KitLog pro

Powered By Kitlog Pro v2.0

TAB Aircraft LLC Web Site
Work Logs Found: 67
Category Work Time: 130 Hours
 Date
Hours
Work Log Summary

Details

 05-14-2014
1.00
Page 495 Installed Paddles
Details
       

 03-12-2014
2.00
Page 482 Finishing up the Right Canopy
Details
       

 03-11-2014
1.50
Page 481 Setting the Lexan Right Side
Details
       

 03-10-2014
2.50
Page 480 Started on the Right Canopy
Details
       

 03-09-2014
0.50
Page 479 Finale Assembly of Left Canopy
Details
       

 03-08-2014
2.00
Page 478 Painted and Assembled Canopy
Details
       

 03-07-2014
2.50
Page 477 Drilling the Canopy Guides and Braces
Details
       

 03-06-2014
1.50
Page 476 Trimmed Front Edge of the Lexan
Details
       

 03-05-2014
1.00
Page 475 Setting the Lexan Left Side
Details
       

 03-04-2014
1.00
Page 474 2nd try on the Canopies
Details
       

 03-03-2014
10.00
Page 473 Tried to make the Canopies
Details
       

 03-02-2014
0.33
Page 472 Installed Windshield Weather Seal
Details
       

 02-27-2014
2.00
Page 469 Installed Windshield
Details
       

 02-26-2014
0.50
Page 468 Set up for Windshield Install
Details
       

 02-25-2014
2.00
Page 467 Painting the Windshield
Details
       

 02-16-2014
0.50
Page 458 Installed Fire Extinguisher
Details
       

 01-12-2014
4.00
Page 443 Get Back to Work
Details
       

 01-05-2014
1.00
Page 442 Check the fit
Details
       

 01-04-2014
2.00
Page 441 Trimmed and Fitted the Canopy
Details
       

 01-01-2014
1.00
Page 440 Doing it my way
Details
       

 12-31-2013
1.00
Page 439 Checking the Canopy Fit
Details
       

 12-30-2013
1.00
Page 438 Installation of Windshield to the Tube
Details
       

 12-19-2013
2.00
Page 432 Installed Lower Canopy Track
Details
       

 12-18-2013
0.75
Page 431 Insulating the Heater Pipes
Details
       

 10-03-2013
5.00
Page 369 Made up the Main Panel
Details
       

 09-16-2013
1.00
Page 353 Connecting Pull Cables
Details
       

 09-15-2013
6.00
Page 351 Painted Dash and Installed Panels
Details
       

 09-14-2013
6.00
Page 350 Making more Backing Plates
Details
       

 09-12-2013
3.00
Page 348 Making Panels, Center & Console
Details
       

 09-11-2013
1.00
Page 347 Fixing a mistake
Details
       

 09-10-2013
5.00
Page 346 Making Panels, Center
Details
       

 09-09-2013
8.00
Page 345 Making Panels, Right Wing & Right Main
Details
       

 09-08-2013
2.50
Page 344 Completing the Throttle Connection
Details
       

 09-07-2013
1.00
Page 343 Throttle Connection
Details
       

 08-31-2013
2.00
Page 331 Installing Lower Canopy Track
Details
       

 08-29-2013
1.50
Page 329 Installing the Seat Belts
Details
       

 08-28-2013
2.00
Page 328 Installing Seat Carpet
Details
       

 08-27-2013
2.00
Page 327 Installing the Map Box Carpet
Details
       

 08-26-2013
2.00
Page 326 Installing the Center Console Assembly
Details
       

 08-25-2013
3.00
Page 325 Installing the Center Console Assembly
Details
       

 08-07-2013
0.50
Page 304 Installed Heater Shutoff Valve
Details
       

 07-21-2013
0.00
Page 286 Reversing the Throttle Part 2
Details
       

 07-20-2013
1.00
Page 285 Reversing the Throttle Part 1
Details
       

 06-16-2013
0.50
Page 267 Dash Upholstery Tucking
Details
       

 06-15-2013
0.50
Page 266 Dash Upholstery Attachment
Details
       

 06-07-2013
1.00
Page 263 Heater bracing and Hose connection
Details
       

 06-06-2013
1.50
Page 262 Installed Heater
Details
       

 05-27-2013
3.00
Page 256 Painting the LSX Panel and Console
Details
       

 05-23-2013
3.00
Page 252 Setting the Sub-Panels in the LSX Panel
Details
       

 05-22-2013
3.00
Page 251 Cutting and filing
Details
       

 05-21-2013
1.00
Page 250 Cut the right wing & left main sub-panel
Details
       

 05-20-2013
1.00
Page 249 Making Instrument Sub-Panels
Details
       

 05-19-2013
0.00
Page 248 Not all is perfect
Details
       

 05-18-2013
1.00
Page 247 Setting the LSX Panel
Details
       

 05-17-2013
1.00
Page 246 Making Instrument Panel Extension
Details
       

 05-16-2013
2.00
Page 245 Mine is better than yours
Details
       

 01-06-2013
0.50
Page 149 Installed the Rudder Foot Pad
Details
       

 01-03-2013
1.00
Page 147 Temporally Installing the Console 8
Details
     

 12-30-2012
2.00
Page 143 Temporally Installing the Console 7
Details
       

 12-29-2012
1.00
Page 142 Temporally Installing the Console 6
Details
       

 12-28-2012
0.50
Page 141 Temporally Installing the Console 5
Details
       

 12-27-2012
1.00
Page 140 Temporally Installing the Console 4
Details
       

 12-26-2012
2.00
Page 139 Temporally Installing the Console 3
Details
       

 12-25-2012
1.00
Page 138 Temporally Installing the Console 2
Details
       

 12-24-2012
2.00
Page 137 Temporally Installing the Console 1
Details
       

 12-23-2012
2.00
Page 136 Getting Nose Deck ready for the Panel
Details
       

 09-28-2012
2.00
Page 83 LSX Seat Installatoin
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.