|
|
|
|
Sid & Houston Mayeux Project
Work
Logs
Found:
43
|
Category Work Time: 92 Hours
|
Date
|
Hours
|
Work Log Summary
|
Details
|
03-09-2015
|
2.00
|
Firewall pass-through, oil drain magnet
|
Details
|
|
|
01-10-2015
|
1.00
|
Zip-tying firesleeve around the oil cooler return
|
Details
|
|
|
11-19-2014
|
1.50
|
Propeller final installation
|
Details
|
|
|
10-20-2014
|
2.00
|
Cowling/Spinner clearance check
|
Details
|
|
|
10-16-2014
|
0.50
|
Sam Toy, of Kaiser Airlines (prop bolts)
|
Details
|
|
|
10-16-2014
|
0.50
|
Prop Spinner Installation, part 3
|
Details
|
|
|
10-11-2014
|
1.50
|
Spinner prop hole backing plates, part 3
|
Details
|
|
|
10-11-2014
|
1.50
|
Prop Spinner Installation, part 2
|
Details
|
|
|
10-11-2014
|
1.50
|
Prop Spinner Installation, part 1
|
Details
|
|
|
10-10-2014
|
2.00
|
FAB Snorkel, final install
|
Details
|
|
|
10-09-2014
|
2.00
|
Spinner front plate
|
Details
|
|
|
10-08-2014
|
2.50
|
Spinner prop hole backing plates, part 2
|
Details
|
|
|
10-08-2014
|
1.50
|
Spinner prop hole backing plates, part 1
|
Details
|
|
|
10-05-2014
|
3.00
|
Redux: Left Intake Snorkel mount, part 3
|
Details
|
|
|
10-05-2014
|
2.00
|
Prop Install, part 2
|
Details
|
|
|
10-01-2014
|
2.00
|
Prop install, part 1
|
Details
|
|
|
09-21-2014
|
1.00
|
Cowling platenuts
|
Details
|
|
|
09-21-2014
|
2.00
|
Cowling oil door, part 6
|
Details
|
|
|
09-21-2014
|
2.00
|
Cowling oil door, part 5
|
Details
|
|
|
09-21-2014
|
3.00
|
Cowling heat protection
|
Details
|
|
|
09-19-2014
|
2.00
|
Cowling Paint
|
Details
|
|
|
09-18-2014
|
3.00
|
Cowling oil door, part 4
|
Details
|
|
|
09-17-2014
|
1.50
|
Cowling oil door, part 3
|
Details
|
|
|
09-17-2014
|
2.00
|
Cowling oil door, part 2
|
Details
|
|
|
09-15-2014
|
1.50
|
Cowling oil door, part 1
|
Details
|
|
|
08-16-2014
|
2.00
|
Top Cowl intake-to-cealing ramps
|
Details
|
|
|
08-16-2014
|
3.00
|
Lower Cowl Intakes' rubber cloth
|
Details
|
|
|
08-13-2014
|
3.00
|
Wired Fuel Flow Transducer, installed blast tubes
|
Details
|
|
|
08-13-2014
|
3.00
|
Footheat air scat tube installation
|
Details
|
|
|
08-12-2014
|
5.00
|
Baffle rubber cloth install
|
Details
|
|
|
08-07-2014
|
4.00
|
Baffle Walls, part 3
|
Details
|
|
|
07-29-2014
|
2.00
|
Misc. Baffle hardware install
|
Details
|
|
|
07-29-2014
|
3.00
|
Baffle Walls, part 2
|
Details
|
|
|
07-28-2014
|
3.00
|
Baffle Walls, part 1
|
Details
|
|
|
05-20-2014
|
2.00
|
Footheat muff installation, part 2
|
Details
|
|
|
05-20-2014
|
2.00
|
Footheat muff installation, part 1
|
Details
|
|
|
08-04-2012
|
2.00
|
Installing the heat vent valve part 2
|
Details
|
|
|
08-04-2012
|
2.00
|
Installing the battery box and battery
|
Details
|
|
|
07-31-2012
|
2.00
|
Installing the heat vent valve part 1
|
Details
|
|
|
07-31-2012
|
2.00
|
Installing the engine sensor manifold
|
Details
|
|
|
07-30-2012
|
2.00
|
More firewall platenuts...adel clamp mounts
|
Details
|
|
|
07-29-2012
|
2.00
|
Drilling/installing starter and master solenoids t
|
Details
|
|
|
07-28-2012
|
3.00
|
Building the battery box
|
Details
|
|
|
|
|
|
|
|
|
Copyright © 2001-2024 Matronics. All Rights Reserved. |