KitLog pro

Powered By Kitlog Pro v2.0

TAB Aircraft LLC Web Site
Work Logs Found: 12
Category Work Time: 19 Hours
 Date
Hours
Work Log Summary

Details

 01-16-2013
2.00
Page 156 Making the Mega Hatch Pretty
Details
       

 01-05-2013
1.00
Page 148 Installed the Bow Eye
Details
       

 09-14-2012
1.00
Page 73 Repair a mistake
Details
       

 09-07-2012
0.50
Page 66 Installation of the Battery Hold-Down
Details
       

 08-12-2012
2.00
Page 44 Attaching the Rubber Seals
Details
       

 08-11-2012
1.00
Page 43 Installation of the Bilge Pump
Details
       

 08-10-2012
3.00
Page 42 Installation of Carpeting into Hull
Details
       

 08-09-2012
0.50
Page 41 Repairing the Gap in the Hull
Details
       

 08-07-2012
1.00
Page 39 Patching the gap
Details
       

 08-06-2012
2.00
Page 38 Cut the Gear Leg Opening
Details
       

 08-05-2012
2.00
Page 37 Drilling the Hull Stringers
Details
       

 07-22-2012
3.00
Page 23 Cutting the Hull for the Airframe
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.