KitLog pro

Powered By Kitlog Pro v2.0

Michaels Web Site
Work Logs Found: 77
Category Work Time: 258 Hours
 Date
Hours
Work Log Summary

Details

 11-13-2022
5.00

       

 11-06-2022
5.00
Flap and Aileron Connection
Details
       

 11-05-2022
7.00
Wing Connection and final install
Details
       

 09-18-2022
3.00
Flap Hinge at the Fuse
Details
       

 08-20-2022
5.00
Pito Tube Install
Details
       

 08-20-2022
2.00
Installed Fuel Filter and rerouted Airlines for Pi
Details
       

 07-23-2022
6.00
Wing Final Prep
Details
       

 05-28-2022
4.00
Wing Final Install
Details
       

 05-21-2022
6.00
Wing Final Aileron Install
Details
       

 03-12-2022
6.00
Final installation of the Electronic parts on the
Details
       

 11-27-2021
10.00
Pollished Left Wing
Details
       

 11-08-2014
6.00
Right Wing
Details
       

 11-01-2014
5.00
Left Wing Details
Details
       

 04-12-2014
2.50
Flap Preperation
Details
       

 03-27-2014
5.00
Final Sanding of the right Wing top
Details
       

 01-05-2014
2.00
Finising the Top Side of the Wing
Details
       

 10-23-2013
5.00
Finishing Wing Underside
Details
       

 10-15-2013
5.00
Filling Sanding Filling...
Details
       

 10-11-2013
2.00
Closing the Aileron Gap
Details
       

 10-09-2013
1.50
Landing Light Frame Install
Details
       

 10-07-2013
2.00
Aileron Gap
Details
       

 10-06-2013
2.00
Finished the Flap Gap
Details
       

 10-05-2013
2.00
A few Little Jobs
Details
       

 10-04-2013
3.00
Wing Tip Attached
Details
       

 10-03-2013
3.00
Wing Tip Prep
Details
       

 10-02-2013
5.00
Flap Gap Close Up
Details
       

 10-01-2013
3.00
Wing Tip Rib
Details
     

 09-30-2013
5.00
Wing Tip Line up
Details
       

 09-28-2013
2.00
Wing Tip Alignment
Details
       

 09-27-2013
1.00
Outer Aileron Bracket
Details
       

 09-27-2013
4.00
Aileron Brackets
Details
       

 09-25-2013
3.00
Installed the Flap and Wing Tip Vent
Details
       

 09-24-2013
1.00
Fuse with Right Wing
Details
     

 09-22-2013
2.00
Right Wing AOI Nutplate
Details
       

 09-21-2013
6.00
Top Wing Fairing
Details
       

 08-10-2013
1.50
Installing the Flap Bracket
Details
       

 07-06-2013
4.00
More Finishing Work
Details

 06-30-2013
2.00
Aileron Linkage and more Filling
Details
       

 06-23-2013
2.00
Test Fit of Flap and Aileron and Cutting Trailing
Details
       

 06-16-2013
2.00
More Filling and Sanding
Details
       

 06-15-2013
3.00
Flap Bracket and Landing light install
Details
       

 06-08-2013
2.00
Finishing the Aileron
Details
       

 06-02-2013
2.00
More Filling Work
Details
       

 06-01-2013
5.00
Wing Tip Fibre glassing
Details
       

 05-26-2013
3.00
Preperation for Glassing the Tip
       

 05-11-2013
5.00
Wing Tip Gluing
Details
       

 04-21-2013
4.00
Closing the Wing Tip Aileron Gap
Details
       

 04-13-2013
10.00
Wing Tip Profile
Details
       

 03-29-2013
2.00
Wingtip Trailing Edge
Details
       

 03-29-2013
2.00
Wingtip prep Work
Details
       

 03-27-2013
5.00
Wingtip work
Details
       

 03-26-2013
2.00
Installing the Aileron Hinges
Details
       

 03-25-2013
1.00
Position of Out-board Bracket
Details
       

 03-25-2013
2.00
Bending the Inboard Aileron Hinge
Details
       

 03-24-2013
2.00
Installing the Flaps
Details
       

 03-24-2013
1.50
Flap Cut-out
Details
       

 01-13-2013
1.50
Access Cover
Details
       

 01-12-2013
3.50
Fuel Sender Probe
Details
       

 01-06-2013
3.00
More prep work
Details
       

 12-30-2012
4.00
Wing Prep Work Number Two
Details
       

 12-30-2012
6.00
Deja-vu Strikes me, same Work for the Second Wing
Details
     

 12-29-2012
2.00
Landing Light Prep Work
Details
       

 12-29-2012
2.00
Fuel Filler Sanding and FIlling
Details
       

 12-26-2012
3.00
Fuel Filler Cap
Details
       

 12-23-2012
3.00
Frame Cut-out and Preparation
Details
       

 12-23-2012
2.00
Finishing little things
Details
       

 12-22-2012
3.00
Flap Filling and Rework
Details
       

 12-22-2012
2.00
Cutting Templet for Landing Light
Details
       

 12-16-2012
4.00
Wing Preperation
Details
       

 12-16-2012
2.00
Installed the Check Valve for theTank Vent
Details
       

 12-15-2012
1.50
Wing Preperation
Details
       

 11-25-2012
2.00
Nutplate Mounting
Details
       

 11-24-2012
2.00
Left Wing AOT Nutplate Install
Details
       

 11-18-2012
2.00
Wing AOT checked and drilled
Details
       

 10-02-2012
1.00
Spar Box Final Install
Details
       

 10-01-2012
5.00
Wing Alignment and Incident
Details
       

 09-29-2012
4.00
Install of the Spar box
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.