KitLog pro

Powered By Kitlog Pro v2.0

Marks KitLog
Work Logs Found: 127
Category Work Time: 50 Hours
 Date
Hours
Work Log Summary

Details

 02-12-2019
0.25
Sanded all glued joints on spruce framework
Details

 02-12-2019
0.50
Prepared aft side skin for gluing
Details
       

 02-12-2019
0.40
Glued aft fuselage skin in place
Details
     

 02-09-2019
0.10
Used square to mark perpendicular lines on bottom
Details
     

 02-09-2019
0.50
Used laser straight-line to lay out for top longer
Details
       

 02-09-2019
0.20
Used laser straight-line to lay out bottom-rear lo
Details
       

 02-09-2019
0.10
Used laser straight-line to lay out bottom-front l
Details
     

 02-09-2019
0.10
Test-fit F7 firewall notches onto longerons
Details
       

 02-09-2019
0.25
Test-fit bulkheads
       

 02-09-2019
0.20
Ripped forward vertical support to 5/8" to clear s
Details
     

 02-09-2019
0.25
Replaced lower longeron with single 16' piece
Details

 02-09-2019
0.10
Positioned jig block at rear-bottom of straight fr
Details
     

 02-09-2019
0.75
Marked, fit and cut vertical spruce fuselage suppo
Details
     

 02-09-2019
1.00
Marked and positioned bulkheads onto fuselage side
       

 02-09-2019
0.50
Jig blocks for straight, top longeron
Details
       

 02-09-2019
0.75
Glued fuselage framework
Details
       

 02-09-2019
0.10
Glued double top longeron
Details
       

 02-09-2019
0.10
Fuselage spruce ready to glue
       

 02-09-2019
0.10
Forward spruce vertical support down 1/8" for plyw
Details
     

 02-09-2019
0.25
Fit F10 to fuselage
Details
     

 02-09-2019
0.40
Cut 3/4" notches in F7 firewall
Details
       

 02-09-2019
0.25
Chiseled corners of notches square on F3 and test-
Details
       

 02-09-2019
0.40
BIG Mistake! Mitered lower longeron, instead of be
Details
       

 02-08-2019
0.50
Sanded scarf-side2
Details
       

 02-08-2019
0.20
Sanded scarf joints on fuselage side-too thin
Details
       

 02-08-2019
0.10
Sanded both landing gear reinforcements
Details
     

 02-08-2019
0.25
Glued plywood on Landing Gear Reinforcement-2
Details
     

 02-06-2019
1.00
Set up plywood for scarfing
Details
       

 02-06-2019
0.75
Scarfed fuselage sides (front & back)-1st side
Details
       

 02-06-2019
0.10
Sanded & trimmed plywood on Landing Gear Reinforce
Details

 02-06-2019
0.50
Made & scarfed filler piece because sides too shor
Details

 02-06-2019
0.25
Jigged and glued Landing Gear Reinforcement2
Details
       

 02-06-2019
0.50
Glued first fuselage side
Details
       

 02-06-2019
0.10
Dry-fit scarfed sides
Details
       

 02-03-2019
0.20
Laid-out fuselage sides (front & rear ) for scarfi
Details
       

 02-03-2019
0.20
Glued uprights for Landing Gear Reinforcement-2
Details
     

 02-03-2019
0.20
Glued 1/4" plywood to Landing Gear Reinforcement-1
Details
     

 02-03-2019
0.50
Cut pieces for 2nd Landing gear reinforcement
Details

 02-02-2019
0.30
Match-drilled, trimmed & sanded F8
Details
     

 02-02-2019
0.25
Laid-out wood for 2nd F9 Landing Gear support
Details
     

 01-29-2019
0.25
Sanded F3
Details
       

 01-27-2019
0.20
Trimmed aft plywood on F8
Details
     

 01-27-2019
0.25
Match-drilled front plywood on F8
Details
     

 01-27-2019
0.25
Glued aft plywood to F8
Details
     

 01-26-2019
0.25
Vertical Tail RIbs-pilot holes
Details
       

 01-26-2019
0.10
Vertical Tail ribs-clamped for drilling
Details
       

 01-26-2019
0.25
Vertical Tail ribs-aligned pilot holes & centerlin
Details
       

 01-26-2019
0.25
Test-fit scrap with 2" hole to tube
Details
       

 01-26-2019
0.30
Seat-epoxy touch-up
Details
     

 01-26-2019
0.50
Made jig for drilling Tail Rib Blocks
Details
       

 01-26-2019
0.25
Glued plywood to front of Tailpost bulkhead
Details
       

 01-26-2019
0.10
Drilled test hole in scrap for 2" hole in Vertical
Details
       

 01-26-2019
0.50
Drilled 2" holes in tail rib blocks
Details
       

 01-26-2019
0.20
Cut tail rib blocks to dimension
Details
       

 01-26-2019
0.20
Cut rough tapers on aft fuselage top & bottom plyw
Details
     

 01-26-2019
0.10
Cut rough plywood for Tailpost
Details
     

 01-26-2019
0.10
Cut edges of cutouts on F17
Details
     

 01-25-2019
0.50
Touch-up gaps on F3 & F4
Details
       

 01-20-2019
0.20
Router-trimmed aft plywood F4
Details
     

 01-20-2019
0.20
Router-trimmed aft plywood F3
Details
     

