Powered By Kitlog Pro v2.0
CHRISTIAN'S WEB SITE
RV-8 slow build
Wings
Work Logs Found:
38
Category Work Time:
313 Hours
Date
Hours
Work Log Summary
Details
12-14-2012
15.00
prepairng the flap parts
Details
12-14-2012
25.00
building the flaps
Details
12-11-2012
20.00
riveting the ailerons
Details
12-06-2012
20.00
Prepairing parts of ailerons
Details
11-26-2012
10.00
manufacturing of the aileron brackets
Details
11-25-2012
6.00
riveting top skins on L.H.wing
Details
11-24-2012
10.00
assembling the L.H. leading edge
Details
11-18-2012
3.00
pressure leak check of the L.H Tank
11-14-2012
25.00
riveting the L.H. Tank
Details
11-12-2012
10.00
prepairing parts for inverted fuel system
Details
11-09-2012
6.00
clecoing and matchdrilling the L.H.wing
11-06-2012
5.00
Riveting the top skins to the R.H.wing
Details
11-05-2012
5.00
R.H.wing leading edge completed and riveted to spa
Details
11-02-2012
4.00
R.H.fuel tank leak check
Details
10-25-2012
10.00
Alteration of fuel sender position
Details
10-23-2012
10.00
assembling of the R.H.fuel tank
10-19-2012
5.00
Riveting the stiffeners,drain flange and filling n
Details
10-18-2012
3.00
roughtening of the right tank mating surfaces
Details
10-17-2012
4.00
10:1 balance build
Details
10-16-2012
10.00
final preperation of The R.H tank parts
Details
10-15-2012
4.00
fabrication of the T-405 angles
Details
10-13-2012
2.00
tank ribs prepaired
Details
10-13-2012
3.00
prepairing the Z brackets
Details
10-13-2012
6.00
matchdrilling the R.H.tank skins to the baffle and
Details
10-04-2012
12.00
prepairing the leading edge
Details
10-02-2012
6.00
priming the leading edge ribs
Details
10-02-2012
2.00
matchdrilling R.H.wingskins
10-01-2012
5.00
Fitting the skins
Details
09-30-2012
10.00
wing jig finished
Details
09-27-2012
6.00
assembling the wing skeleton
Details
09-24-2012
5.00
main ribs primed
Details
09-23-2012
6.00
Main ribs preperation for priming
Details
09-22-2012
3.00
rib preperation for matchdrilling
09-18-2012
3.00
riveting the rear spars
09-18-2012
8.00
fabricate the tie-down assemblyes
Details
09-15-2012
15.00
rear spar preperation
Details
09-14-2012
6.00
Main spar plate nuts inst.
Details
09-13-2012
5.00
main spar countersinking
Details
SITE NAVIGATION
Contact Builder
RV-8 slow build Home
Category
# Logs
# Hours
All
47
373
Empennage
8
57
Miscellaneous
1
3
Wings
38
313
Copyright © 2001-2024 Matronics. All Rights Reserved.