KitLog pro

Powered By Kitlog Pro v2.0

TAB Aircraft LLC Web Site
Work Logs Found: 42
Category Work Time: 72 Hours
 Date
Hours
Work Log Summary

Details

 09-20-2015
0.00
Page 517 Repaired Weight Mount Shelf
Details
       

 08-08-2015
0.00
Page 516 Made a Weight Mount Shelf
Details
       

 05-12-2014
0.50
Page 493 Grinding the Tail Wheel Fork
Details
       

 05-11-2014
1.00
Page 492 Fixing What Kerry Told me to Fix
Details
       

 09-06-2013
1.00
Page 341 Installed an extra Hull Side Angle
Details
       

 05-11-2013
1.00
Page 241 Strengthening Battery Tray attachment
Details
       

 05-10-2013
1.00
Page 240 Making room for a 2nd Battery
Details
       

 01-21-2013
1.00
Page 161 Getting Ready for a Viking
Details
       

 01-20-2013
2.00
Page 160 Getting Ready to Paint 2
Details
       

 01-12-2013
2.00
Page 155 Bulkhead Tube Hull Reinforcement 2
Details
       

 01-11-2013
6.00
Page 154 Bulkhead Tube Hull Reinforcement 1
Details
       

 10-02-2012
1.00
Page 86 Hull Rivet Reinforcement Continued
Details
       

 09-30-2012
0.00
Page 85 The Mega Hatch
Details
       

 09-27-2012
2.00
Page 82 Turtle Deck Bulkhead Part 4
Details
       

 09-26-2012
1.00
Page 81 Turtle Deck Bulkhead Part 3
Details
       

 09-25-2012
2.00
Page 80 Turtle Deck Bulkhead Part 2
Details
       

 09-24-2012
2.00
Page 79 Turtle Deck Bulkhead Part 1
Details
       

 09-16-2012
2.00
Page 75 Installing the Stow-n-Go Hatch Part 4
Details
       

 09-15-2012
2.00
Page 74 Hull Rivet Reinforcement
Details
       

 09-13-2012
4.00
Page 72 Installing the Stow-n-Go Hatch Part 3
Details
       

 09-12-2012
4.00
Page 71 Installing the Stow-n-Go Hatch Part 2
Details
       

 09-11-2012
4.00
Page 70 Installing the Stow-n-Go Hatch Part 1
Details
       

 08-30-2012
0.50
Page 58 Installing Bushings Part 3
Details
       

 08-28-2012
1.00
Page 56 Installing Bushings Part 2
Details
       

 08-22-2012
1.00
Page 54 Installing Bushings Part 1
Details
       

 08-20-2012
1.00
Page 52 Tail Wheel Retract Cable Protection
Details
       

 08-14-2012
2.00
Page 46 Adding Heater Piping
Details
       

 08-08-2012
2.00
Page 40 Painting the Fuel Tank
Details
       

 08-04-2012
2.00
Page 36 Fiberglass Patching
Details
       

 08-02-2012
1.00
Page 34 Checking the Fit Again
Details
       

 08-01-2012
2.00
Page 33 Cutting the Reinforcements
Details
       

 07-31-2012
1.00
Page 32 Checking the Airframe Fit
Details
       

 07-30-2012
2.00
Page 31 Cutting Down the Stringer
Details
       

 07-29-2012
3.00
Page 30 Airframe to Hull Stringer Reinforcment
Details
       

 07-28-2012
3.00
Page 29 Applying the Fiberglass
Details
       

 07-27-2012
2.00
Page 28 Gluing the foam to the Hull
Details
       

 07-26-2012
1.00
Page 27 Adding Foam Reiforcment
Details
       

 07-25-2012
2.00
Page 26 Reinforcing the Hull Step
Details
       

 07-24-2012
1.00
Page 25 Actuator Plate Replacment
Details
       

 07-23-2012
3.00
Page 24 Beefing Up the Rear Actuator Plate
Details
       

 07-19-2012
1.00
Page 20 Installing KeelGaurd
Details
       

 07-15-2012
1.50
Page 17 Installation of the Fuel Tank Strap
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.