
Hours
Work Log Summary

Details

 10-24-2016
1.00
Finishing up wiring ELT
Details
       

 10-22-2016
3.00
Finish ELT antenna, wire mini din plug
Details
       

 09-24-2016
1.00
Ran ELT wiring
Details

 09-21-2016
3.00
Finished Wiring Seat Heaters
Details
       

 09-18-2016
2.00
Rear Heated Seat wiring-1
Details
       

 07-13-2016
1.00
GPS antenna wiring
Details
       

 11-23-2015
1.00
Begin roll servo install-1
Details
       

 06-21-2015
2.00
Ran taxi & landing light wires
Details
       

 04-27-2015
4.00
EMS terminate network cable, secure wires to F/W
Details
       

 03-30-2015
2.00
Wired panel lights/GTN antenna connection
Details
       

 03-21-2015
2.00
Wires for boost pump light
Details
       

 03-18-2015
1.00
Starter contactor wiring
Details
       

 03-16-2015
1.00
Starter contactot wiring
Details
     

 03-13-2015
2.00
Termporary install of EMS module
Details
       

 03-12-2015
2.00
Mount for EMS module
Details
       

 03-05-2015
2.00
Distribution Hub-3
Details
       

 03-04-2015
2.00
Distribution Hub-2
Details
       

 03-03-2015
2.00
Distribution hub-1
Details
       

 02-23-2015
2.00
Connect GTN650 to ARINC-429
Details
       

 02-20-2015
1.00
Connect D-1000 to VP-X
Details
       

 02-18-2015
3.00
Wire USB to Dynon connector, add resistor-xponder
Details
       

 02-17-2015
2.00
USB cable for Dynon Screen
Details
       

 02-16-2015
3.00
Connected dimmer wire, changed some VP-X wires
Details
       

 02-12-2015
2.00
Failsafe warinig audio connected
Details
       

 02-11-2015
3.00
D-1000 power & xponder wiring
Details
       

 02-09-2015
3.00
Dynon screen wire run-1
Details
       

 02-07-2015
4.00
Finished up power & ground wiring from the radio s
Details
       

 01-30-2015
1.00
Finish wiring mic/phones
Details
       

 01-28-2015
1.50
Prepped mic/phone cables
Details
       

 01-25-2015
0.50
Terminated antenna cable for A-210
Details
     

 01-24-2015
1.00
Termination of mic/phone wires
Details
     

 01-23-2015
1.00
Replace ground tabs, begin mic/phone wiring
Details
       

 09-19-2013
1.00
Fabbed battery positive cable, mod to hold down cl
Details
       

 09-18-2013
2.00
Fabbed ground wire to battery
Details
       

 09-14-2013
1.00
Suntail--added molex connector
Details
     

 03-08-2013
1.00
Pilot Map Light
Details
       

 03-07-2013
1.00
Rear Map Light, Rear Stick Lockout-final
Details
       

 03-06-2013
3.00
R. Seatback support plate-wiring cover
Details
       

 03-03-2013
2.00
Front Map Light Cover, Rear Stick Lockout Switch
Details
       

 03-02-2013
3.00
Antenna Coax, PIlot Map Light-1
Details
       

 02-27-2013
2.00
HOBBS Meter Install
Details
       

 02-23-2013
3.00
VP-X Wiring-2
Details
       

 02-20-2013
2.00
Nav/Strobe Terminal Block Wiring
Details
       

 02-17-2013
1.00
VP-X wiring
Details
       

 02-16-2013
2.00
Pitch Servo Installation-5
Details
       

 02-15-2013
2.00
Pitch Servo installation-4
Details
       

 02-14-2013
1.00
Pitch Servo installation-3
Details
       

 02-11-2013
1.00
Pitch Servo installation-2
Details
     

 02-10-2013
1.00
Pitch Servo installation-1
Details
       

 01-26-2013
4.00
E-bus wiring
Details
       

 01-24-2013
2.00
Mic/Phone jack wiring-2
Details
       

 01-22-2013
1.00
Tail cone wire cleanup
Details
       

 01-20-2013
3.00
Terminal Strip Wiring-4
Details
       

 01-19-2013
1.00
Mic/Phone jack wiring
Details
       

 01-17-2013
2.00
Terminal Strip Wiring-3
Details
     

 01-13-2013
2.00
Terminal Strip Wiring-2
Details
       

 01-12-2013
4.00
Terminal Strip Wiring-1
Details
       

 01-11-2013
2.00
Terminal Strip for Stick Wiring-3
Details
       

 01-09-2013
2.00
Reat Stick Wiring Connector-3
Details
       

 01-06-2013
2.00
Rear Stick Wiring Connector-2
Details
       

 01-05-2013
2.00
Rear Stick Wiring Connector-1
Details
       

 01-03-2013
2.00
Panel Switches
Details
       

 01-01-2013
3.00
Mic & Phone jacks-2
Details
       

 12-31-2012
1.00
Power outlet rear, mic & phone jacks
Details
       

 12-29-2012
3.00
Infinity grip install-5
Details
       

 12-28-2012
2.00
Infinity grip install-4
Details
       

 12-26-2012
1.00
Terminal Strip for Stick Wiring-Redo
Details
     

 12-21-2012
1.00
Terminal Strip for Stick wiring-2
Details
       

 12-20-2012
1.00
Terminal Strip for Stick Wiring-1
Details
       

 12-18-2012
1.00
Infinity grip install-3
Details
       

 12-15-2012
2.00
Infinity grip install-2 (goof up)
Details
       

 12-13-2012
1.00
Infinity grip install
Details
       

 12-11-2012
1.00
Armrest switch wiring-2
Details
       

 12-10-2012
1.00
Armrest switch wiring-1
Details
       

 11-30-2012
2.00
Right switch panel-1
Details
       

 11-29-2012
1.00
Ground block, grommet edging
Details
       

 11-27-2012
1.00
Distribution block wiring-2
Details
       

 11-25-2012
2.00
Distribution block wiring
Details
       

 11-24-2012
0.50
Under Floor Conduit-2
Details
       

 11-24-2012
2.00
Install distribution hub, power terminal on VP-X
Details
       

 11-22-2012
0.50
Under Floor Conduit-1
Details
       

 11-19-2012
1.00
OAT Probe wire
Details
       

 11-18-2012
0.50
OAT Probe-1
Details
       

 11-18-2012
1.50
Front floor mod-2
Details
       

 11-17-2012
2.00
ADAHRS Mount-2, Front floor mod
Details
       

 11-15-2012
1.00
VP-X Mount-3, ADAHRS Mount-1
Details
       

 11-14-2012
1.00
VP-X Mount-2
Details
       

 11-13-2012
1.00
VP-X Mount-1
Details
       

 11-12-2012
1.00
Started #6 power feed to VP-X
Details
       

 11-07-2012
0.50
Pulled wires to tail
Details
       

 11-03-2012
0.50
Flap Motor Connectorized
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.