Powered By Kitlog Pro v2.0
TAB Aircraft LLC Web Site
Searey LSX
Turtle Deck
Work Logs Found:
16
Category Work Time:
32 Hours
Date
Hours
Work Log Summary
Details
02-19-2013
1.50
Page 190 The Devil is in the details
Details
02-03-2013
0.00
Page 174 Visit to the Paint Shop 3
Details
12-20-2012
1.00
Page 133 Fiberglass Repair
Details
12-19-2012
2.00
Page 132 Installing Bulkhead Support 1
Details
12-18-2012
1.50
Page 131 Installed Root Support Mounting Angle
Details
11-15-2012
2.00
Page 100 Setting the Turtle Deck into Place
Details
11-05-2012
4.00
Page 97 Carpeting the inside of the Turtle Deck
Details
11-04-2012
1.00
Page 96 Carpeting the inside of the Turtle Deck
Details
11-01-2012
5.00
Page 95 Preparing the Turtle Deck Part 4
Details
10-19-2012
1.00
Page 93 Preparing the Fuel Fill Connection Part 3
Details
10-18-2012
1.00
Page 92 Preparing the Fuel Fill Connection Part 2
Details
10-16-2012
4.00
Page 91 Preparing the Turtle Deck Part 3
Details
10-03-2012
1.00
Page 87 Preparing the Turtle Deck Part 2
Details
09-29-2012
3.00
Page 84 Preparing the Turtle Deck Part 1
Details
09-10-2012
2.00
Page 69 Temporarily installed Turtle Deck
Details
08-03-2012
2.00
Page 35 Test Setting the Turtle Deck
Details
SITE NAVIGATION
Contact Builder
Searey LSX Home
Category
# Logs
# Hours
All
546
800
Aircraft
7
2
Airframe
58
113
Avionics
45
86
Background
20
1
Brakes
5
4
Cockpit
67
130
Education
17
2
Engine
38
28
Exterior Trim
24
25
Fly-In/Party
7
Fuselage
5
9
Gear Assembly
21
22
Hull
12
19
Interior Trim
27
38
Miscellaneous
22
2
Modifications
42
72
None
1
Prop
5
4
Turtle Deck
16
32
Wings
42
80
Wiring
53
131
Work Shop/Hanger
12
Copyright © 2001-2024 Matronics. All Rights Reserved.