Powered By Kitlog Pro v2.0
Derek & Kims RV-9A Build Log
RV-9A
Fuselage
Work Logs Found:
71
Category Work Time:
190 Hours
Date
Hours
Work Log Summary
Details
01-19-2014
4.00
Bleed the Brakes
Details
07-07-2013
2.00
Glare Shield Paint
Details
03-17-2013
2.00
Fab Wing Attach Angles
Details
03-03-2013
1.00
Riveted Rear Fuselage
Details
03-03-2013
5.00
Dimpled Front Top Skin
Details
02-21-2013
2.00
Install Rudder Cable
Details
02-17-2013
12.00
Fitted Empennage
Details
02-16-2013
4.00
Riveted Top Forward aft Skin
Details
02-09-2013
2.00
ELT Antenna Doubler
Details
02-03-2013
2.00
Up Elevator Stop
Details
02-01-2013
1.00
Installed "B" nuts
Details
01-30-2013
1.00
Aileron pushrod boots
Details
01-27-2013
4.00
Install Aileron Trim
Details
01-26-2013
2.00
Static Line
Details
01-26-2013
2.00
Riveted Dorward Deck
Details
01-25-2013
3.00
Install Manual Trim Cable
Details
01-20-2013
1.00
Rudder Cable Exits
Details
01-20-2013
2.00
Fuel Pump Lines
Details
01-18-2013
1.00
Seats Arrive
Details
01-18-2013
2.00
Reinstall Panel
Details
01-06-2013
2.00
Panel and throttle brackets
Details
01-06-2013
2.00
Cockpit Vents
Details
01-05-2013
3.00
Panel / Vent Brackets
Details
01-03-2013
3.00
Fit Forward Fuse and Top Skin
Details
01-02-2013
2.00
Subpanel Structure
Details
01-01-2013
8.00
Fuel & Brake Lines
Details
01-01-2013
1.00
Brake / fuel Line Photos
12-21-2012
1.00
Bug Screen over Fresh Air Inlets
Details
12-18-2012
2.00
Re-Install Flap Motor
Details
12-17-2012
1.00
Fuel Valve Assembly
Details
12-17-2012
3.00
Autopilot Pitch Servo Bracket
Details
12-16-2012
1.00
Install ELT Bracket
Details
12-16-2012
1.00
Install Brake Master Cylinder
Details
12-15-2012
6.00
center cockpit floor
Details
12-14-2012
4.00
Flap Motor Bracket install
Details
12-13-2012
2.00
Flap Motor Bracket
Details
12-10-2012
2.00
Riveted Baggage Floors
Details
12-09-2012
3.00
Finish Seat Backs
Details
12-08-2012
3.00
Start Drilling Seat Backs
Details
12-08-2012
2.00
Rivet Steps In Place
Details
12-02-2012
1.00
Install Naca Vents
Details
12-02-2012
2.00
Fab tunnel brackets
12-02-2012
3.00
Fab & Install Baggage Area Tie-Downs
Details
12-01-2012
3.00
Installed Parking brake and bracket
12-01-2012
5.00
Install Crotch Strap Kit
Details
11-28-2012
0.50
Static Ports
Details
11-25-2012
2.00
Aft Fuselage
Details
11-23-2012
1.00
F-757's
Details
11-23-2012
3.00
Brake / Rudder Assembly Assembly
Details
11-22-2012
1.00
Fab Elevator Bell Crank
Details
11-21-2012
2.00
Rudder/brake assembly
Details
11-21-2012
2.00
Misc. Tasks
Details
11-20-2012
2.00
Fab Elevator Pushrod Tubes
Details
11-20-2012
1.00
Anodize Brake Pedals
Details
11-19-2012
4.00
Rudder Pedal Fab
Details
11-18-2012
4.00
Interior cockpit painting
Details
11-18-2012
8.00
Install Landing Gear Mounts
Details
11-18-2012
0.00
Gear Mount Photos
11-15-2012
6.00
Install Dual Step(s) Kit and Misc As-Built.
Details
11-07-2012
3.00
Step Kit Holes
Details
11-04-2012
2.00
Install Tail Tie Down
Details
11-03-2012
4.00
Fab/Install Seat Back upright Supports
Details
10-28-2012
2.00
Fabricate Tail Tie Down
Details
10-28-2012
4.00
Control Stick Linkage
Details
10-27-2012
8.00
Start QB As-Built
Details
10-26-2012
2.00
Fuse parts Inventory
Details
10-25-2012
4.00
Wash Film from QB Fuse
Details
10-24-2012
2.00
Un-Crate the QB Fuse
Details
10-22-2012
1.00
Unload QB Fuse from ABF Truck
Details
10-18-2012
0.00
QB Fuse Shipped
Details
08-24-2012
1.00
Ordered QB Fuse
Details
SITE NAVIGATION
Contact Builder
RV-9A Home
Category
# Logs
# Hours
All
350
1491
"History"
1
Aircraft
2
290
AROW
3
24
Avionics
18
118
Empennage
55
180
Engine
6
29
Finish Kit
60
218
Firewall Forward
30
104
Fuselage
71
190
Lighting
13
24
Miscellaneous
6
22
Panel
12
22
Prop
1
1
Safety
1
Shop Supplies
3
12
Tools
5
1
Wings
63
256
Copyright © 2001-2024 Matronics. All Rights Reserved.