Powered By Kitlog Pro v2.0
RVGator
RV8A
Final assembly
Work Logs Found:
60
Category Work Time:
319 Hours
Date
Hours
Work Log Summary
Details
12-11-2012
2.75
Installed new Fuel Press Sender
Details
12-10-2012
6.75
Stuff while waiting for Wx to clear
Details
12-09-2012
7.25
More first flight preperations
Details
12-08-2012
8.25
First flight training and final prep
Details
12-07-2012
4.75
Mag timing and first flight preperation
Details
12-06-2012
7.00
Spinner, Oil, Timing
Details
12-05-2012
1.50
Foil inside cowl
Details
12-04-2012
3.00
Cowl sealing
Details
12-03-2012
2.75
Installed inspection covers tail and wing
Details
12-02-2012
7.50
Airworthiness Inspection - PASSED
Details
12-01-2012
10.00
Pre-Inspection work
Details
11-30-2012
6.00
CB Panel decals
Details
11-29-2012
7.00
Cockpit labels
Details
11-28-2012
3.00
Seal inside of cowl
Details
11-26-2012
3.75
Test Fuel System
Details
11-25-2012
4.75
Oil Door / Prop bolts
Details
11-24-2012
4.75
Required Placards
Details
11-23-2012
3.25
Nothing accomplished
Details
11-21-2012
4.75
Finished Gear slot filler
Details
11-20-2012
3.50
Cowl slot filler piece U-816
Details
11-16-2012
5.00
Weight and Balance
Details
11-14-2012
3.00
Tested cowl fit with all seals
Details
11-11-2012
3.00
Engine stuff
Details
11-10-2012
5.25
Tail fairing final fit / gas tank flush
Details
11-09-2012
3.00
Lower cowl fasteners / Defuel rig
Details
11-08-2012
6.00
Seat belt / heat SCAT tubes
Details
11-07-2012
2.25
Installed oil breather tube
Details
11-06-2012
4.75
Installed rudder, riveted on rear baggage floor
Details
11-05-2012
4.75
Installed nut plate and tapped holes for tail fair
Details
11-04-2012
6.00
Fit Emp Fairing
Details
11-02-2012
5.50
Rivet baffle seal
Details
11-01-2012
3.00
Secured CHT/EGT wires
Details
09-11-2012
5.75
Tested instrument panel
Details
09-04-2012
6.25
Completed wing tips
Details
09-03-2012
6.00
Prepared right wing tip for nut plates
Details
09-02-2012
6.75
Left wing tip nut plates
Details
08-31-2012
7.25
Tip lens, wing wires
Details
08-30-2012
5.25
Wired right wing lights
Details
08-30-2012
3.50
Door Open Sensor
Details
08-29-2012
4.50
2. NAV/STROBE and Landing lights
Details
08-29-2012
3.00
1. Baggage door latch blocks
Details
08-28-2012
8.00
New Baggage door
Details
08-27-2012
8.25
Fit wing tip ribs
Details
08-26-2012
6.50
Initial fit of wing tips
Details
08-25-2012
0.75
2. Rudder cable fairings
Details
08-24-2012
4.50
Installed Pitot, wired roll servo started emp. fai
Details
08-23-2012
7.75
Installed VS and Flaps
Details
08-18-2012
9.25
Installed elevator tested trim
Details
08-17-2012
6.00
Primed tips hooked up tail light
Details
08-16-2012
6.25
Riveted rudder bottom
Details
08-15-2012
3.00
Elevator rigging and more glass work
Details
08-14-2012
6.25
Elevator fit and movement
Details
08-13-2012
6.75
Mounted elevator and fit wire to tail light
Details
08-11-2012
6.75
Made attachment for tail light
Details
08-10-2012
5.25
Riveted on elevator tips
Details
08-09-2012
6.50
Installed elevator trim servo and wire
Details
08-08-2012
6.75
VS, rudder pedals, & switch console
Details
08-07-2012
7.75
Fuel lines and console
Details
08-06-2012
7.75
Aileron push rods and front floor
Details
08-05-2012
3.25
Installed Horizontal Stab
Details
SITE NAVIGATION
Contact Builder
RV8A Home
Category
# Logs
# Hours
All
953
2965
Avionics
57
153
Builder tips
7
3
Canopy
49
102
Cowl
37
104
Dynon Autopilot
6
5
Education Classes
7
10
Education/Practice
7
10
Electrical
129
414
Empennage
90
291
Engine
102
339
Final assembly
60
319
First Flight
2
Fuselage
255
764
Interior
1
2
Kit Components
9
29
Miscellaneous
5
6
None
5
Painting
7
34
Painting/Polishing
7
34
Windscreen
24
64
Wings
83
268
Workshop
4
14
Copyright © 2001-2025 Matronics. All Rights Reserved.