Brent Connelly - N913BC
Work Logs Found: 44
Category Work Time: 85 Hours
 Date
Hours
Work Log Summary

Details

 06-07-2013
2.50
Wet sanded cowl and removed tape
Details
       

 04-29-2013
1.50
Sanded and final epoxed the canopy fairing.

 04-28-2013
1.50
Sanded and added another coat of epoxy
Details
     

 04-28-2013
0.45
Drilled 3/8" hole in both gas struts
Details

 04-08-2013
0.25
Another coat on part of canopy
Details
     

 04-07-2013
1.00
Prepared canopy for another coat of black epoxy
Details
       

 03-20-2013
1.50
Sanded canopy to prep for next epoxy coat

 02-24-2013
0.50
Drilled out and epoxyed right side fairing
Details
       

 12-21-2012
2.50
Finalized canopy install
Details
       

 12-20-2012
6.50
Completed Nose Wheel Fairing
Details
       

 12-13-2012
2.00
Wet and dry sanded fairing - removed tape
Details
       

 12-10-2012
1.50
Added epoxy coat to fairing

 12-09-2012
1.25
Filled canopy attach holes with epoxy/flox
Details
       

 12-08-2012
4.50
Trimmed Canopy Fairing
Details
       

 12-04-2012
1.00
Sanded and added another epoxy coat

 11-30-2012
1.50
Sanded and added another epoxy coat

 11-28-2012
1.50
Sanded then added epoxy layer to fairing
       

 11-24-2012
2.50
Sanded fairing and added epoxy/micro balloon mixtu
Details
       

 11-22-2012
0.25
Added more epoxy to aft edge of canopy
     

 11-21-2012
2.50
Sanded and added epoxy coat to fairing
       

 11-11-2012
1.00
Sanded canopy fairing

 11-03-2012
3.50
Layup of top fairing
Details
       

 10-29-2012
1.50
Light sanding of first stage of fairing layup
       

 10-25-2012
1.00
Cut glass for side fairings
Details
       

 10-24-2012
1.25
Final Fairing Surface Prep
Details
       

 10-23-2012
1.50
Sanded fairing foam and taped template outline
Details
       

 10-21-2012
1.25
Expoxy glued foam fillers to L/R canopy frame
       

 10-21-2012
1.75
Cut glass strips and other canopy fairing prep
       

 10-17-2012
1.25
Canopy foam prep and fitting
       

 10-14-2012
1.25
Began work on canopy skirt
Details

 09-15-2012
1.50
Riveted canopy skirt to canopy
Details
       

 09-15-2012
1.50
Installed D-Handle to canopy frame
Details
     

 09-15-2012
1.00
Added C-1214 Latch Block and trimmed it
Details
     

 09-14-2012
4.00
Attached canopy to frame
Details
       

 09-08-2012
0.75
Attached guide blocks to roll bar
Details
       

 09-06-2012
0.75
Fabricated two guide blocks for canopy frame
     

 09-05-2012
1.25
Fabricated L/R latch handles for canopy frame
       

 09-03-2012
5.00
Completed Canopy Fitting
Details
       

 09-02-2012
6.50
Fit canopy to frame
Details
       

 09-01-2012
0.50
Placed canopy onto the canopy frame/fuselage
Details
       

 09-01-2012
3.75
Installed canopy onto fuselage
Details
       

 08-31-2012
2.00
Began working on canopy frame
Details
       

 08-05-2012
2.50
Packed bearings and installed wheels
Details
       

 08-03-2012
2.00
Worked on nose and main wheels