KitLog pro

Powered By Kitlog Pro v2.0

My RV-8 Project
Work Logs Found: 28
Category Work Time: 89 Hours
 Date
Hours
Work Log Summary

Details

 12-27-2013
1.00
Elevator trim connector
Details
       

 12-22-2013
3.00
GTN650 GPS Antenna
Details
       

 12-22-2013
1.00
Engine ground
Details
       

 12-07-2013
3.00
Finished installing alternator
Details
       

 08-30-2013
3.00
Added 12v socket for pilot and panel strip light
Details
       

 03-26-2013
3.00
Rear seat heater
Details
       

 03-25-2013
3.00
Front seat heater
Details
       

 03-08-2013
3.00
Harness Lacing
Details
       

 02-22-2013
2.00
Battery ground
Details
       

 02-20-2013
4.00
Battery and solenoids
Details
       

 02-11-2013
4.00
Lighting Conroller installed
Details
       

 02-05-2013
2.00
Panel terminal strip
Details
       

 01-22-2013
3.00
Ran some wiring today
Details
       

 01-17-2013
6.00
Finished wiring switch panel
Details
       

 01-12-2013
6.00
Wiring switch bank
Details
       

 12-31-2012
3.00
Wired Infinity connectors
Details
       

 12-05-2012
1.00
Installed the keep alive fuse block
Details
     

 11-27-2012
4.00
Various small wiring details and SafeAir static po
Details
       

 11-11-2012
3.00
Ran VPX-Pro main power line, cleaned up bundling
Details
       

 11-07-2012
2.00
Battery hold down
Details
       

 11-06-2012
6.00
GIB 12v sockets and terminal strip wiring
Details
       

 11-01-2012
3.00
Painted assembled and started wiring switch consol
Details
       

 10-30-2012
3.00
Routed wiring bundles and zip tied
Details
       

 10-29-2012
2.00
Built the VPX-pro J2 connector
Details
       

 10-27-2012
5.00
Built VPX J1 and started running wires
Details
       

 10-26-2012
4.00
Wired J8, J10 and J12 on Vertical power
Details
       

 10-18-2012
2.00
Rockrack switches
Details
       

 10-17-2012
4.00
Switch console
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.