Powered By Kitlog Pro v2.0
Marks KitLog
DR-107
Fuselage
Work Logs Found:
93
Category Work Time:
87 Hours
Date
Hours
Work Log Summary
Details
01-14-2023
2.00
Meet with Brent
Details
12-11-2022
1.50
Labeled all fuselage standoffs
Details
12-13-2020
1.00
Dropped .190" plate and square tubing at Brent
Details
10-03-2020
4.00
Sheet 150 Parts
Details
09-26-2020
2.50
Sheet 120 Parts
Details
09-13-2020
3.50
Sheet 151, 161, 150 & 120 Parts
Details
05-12-2020
5.00
Fuselage welding jig
Details
04-05-2020
0.50
Wing Attach fitting- straps bent
Details
04-05-2020
0.50
Seatbelt & Harness attach tabs bent
Details
04-05-2020
1.00
Landing Gear Reinforcements-bent flanges
Details
03-14-2020
4.00
Dropped Fuselage at Welders
Details
03-13-2020
0.50
Vertical Fin lower crossmember
Details
03-13-2020
1.00
Fuselage onto Trailer
Details
12-02-2018
0.75
Test weld joint
Details
12-01-2018
0.50
Test Weld Joint
Details
11-30-2018
1.00
Watched gas welding videos
Details
11-28-2018
0.75
Test Weld Joint
Details
11-24-2018
1.00
Welded Cluster Mock-up #2
Details
11-10-2018
0.75
Cluster mock-up #3
Details
11-03-2018
1.00
Test weld cluster #2
Details
11-03-2018
0.75
Mock-up Cluster Joint #2
Details
10-21-2018
0.75
Mock-up #1 of fuselage top corner cluster joint
Details
10-20-2018
1.00
Mounted fuselage on rotisserie
Details
05-19-2018
0.50
Routed tailpost clamp channel
Details
05-19-2018
0.50
Mounted tailpost clamp for rotisserie
Details
04-19-2018
1.00
Picked-up 4130 parts from Billet-Proof
Details
04-19-2018
0.25
Inspected 4130 laser-cut parts
Details
04-08-2018
1.00
Finished making rotisserie for welding fuselage
Details
03-25-2018
0.50
Test weld 4130 tubing #1
Details
03-09-2018
0.50
Wire-brushed plasma-cut parts
Details
03-08-2018
0.10
Picked-up some plasma-cut parts
Details
02-16-2018
0.10
Grab-bag of scrap 4130 to practice pretty welds
Details
04-21-2017
0.25
Mounted engine stand plate on firewall clamp
Details
03-07-2017
0.50
Met with Darryl Rarick to inspect plasma cut #1
Details
03-05-2017
1.00
Made 2x4 sandwich mount for firewall tubes
Details
03-05-2017
0.50
Adapted 10" wheels to engine stand
Details
01-20-2017
0.50
Positioned & tacked vertical fin
Details
01-20-2017
0.01
No more profiled tubes left!!
Details
01-20-2017
0.75
Measured & laid-out tailpost and vertical fin
Details
01-19-2017
0.50
Tack-welded rollbar and supports
Details
01-19-2017
1.25
Jigged and leveled rollbar and braces
Details
01-19-2017
0.50
Fit & welded rear vertical supports
Details
01-17-2017
0.01
Very few tubes left!!
01-17-2017
0.25
Tacked lower tail post
Details
01-17-2017
0.75
Tacked horizontal tubes to rear seat bulkhead
Details
01-17-2017
0.75
Tack-welded firewall V-tubes to bushings
Details
01-17-2017
0.20
Roughly positioned tail vertical supports
Details
01-17-2017
1.00
Fit tail diagonal supports & tacked
Details
01-16-2017
0.50
Tacked spar-opening cross braces
Details
01-16-2017
1.50
Firewall braces & bushings:
Details
01-15-2017
5.00
Tack welded entire fuselage, except..