 01-20-2019
0.20
Match-drilled holes in aft plywood F4
Details
       

 01-20-2019
0.20
Match-drilled holes in aft plywood F3
Details
     

 01-19-2019
0.50
Routed edge holes for cutouts in F17
Details
       

 01-19-2019
0.50
Routed 6" center hole in F17
Details
       

 01-19-2019
0.40
Routed 5" hole in 1/8" plywood back
Details
       

 01-19-2019
0.25
Glued F14 seat pieces together
Details
     

 01-19-2019
0.50
Glued 1/8" plywood back to F4
Details
       

 01-19-2019
0.25
Cut plywood for F8 (rough)
Details
       

 01-19-2019
0.75
Cut fuselage sides (fronts) from 1/8" plywood shee
Details
       

 01-19-2019
0.25
Cut Aft fuselage pieces top & bottom (rough)
Details
     

 01-19-2019
0.01
Aircraft Plywood 1/8" Mahogany
Details
     

 01-18-2019
0.25
Glued top aft plywood to F3
Details
       

 01-16-2019
0.20
Router-trimmed bottom aft plywood
Details
     

 01-16-2019
0.25
Routed-trimmed F4 forward plywood
Details
       

 01-16-2019
0.25
Routed-trimmed F3 forward plywood
Details
       

 01-16-2019
0.25
Match-drilled holes thru F4 front plywood
Details
       

 01-16-2019
0.25
Match-drilled F3 plywood
Details
       

 01-16-2019
0.20
Match-drilled 3/16" holes in F7 reinforcements
Details
       

 01-16-2019
0.50
Glued F3 Pywood bottom-aft
Details
     

 01-14-2019
0.50
Glued top & bottom plywood on 1 side of F3
Details
       

 01-14-2019
0.60
Glued plywood reinforcements on forward face of F4
Details
       

 01-14-2019
0.20
Cut gusset corners on plywood for F4 Bottom fwd
Details

 01-13-2019
0.25
Ripped and cross-cut F7 stiffeners
Details
       

 01-13-2019
0.25
Glued & clamped F7 stiffeners
Details
       

 01-13-2019
0.20
Fuselage aft sides
Details
     

 01-13-2019
0.50
Cut Plywood (oversize) for F4 bottom
Details
       

 01-13-2019
0.30
Cut plywood (oversize) for F3 Tops
Details

 01-13-2019
0.25
Cut 1/8" plywood to slightly oversize for F17 & F4
Details
     

 01-13-2019
0.75
Cut 1/8" Plywood sheet components
Details
     

 01-13-2019
0.75
Cut 1/8" plywood components
Details
       

 01-13-2019
0.20
Cut 1/4" plywood oversize for F3 & F4 (front) rein
Details
     

 01-12-2019
0.50
Routed corner radii on F7
Details
       

 01-12-2019
0.50
Routed center hole in F7
Details
       

 01-12-2019
0.25
F7 Holes
Details
       

 01-12-2019
0.25
Cut slot in Tailpost bulkhead
Details
       

 01-12-2019
0.20
Cut F7 Firewall bulkhead to dimension
Details
     

 01-12-2019
0.20
Cut F14 Seats
Details
       

 01-08-2019
0.50
Firewall layout
Details
     

 01-08-2019
0.10
3/4" Marine AB Plywood for firewall
Details
       

 01-07-2019
0.25
Sanded F3 & F4 reglued joints
Details
     

 01-06-2019
0.50
Seats-circular cutouts
Details
       

 01-06-2019
0.50
Sanded all glue joints flush
Details
       

 01-06-2019
0.20
Removed F3,F4 &F10 from Jigs
Details
       

 01-06-2019
0.30
Re-glued F4 top piece
Details
     

 01-06-2019
1.00
Fixed F3 missing 2:" piece
Details
       

 01-06-2019
0.50
F9 Jigged & glued
Details
       

 01-06-2019
1.00
Cut 1/4" plywood sheet
Details
       

 01-05-2019
0.75
Set up F3 & F4 for gluing
Details
       

 01-05-2019
0.75
Jig for F3
Details
       

 01-05-2019
0.50
F4 Jig
Details
       

 01-05-2019
0.50
F3 Slot
Details
       

 01-05-2019
0.50
F3 Holes
Details
       

 01-02-2019
0.75
Routed 2" radius on top corners of F3 & F4 top pie
Details
       

 01-02-2019
0.10
Match-sanded arc'd top corners of F3 & F4
Details
       

 01-01-2019
0.40
Instrument Holes in F4
Details
       

 01-01-2019
1.50
Basic cuts for Scarf Jib
Details
       

 12-31-2018
0.10
Test fit all 3/4" corner notches
Details
       

 12-31-2018
0.30
Tailpost bulkhead corners
Details
     

 12-31-2018
0.25
Match-drilled 3/4" holes in F4 & F9 Seat Support
Details
       

 12-31-2018
0.50
Drilled holes in spruce bulkhead pieces
Details
       

 12-31-2018
1.00
Designed Scarf Jig for Router
Details
     

 12-31-2018
0.30
Cut corner gussets
Details
     

 12-31-2018
1.00
Cut Bulkhead Spruce to dimension
Details
     

 12-31-2018
0.50
Cut 3/4" x 3'/4" corner notches
Details
       

 12-30-2018
0.50
Planed random thickness spruce from Grab Bag to 3/
Details
     

 12-29-2018
1.50
Reviewed & Printed SW drawings for lbulkhead ayout
Details
       

 12-29-2018
2.00
Bulkhead layout on Spruce-F3,F4,F7,F9,Tailpost
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.