Powered By Kitlog Pro v2.0
Daves Web Site
Long-EZ
Ch13 Nose & NoseGear
Work Logs Found:
112
Category Work Time:
935 Hours
Date
Hours
Work Log Summary
Details
06-15-2017
4.00
Making the batteries fit
Details
06-11-2017
4.00
Nose Tie Down
Details
06-05-2017
6.00
Reinstall rudder pedals
Details
04-07-2017
6.00
Nose Gear Air seal 5
Details
04-06-2017
10.00
Nose Gear Air seal 4
Details
04-05-2017
5.00
Nose Gear Air seal 3
Details
03-22-2017
5.00
Nose Gear Air seal 2
Details
03-21-2017
5.00
Nose Gear Air seal 1
Details
02-24-2017
5.00
Nose Gear NG15 Attachment 2
Details
01-22-2017
6.00
Nose Gear NG15 Attachment 1
Details
01-05-2017
10.00
Nose Gear box inside secured
Details
11-19-2016
4.00
Nose Gear box installed
Details
11-16-2016
6.00
Nose Gear Box mold 2
Details
11-15-2016
10.00
Nose Gear Box mold 1
Details
11-13-2016
3.00
Front NG6 Cavity Cover Ver 2
Details
11-09-2016
10.00
Strut Cover (SC)
Details
11-05-2016
10.00
Front NG6 Cavity Cover
Details
11-03-2016
5.00
Rear Strut cover packer 2
Details
11-02-2016
5.00
Rear Strut cover packer 1
Details
11-01-2016
5.00
Front Strut cover packer
Details
10-31-2016
1.00
Nose Gear Doors fitted 2
Details
10-30-2016
10.00
Nose Gear Doors fitted 1
Details
10-24-2016
6.00
Nose Gear Doors, real ones
Details
10-20-2016
10.00
Nose Gear Door mockup test
Details
10-19-2016
1.00
Nose Gear Door Hardpoint Pics
Details
10-18-2016
8.00
Nose Gear Door Hardpoints 2
Details
10-17-2016
10.00
Nose Gear Door Hardpoints 1
Details
10-16-2016
4.00
Nose Gear Doors Planning 1
Details
10-15-2016
10.00
Nose gear faring 2
Details
10-09-2016
4.00
Nose gear faring layup
Details
10-06-2016
4.00
Glassing the gear leg spacer.
Details
10-04-2016
6.00
Gear Leg Faring support
Details
10-03-2016
6.00
Nose gear hard points
Details
10-02-2016
4.00
Nose gear cavity clean up
Details
09-25-2016
10.00
Finally glassing the nose bottom
Details
09-20-2016
6.00
Nose Bumper Mount
Details
08-26-2016
3.00
Inside Nose join
Details
08-24-2016
6.00
Rejoin the front hatch area
Details
08-23-2016
10.00
Add a little lip
Details
08-22-2016
3.00
Cutting the nose pieces
Details
08-21-2016
15.00
Nose Top pins slight return
Details
08-15-2016
10.00
Nose Top pins BID ply
Details
08-13-2016
10.00
Nose Top pins 3
Details
08-09-2016
10.00
Nose Top pins 2
Details
08-07-2016
10.00
Nose Top pins 1
Details
08-04-2016
10.00
Forward Nose Hatch Edges
Details
08-02-2016
10.00
Instrument Panel Hatch Edges
Details
07-31-2016
10.00
Preparing the nose cutout 2
Details
07-28-2016
20.00
Preparing the nose cutout 1
Details
07-19-2016
5.00
Glassing the Instrument Panel hatch
Details
07-17-2016
10.00
Glassing the nose hatch
Details
07-15-2016
6.00
Cutting the Instrument panel access hatch
Details
07-13-2016
10.00
Headlight mounting 8
Details
07-07-2016
10.00
Cutting the nose hatch
Details
07-05-2016
5.00
NG6 Nose pivot Cover
Details
06-30-2016
3.00
Cut the nose off for hatches
Details
06-28-2016
15.00
Glassing the Nose 1
Details
06-21-2016
15.00
Nose Carving 3
Details
06-15-2016
15.00
Nose Carving 2
Details
06-08-2016
5.00
Nose Carving 1
Details
06-07-2016
5.00
Foam blocks for the Nose 2
Details
06-06-2016
5.00
Foam blocks for the Nose 1
Details
