Powered By Kitlog Pro v2.0
BEZJet Build
BEZJet
Winglet
Work Logs Found:
38
Category Work Time:
110 Hours
Date
Hours
Work Log Summary
Details
06-01-2013
2.00
Installed Left Winglet Cap
Details
04-27-2013
2.00
Making Winglet Cap for Pitot Tube
Details
03-30-2013
2.00
Installed Rudder Stop and Hook for Return Spring
Details
03-30-2013
2.00
Closed in Winglet end
Details
03-23-2013
3.00
Glassed Hidden Bell crank in place
Details
03-10-2013
4.00
Completed the Installation of the Carbon Hinges
Details
03-09-2013
2.00
Installed the Right Rudder return spring
Details
03-09-2013
4.00
Bonded the Rudder Hinge to the Rudder and Winglet
Details
03-03-2013
3.00
Prepairing to Install Carbon Right Rudder Hinge
Details
03-01-2013
4.00
Right Winglet Trailing edge Spar
Details
02-24-2013
0.50
Removed Peel Ply from Top Structural Layup of Righ
Details
02-24-2013
2.50
Embedded the Pitot Conduit into Right Rudder
Details
02-23-2013
4.00
Completed Right Wing Top Structural Layup
Details
02-08-2013
1.00
3rd Outside layup Complete
Details
02-01-2013
4.00
Completed Layup #3 Outside Layup
Details
01-06-2013
4.00
Completed Inside Layup
Details
01-05-2013
3.00
Prepared Right Winglet/wing for Inside Layup
Details
01-02-2013
2.00
Bondowed Right Winglet in Place
Details
12-31-2012
2.00
Winglet Internal Bell Horn Ferring
Details
12-30-2012
1.00
Winglet Ferring for Internal Rudder Bell Horn
Details
12-29-2012
2.00
Building Ferring for Left Rudder Internal Bell Hor
Details
12-02-2012
1.00
Trimmed Left Winglet Rudder Channel
Details
12-01-2012
3.00
Cut out Left Rudder
Details
11-25-2012
4.00
Completed Left Wing Top Structural Layup
Details
11-24-2012
2.00
Winglet ready for top Layup
Details
11-23-2012
4.00
Completed the Outside Structural Winglet Layup
Details
11-23-2012
3.00
Completed Layup of Right Winglet Skin
Details
11-13-2012
2.00
Trimmed and Sanded Left Inside Winglet Attachment
Details
11-11-2012
4.00
Completed Inside Layup of Left WInglet
Details
11-10-2012
5.00
Prepaired Left Winglet for Inside Layup
Details
11-04-2012
3.00
Attached Left Winglet with Bondo
Details
11-03-2012
3.00
Right Winglet Skinning
Details
10-29-2012
1.50
Prepping Wing for Winglet for Attchment
Details
10-20-2012
4.00
Completed Outboard Layup on Left Winglet
Details
10-07-2012
4.00
Glassed Left Outboard Winglet
Details
09-23-2012
4.00
Completed the installation of Comm Antenna into Le
Details
09-22-2012
4.00
Installed Comm Antenna into Left Winglet
Details
09-08-2012
5.00
Installed Comm Antenna into Right Winglet
Details
SITE NAVIGATION
Contact Builder
BEZJet Home
Category
# Logs
# Hours
All
284
1426
Aileron
4
8
Antenna
2
4
Brakes
3
18
Canopy
29
211
Cockpit
15
46
Electrical
11
64
Engine
9
85
Firewall
3
5
Flight Controls
6
9
Fuel Sump
1
2
Fuel System
18
41
Fuselage
40
340
Intake
13
99
Miscellaneous
3
17
MLG
17
50
Motor Mount
2
52
Nose
2
8
Nose Landing Gear
5
16
Rudder
16
44
Speed Brake
1
3
Strakes
42
168
Winglet
38
110
Wings
4
26
Copyright © 2001-2024 Matronics. All Rights Reserved.