Work Logs Found: 18
Category Work Time: 41 Hours
 Date
Hours
Work Log Summary

Details

 05-10-2014
2.00
Installed Fuel Out and Return Lines
Details
       

 05-03-2014
4.00
Plumbing the Hell Hole
Details
       

 04-26-2014
2.00
Installed Fuel Pumps
Details
       

 04-11-2014
1.00
Installed Fuel Selector Valve
Details
       

 11-24-2013
3.00
Installing Fuel Lines
Details
       

 10-13-2013
2.00
Installed Fuel Vent Lines
Details
     

 10-09-2013
2.00
BEZR-RG Fuel System
Details
     

 10-05-2013
2.00
Fuel Vent Manifold
Details
     

 02-15-2013
2.00
Designed New Fuel System
Details
     

 02-09-2013
2.00
Installed End on Fuel Vent Manifold
Details
       

 12-31-2012
2.00
Installed 2 fittings on the Fuel Vent Manifold
Details
       

 12-30-2012
1.00
Installed AN Fittings in Fuel Vent Manifold
Details
       

 12-29-2012
2.00
Fuel Vent Manifold
Details
       

 11-03-2012
2.00
Diagram of Fuel Sump
Details
       

 10-30-2012
2.00
Fuel Sump Trial Fit
Details
       

 10-19-2012
3.00
Fuel System Layout
Details
     

 09-23-2012
2.00
Completed fuel sump top cover
Details
       

 09-22-2012
5.00
Rear Fuel Sump
Details
       