Powered By Kitlog Pro v2.0
Rob's REBVAIR Project
REBVAIR
Firewall Forward
Work Logs Found:
48
Category Work Time:
365 Hours
Date
Hours
Work Log Summary
Details
09-20-2020
2.00
battery charging receptacle and related wiring
Details
08-25-2018
1.00
DIY Firesleeve dip
Details
06-01-2018
4.00
carburetor installation
Details
05-29-2018
4.00
Engine compartment clean up
Details
04-03-2016
6.00
torquing motor mount bolts
Details
08-10-2015
3.00
Over-voltage Protection module test
Details
07-26-2015
3.00
Dressing distributor cap wires
Details
07-25-2015
3.00
Starter switch and power wires
Details
07-24-2015
3.00
Alternator and tach sensor wiring
Details
07-23-2015
3.00
Master solenoid
Details
07-21-2015
4.00
ignition wiring part 2
Details
07-20-2015
3.00
Ignition wiring Part 1
Details
07-01-2015
2.00
Fuel line to carb
Details
06-15-2015
3.00
Oil Breather line install
Details
06-13-2015
1.00
air oil separator
Details
06-06-2015
3.00
gascolator to carburetor line
Details
06-02-2015
4.00
Oil cooler lines
Details
05-31-2015
4.00
Heat muff
Details
05-26-2015
4.00
Cabin heat control
Details
05-23-2015
4.00
Carb heat control
Details
05-22-2015
4.00
Mixture control cable routing
Details
05-21-2015
3.00
Throttle control cable part 3
Details
05-20-2015
4.00
Throttle control cable part 2
Details
05-12-2015
4.00
Throttle control cable part 1
Details
05-10-2015
2.00
Firewall Pass-through
Details
12-10-2014
5.00
Panel Part 5
Details
11-13-2014
6.00
Baffling part 8
Details
11-02-2014
2.00
Battery Bracket
Details
11-01-2014
4.00
Electrical Part 2
Details
06-02-2014
4.00
Gascolator install
Details
05-28-2014
4.00
Coil/gascolator cooling box Part 4
Details
05-24-2014
10.00
Coil/gascolator cooling box Part 3
Details
05-21-2014
2.00
Coil/gascolator cooling box Part 2
Details
05-18-2014
2.00
Coil/gascolator cooling box Part 1
Details
05-07-2014
2.00
Engine Baffling: Part 7
Details
05-06-2014
2.00
Engine Baffling: part 6
Details
05-05-2014
2.00
Engine Baffling Part 5
Details
05-01-2014
10.00
Engine Baffling Part 4
Details
04-02-2014
4.00
Engine Baffling part 3
Details
04-01-2014
4.00
Engine Baffling part 2
Details
03-31-2014
4.00
Engine Baffling Part 1
Details
10-24-2013
3.00
Cowling exit fairing
Details
10-05-2013
2.00
Hanging the Engine (part 2)
Details
10-05-2013
2.00
Hanging the engine (part 1)
Details
09-01-2012
30.00
Engine mount attach points
Details
08-26-2012
50.00
Engine mount reinforcements
Details
08-13-2012
30.00
Engine Mount - part 2
Details
08-13-2012
100.00
Engine Mount - part 1
Details
SITE NAVIGATION
Contact Builder
REBVAIR Home
Category
# Logs
# Hours
All
283
1774
control surfaces
4
51
controls
22
137
Cowling
22
108
elevator install
4
17
Empennage
7
86
Engine
5
10
engine accessories
3
8
Firewall Forward
48
365
Fuselage
74
450
gear install
10
86
General
4
58
Instrument Panel
48
217
paint
1
5
Panel
1
2
Parachute
11
41
Prop
1
2
Wing
9
57
wing install
9
74
Copyright © 2001-2025 Matronics. All Rights Reserved.