Powered By Kitlog Pro v2.0
Carbon Cub Project
CCX1865
Fuselage
Work Logs Found:
35
Category Work Time:
121 Hours
Date
Hours
Work Log Summary
Details
04-14-2013
12.00
Wing
Details
04-12-2013
14.00
Install Tail feathers
Details
04-11-2013
2.50
Fit tank Cover Panels
Details
04-08-2013
3.50
Install Windsheild
Details
04-07-2013
1.10
Install nut plates and final assemble cowling
Details
04-07-2013
4.50
Hang wings
Details
03-29-2013
1.50
Bleed Brakes
Details
03-12-2013
2.80
Install Boot Cowling
Details
10-21-2012
6.50
Side Panels of Cowl
Details
10-21-2012
1.80
Seal and Prime
Details
10-15-2012
1.80
Gascolator
Details
10-10-2012
0.50
Grommets
Details
10-09-2012
1.10
Heater Air Box
Details
10-09-2012
1.30
Firewall Insulation
Details
10-07-2012
1.90
Tunnel Angles
Details
10-07-2012
0.50
Tunnel
Details
10-07-2012
2.70
Insulation and Vinyl
Details
10-07-2012
0.20
Instrument Panel
Details
10-07-2012
2.70
Firewall Angles
Details
10-07-2012
0.50
Boot Cowl Hatch
Details
10-01-2012
3.50
Pulleys and Cables
Details
09-30-2012
3.80
Top and Front Stringer
Details
09-30-2012
4.10
Eletrical Trim
Details
09-29-2012
2.60
Vertical Fin and Rudder
Details
09-29-2012
1.50
Elevator Trim Installation
Details
09-25-2012
3.00
Fuel System
Details
09-25-2012
3.00
Fuel Line Chafe
Details
09-24-2012
3.10
Attach Floorloard to Fuselage
Details
09-21-2012
3.80
Extended Baggage
Details
09-20-2012
7.40
Extended Bagage
Details
09-19-2012
3.40
Rudder pedals
Details
09-18-2012
2.60
Install floor to frame
Details
09-14-2012
4.20
Fit Bottom floor Seat brackets, control stick
Details
09-13-2012
3.10
Install Stringers
Details
09-11-2012
8.70
Elevator cable Fairleads Blocks
Details
SITE NAVIGATION
CCX1865 Home
Category
# Logs
# Hours
All
113
626
Assemblies
7
15
Avionics
7
57
Covering
15
104
Engine
6
32
Finish
16
97
Fuselage
35
121
Miscellaneous
1
2
None
1
14
Paint
4
59
Prep Section
3
23
Wings
18
102
Copyright © 2001-2024 Matronics. All Rights Reserved.