KitLog pro

Powered By Kitlog Pro v2.0

Davids Web Site
Work Logs Found: 74
Category Work Time: 269 Hours
 Date
Hours
Work Log Summary

Details

 10-19-2014
9.50
Completion of Right Wing tank
Details
       

 10-13-2014
4.00
Installation of Auto pilot servo
Details
       

 10-12-2014
3.00
Completion of Aeirlon and installation on wing
Details
       

 09-28-2014
4.00
Dimpling outet Right hand wing skins
Details
       

 09-20-2014
7.00
Dimpling wing skins
Details

 09-07-2014
7.50
Match drilling, dimpling, inspection platenuts etc
Details
       

 08-10-2014
6.50
Completing Wing Tank left side
Details

 03-23-2014
2.00
Attaching the Aierlon Gap seal
Details

 03-22-2014
5.00
Completioin of Aierlon - Left Side
Details

 03-09-2014
4.00
Completion of Aierlon
Details
       

 03-02-2014
1.00
Completing the right flap
Details

 02-10-2014
4.00
Aierlon Hinge and Brackets and pushtubes
Details
       

 01-26-2014
1.00
Aierlon Bracket and Bellcrank
Details

 01-25-2014
1.50
Aierlon Brackets and bellcrank
Details

 01-01-2014
5.00
Reviewing aft work on left wing
Details

 12-26-2013
2.00
Aierlon skin riveting
Details
       

 10-14-2013
1.00
Aierlons and review after move
Details

 05-25-2013
6.00
Left Flap
Details
       

 05-08-2013
2.00
Took down uprights and moving on to Flaps
Details
       

 05-05-2013
5.00
placed right wing skin on the ribs and riveted all
       

 05-04-2013
7.00
Preparing the trim and flap, aierlon bits for prim
Details
       

 04-13-2013
2.00
Deburring right wing inboard panel
Details

 02-24-2013
6.00
Right tank assembly and Pro SEAL 5 of 7 ribs
Details
       

 02-16-2013
6.00
Wings and skins
Details
       

 02-13-2013
3.00
Assembly of leading edge right wing
Details

 02-11-2013
1.00
Finished the rear lower rivets in wing
Details

 02-05-2013
1.00
prepared the leading edge and riveted to Spar
Details

 02-03-2013
8.00
Riveting the wing skins to the skeleton

 02-02-2013
3.00
Placing the skins onto the wing skeleton

 01-21-2013
1.50
Assembled leading edge section and W 423
Details

 01-20-2013
5.00
Removed Leading edge and dimpled ribs and skins
Details

 01-19-2013
3.00
Dimmpling of wings skins
Details
     

 01-01-2013
4.50
Installation of tank Stiffeners, drain and filler
Details
       

 12-30-2012
5.00
Fuel Tanks
Details

 12-26-2012
5.00
Capacitative fuel quantity sender Left tank
Details
       

 12-22-2012
3.00
Vent tube holders and dimpling tanks ribs
Details

 12-02-2012
4.00
Fit the drain and fill flanges and dimple T skin
Details

 11-30-2012
1.00
Coountersink the T 701 to the Tank Baffle holes
Details

 11-04-2012
5.00
Wing tank work
Details
       

 11-03-2012
3.00
Fabrication of T 403 angle and install T 410
Details
       

 10-27-2012
0.50
forming T 405 Tank attach angle
Details

 10-17-2012
4.00
Intsallation of tank 708 Access Plates Right and
Details
       

 09-30-2012
2.00
Installing fuel drain valves and fuel tank non ven
Details
       

 09-23-2012
2.50
installing the Capacitative fuel quantity sender
Details

 09-05-2012
3.50
Dimpling the tank skins
Details

 08-21-2012
5.00
Right wing tank preparation and assembly
Details
       

 06-05-2012
2.00
Continuing the install to left wing of the Z angle
Details

 06-04-2012
2.00
Fixing nutplates to Z angle and bolting to spar
Details

 05-26-2012
1.00

Details

 05-24-2012
3.00
Leading edge assembly
Details

 05-06-2012
5.90
Affixing the skins and match drilling to Spar and
Details
       

 05-05-2012
3.00
Affix clecoes to wing skins and to Spar
Details

 04-09-2012
0.50
Drilled doubler to the wings skin
Details

 04-08-2012
4.00
prime wing skins
Details

 04-02-2012
1.00
making wing walk doubler
Details

 04-01-2012
9.00
Preparation of wing skins and jigs
Details

 03-12-2012
1.00
Installation of grommets in wing
Details

 03-09-2012
1.50
Orgnizing the wing skin parts
Details

 03-04-2012
4.00
Reinstalled wing to upright holders and took out r
Details

 03-03-2012
6.00
erection of wing jig
Details

 02-28-2012
1.00
Rib Straightening
Details
       

 02-25-2012
5.00
Completing the rear right spar
Details
     

 02-20-2012
2.00
Preparation of the rear spar, doubler installation
Details

 02-19-2012
8.00
Painting, priming, painting some more........
Details
       

 02-18-2012
8.00
Preparing the Wing components for assembly
Details
       

 02-11-2012
4.00
Rear Spar
Details

 02-08-2012
3.00
Preparation of rear wing spar
Details

 02-06-2012
1.00
Aierlon hinges
Details

 02-05-2012
6.00
Installing the aierlons bellcrank
Details
     

 02-04-2012
3.00
Wing Tie Downs
Details
       

 02-01-2012
2.00
Install platenuts for access panels on wing spars
Details

 01-30-2012
2.50
Continuing the installation of platenuts on right
Details
     

 01-26-2012
3.00
Preparing the Spar for the wing tanks
Details
       

 01-22-2012
1.00
Reading the Wings section over
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.