Powered By Kitlog Pro v2.0
Patricks Web Site
RV 9
Fuselage
Work Logs Found:
30
Category Work Time:
114 Hours
Date
Hours
Work Log Summary
Details
08-14-2013
4.50
Rudder cables
Details
08-05-2013
3.00
Fuel and Oil Press
Details
07-30-2013
8.00
Fire Wall
Details
07-29-2013
3.00
Mounted rudder peddals and rudder cable.
Details
07-24-2013
5.00
Brake lines and electric fuel pump.
Details
07-01-2013
4.00
Installed Wheels and brake pads
Details
06-18-2013
3.00
Replaced fuel selector valve
Details
06-17-2013
3.00
Rudder control cables
Details
06-11-2013
3.00
Seat belt harnes
Details
06-03-2013
2.00
Elevator control rod
Details
05-29-2013
5.00
Remanufacturing Brackets
Details
05-28-2013
8.00
Roll Cage
Details
05-14-2013
3.00
Roll Cage Prep
Details
04-21-2013
4.00
Fuel selector Valve
Details
04-15-2013
3.00
Arts and Crafts
Details
03-02-2013
2.00
Landing Gear
Details
02-16-2013
0.50
brake resevoir
Details
02-15-2013
1.00
Finishing kit
Details
02-13-2013
3.50
Turtle Deck
Details
02-12-2013
1.50
Fresh air vents
Details
02-06-2013
5.00
Rudder peds
Details
01-30-2013
4.00
Crotch belt
Details
01-23-2013
5.00
Tail Wheel
Details
01-11-2013
7.00
Electric Flaps
Details
01-04-2013
4.00
Electric Flaps
Details
12-29-2012
4.50
control bell crank and Flaps
Details
12-28-2012
4.00
manufactured Tunnle cover
Details
12-27-2012
3.00
Seats, cabin floor removal
Details
12-13-2012
4.50
Seat Frame Manufacturing
Details
08-08-2012
2.50
Arrival of Quick build Wings and fuselage
Details
SITE NAVIGATION
Contact Builder
RV 9 Home
Category
# Logs
# Hours
All
86
292
Empennage
37
130
Engine
2
3
Fuselage
30
114
Prop
1
1
Quick Build Wings
14
40
Wings
2
4
Copyright © 2001-2024 Matronics. All Rights Reserved.