Details
01-11-2017
0.50
Verified Centerline at WS23.375, tacked uprights
Details
01-03-2017
0.50
Plasma-cut 4130 x 0.25 sheet
Details
01-01-2017
0.50
Tack-welded upper fuselage jig to secure
Details
01-01-2017
1.00
Re-shimmed bottom of fuselage & checked all tube f
Details
01-01-2017
1.50
Precisely leveled upper braces
Details
01-01-2017
1.00
Double-checked upper level and straightness with s
Details
12-30-2016
4.00
Leveled & straightened top, shimmed bottom, fit tu
Details
11-28-2016
1.00
Side tubes on front section roughly placed
Details
11-27-2016
0.50
Firewall board-trammeled for accuracy
Details
11-27-2016
0.30
Drilled holes for tubing in firewall board
Details
11-15-2016
0.50
Firewall board in rough position
Details
11-14-2016
0.50
Set-up Firewall board for fuselage assembly
Details
11-11-2016
0.25
Clamped fuselage top in rough position
Details
11-09-2016
0.75
Supports for 3D Fuselage Jig
11-03-2016
0.50
Tacked tail longerons
Details
11-03-2016
0.25
Tacked lower tubes - aft
Details
11-03-2016
1.00
Tack Welding on Lower fuselage completed
Details
11-03-2016
0.35
Tack welding lower-front
Details
11-03-2016
0.40
Tack welding lower fuselage
Details
11-03-2016
1.00
Ramp for lower-aft fuselage taper
Details
11-03-2016
1.50
Jigged lower fuselage on ramp
Details
10-26-2016
1.00
Set-up all tubes on Bottom of fuselage
Details
10-26-2016
2.00
Removed jig blocks for top & initial lay-out of bo
Details
10-24-2016
0.35
Weld-Test3
Details
10-24-2016
0.50
Tack-welded Fuselage Top (top side)
Details
10-24-2016
0.75
Tack-welded fuselage top (bottom side)
Details
10-23-2016
1.00
Test welds
Details
10-23-2016
0.50
Teaching Cody to gas weld
Details
10-04-2016
0.75
Fuselage top jig blocks all screwed in place
Details
10-04-2016
0.50
Aligned Outside jig blocks to centerlines with shi
Details
10-03-2016
0.50
Jigged fuselage top (initial)
Details
10-03-2016
0.75
Jig Blocks for fuselage
Details
10-03-2016
0.25
Added top fuselage diagonals
Details
10-02-2016
0.50
Fuselage top-profiled tubes selected
Details
10-02-2016
0.50
Fuselage top tubes laid-out & fit
Details
10-02-2016
2.00
Bench top fit, leveled and flattened
Details
10-01-2016
2.00
Fuselage Bench leveled and straightened
Details
11-15-2015
0.01
Turtle deck
Details
11-15-2015
0.01
Tailcone fairing
Details
11-15-2015
0.01
Stringers
Details
11-15-2015
0.01
Side panel for Fuselage
Details
11-15-2015
0.01
Drop links
Details
SITE NAVIGATION
Contact Builder
Cody's VP-1 Home
DR-107 Home
Category
# Logs
# Hours
All
648
744
Ailerons
5
3
Belly Tank
1
1
CAD
6
6
Canopy
1
0
Control Linkages
2
0
Control Stick
1
13
Cowling
3
0
Empennage
6
2
Engine
43
107
FAA
1
0
Fuel Tank
10
8
Fuselage
93
150
Harness
2
1
INSPECTIONS
1
2
Instruments & Panel
11
0
Landing Gear
2
0
Miscellaneous
5
28
Paint
1
1
Pedals
1
4
Plans
12
7
Research
6
43
Seat
6
9
Shop Supplies
3
14
SolidWorks
381
228
Spar
3
4
Tailwheel
1
1
Tools
8
8
Welding
23
74
Wings
10
30
Tailwind Home
Copyright © 2001-2024 Matronics. All Rights Reserved.