05-10-2016
5.00
Nose gear box 5
Details
04-21-2016
5.00
Nose gear box 4
Details
04-14-2016
5.00
Nose gear box 3
Details
04-12-2016
5.00
Nose gear box 2
Details
04-10-2016
5.00
Nose gear box 1
Details
04-09-2016
10.00
Nosebox NB form 2
Details
04-05-2016
10.00
Nosebox NB form 1
Details
10-05-2014
10.00
Shaping the Nose 3
Details
10-01-2014
10.00
Shaping the Nose 2
Details
09-29-2014
10.00
Shaping the Nose 1
Details
08-23-2014
10.00
Headlight mounting 7
Details
05-21-2014
10.00
Headlight mounting 6
Details
05-13-2014
10.00
Headlight mounting 5
Details
05-04-2014
10.00
Headlight mounting 4
Details
04-23-2014
10.00
Headlight mounting 3
Details
04-19-2014
10.00
Headlight mounting 2
Details
03-13-2014
10.00
Headlight mounting 1
Details
12-09-2013
10.00
Nose shape and light Planning
Details
12-08-2013
10.00
Nose Light Planning
Details
11-04-2013
10.00
Rewire Nose lift
Details
10-21-2013
10.00
Install rudder pedals
Details
10-20-2013
10.00
Pivot Block layups
Details
10-18-2013
10.00
Extra Floor Tapes
Details
10-17-2013
10.00
Fit Pivot Blocks
Details
10-16-2013
10.00
Pivot Block nutplates
Details
06-21-2013
10.00
Nose Lift NG1 setup
Details
06-15-2013
10.00
Nose Lift wiring and setup
Details
06-09-2013
10.00
Setting up the Nose Lift 1
Details
06-04-2013
10.00
Fitting the nose Wheel
Details
06-02-2013
10.00
Left side Inside Nose
Details
06-01-2013
10.00
Right side Nose layup
Details
05-31-2013
10.00
Gluing in The Nose sides
Details
05-30-2013
10.00
Shaping the Nose sides
Details
05-27-2013
10.00
Foam for the Nose sides
Details
05-25-2013
10.00
Glass Nose Floor
Details
05-24-2013
10.00
Nose Floor Foam
Details
05-20-2013
10.00
Strut flush fit
Details
05-15-2013
10.00
Nose Box Tapes
Details
05-14-2013
10.00
Add Nose box to Fuselage
Details
03-27-2013
10.00
Nose box tapes
Details
03-26-2013
10.00
NG31 & F6 Nose box building
Details
03-23-2013
10.00
Install NG1 onto NG6A
Details
03-20-2013
10.00
Front strut BID wrap
Details
03-16-2013
10.00
NG30 trial fittings
Details
02-13-2013
10.00
Manufacture of NG8 Nose Gear plates
Details
10-15-2012
10.00
NG30 outside layup
Details
10-14-2012
10.00
NG30 more prep
Details
09-27-2012
10.00
NG30 Pads
Details
09-26-2012
10.00
Glassing NG30's
Details
09-25-2012
10.00
NG 30's Nose Gear Bulkheads
Details
SITE NAVIGATION
Contact Builder
Long-EZ Home
Category
# Logs
# Hours
All
822
6788
Avionics
1
1
Ch C HeadLight
1
6
Ch D Wheel Pants
20
152
Ch E Oxygen System
1
1
Ch10 Roncz Canard
23
227
Ch11 Elevators
34
270
Ch12 Canard Install
9
73
Ch13 Nose & NoseGear
112
935
Ch14 CS Spar
54
528
Ch16 Control System
18
93
Ch18 Canopy
2
4
Ch19 Wings & Alieron
122
1066
Ch20 Winglet/Rudder
68
510
Ch21 Wing Strakes
46
268
Ch22 Electrical
1
10
Ch24 Covers/Fairings
17
132
Ch25 Finishing
7
105
Ch3 Education
2
20
Ch4 Bulkheads
29
286
Ch5 Fuselage Sides
33
330
Ch6 Assembly
29
282
Ch7 Fuse Exterior
14
140
Ch8 Rollover/Belts
15
120
Ch9 Main Gear& Brake
69
682
ChA Cabin Oil Heater
60
334
ChB Foot Rests
3
16
Engine Installation
9
74
Ferry Tank
1
6
MILESTONES
6
6
Pitch Trim
3
10
Roll Trim
1
10
Strange Tips
2
4
Tests
8
57
Wheel Pants
1
20
Wheel Pants
1
10
Copyright © 2001-2024 Matronics. All Rights Reserved.