KitLog pro

Powered By Kitlog Pro v2.0

Sid & Houston Mayeux Project
Work Logs Found: 43
Category Work Time: 92 Hours
 Date
Hours
Work Log Summary

Details

 03-09-2015
2.00
Firewall pass-through, oil drain magnet
Details
       

 01-10-2015
1.00
Zip-tying firesleeve around the oil cooler return
Details
     

 11-19-2014
1.50
Propeller final installation
Details
       

 10-20-2014
2.00
Cowling/Spinner clearance check
Details
       

 10-16-2014
0.50
Sam Toy, of Kaiser Airlines (prop bolts)
Details
       

 10-16-2014
0.50
Prop Spinner Installation, part 3
Details
       

 10-11-2014
1.50
Spinner prop hole backing plates, part 3
Details
       

 10-11-2014
1.50
Prop Spinner Installation, part 2
Details
       

 10-11-2014
1.50
Prop Spinner Installation, part 1
Details
       

 10-10-2014
2.00
FAB Snorkel, final install
Details
       

 10-09-2014
2.00
Spinner front plate
Details
       

 10-08-2014
2.50
Spinner prop hole backing plates, part 2
Details
       

 10-08-2014
1.50
Spinner prop hole backing plates, part 1
Details
       

 10-05-2014
3.00
Redux: Left Intake Snorkel mount, part 3
Details
       

 10-05-2014
2.00
Prop Install, part 2
Details
       

 10-01-2014
2.00
Prop install, part 1
Details
       

 09-21-2014
1.00
Cowling platenuts
Details
       

 09-21-2014
2.00
Cowling oil door, part 6
Details
       

 09-21-2014
2.00
Cowling oil door, part 5
Details
       

 09-21-2014
3.00
Cowling heat protection
Details
       

 09-19-2014
2.00
Cowling Paint
Details
       

 09-18-2014
3.00
Cowling oil door, part 4
Details
       

 09-17-2014
1.50
Cowling oil door, part 3
Details
       

 09-17-2014
2.00
Cowling oil door, part 2
Details
       

 09-15-2014
1.50
Cowling oil door, part 1
Details
       

 08-16-2014
2.00
Top Cowl intake-to-cealing ramps
Details
       

 08-16-2014
3.00
Lower Cowl Intakes' rubber cloth
Details
       

 08-13-2014
3.00
Wired Fuel Flow Transducer, installed blast tubes
Details
       

 08-13-2014
3.00
Footheat air scat tube installation
Details
       

 08-12-2014
5.00
Baffle rubber cloth install
Details
       

 08-07-2014
4.00
Baffle Walls, part 3
Details
       

 07-29-2014
2.00
Misc. Baffle hardware install
Details
       

 07-29-2014
3.00
Baffle Walls, part 2
Details
       

 07-28-2014
3.00
Baffle Walls, part 1
Details
       

 05-20-2014
2.00
Footheat muff installation, part 2
Details
       

 05-20-2014
2.00
Footheat muff installation, part 1
Details
       

 08-04-2012
2.00
Installing the heat vent valve part 2
Details
       

 08-04-2012
2.00
Installing the battery box and battery
Details
       

 07-31-2012
2.00
Installing the heat vent valve part 1
Details
       

 07-31-2012
2.00
Installing the engine sensor manifold
Details
       

 07-30-2012
2.00
More firewall platenuts...adel clamp mounts
Details
       

 07-29-2012
2.00
Drilling/installing starter and master solenoids t
Details
       

 07-28-2012
3.00
Building the battery box
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.