KitLog pro

Powered By Kitlog Pro v2.0

Bruces Web Site
Work Logs Found: 51
Category Work Time: 212 Hours
 Date
Hours
Work Log Summary

Details

 02-16-2017
5.00
Ekofil
Details
       

 02-15-2017
5.00
No more tapes
Details
       

 02-14-2017
6.00
Tapes and more tapes
Details
       

 02-13-2017
9.00
Tapes and Patches
Details
       

 02-11-2017
6.00
Tapes and Patches
Details
       

 02-10-2017
5.00

Details

 02-09-2017
6.00
Cover Fues, shrink
Details
       

 02-08-2017
8.00
Cover sides
Details
       

 02-06-2017
5.00
Left side fabric
Details
       

 02-05-2017
4.00
Cover bottom
Details

 02-04-2017
3.50
Start covering Fues
Details
       

 01-28-2017
2.00
Prep for covering
Details

 12-26-2016
3.00
Closeouts, misc stuff
Details
       

 12-24-2016
4.00
Fuel valve and side panel
Details
       

 12-23-2016
4.00
Complete boot cowl, floorpan side panels
Details
       

 12-22-2016
4.00
Boot cowl, complete prelim assembly
Details
       

 12-21-2016
3.50
Boot cowl, instrument panel visor
Details
       

 12-20-2016
3.00
Spacer strips boot cowl
Details
       

 12-19-2016
3.50
Top side skins boot cowl and top
Details
       

 12-18-2016
3.50
Boot cowl, left side
Details
     

 12-17-2016
5.00
Boot cowl, sides and stringers
Details
       

 12-16-2016
4.50
Firewall and boot cowl
Details
       

 12-15-2016
4.00
Nose gear and Firewall
Details
       

 12-14-2016
4.50
Put on gear
Details
       

 12-11-2016
4.00
Landing Gear
Details
       

 12-10-2016
2.00
Wheels
Details
       

 11-21-2016
3.00
Interior
Details

 11-20-2016
4.00
Interior
Details
       

 11-19-2016
5.00
Interior, Rudder cables
Details
       

 11-18-2016
4.00
Interior Parts
Details
       

 11-16-2016
5.00
Interior
Details
       

 11-13-2016
4.00
Interoir around sticks
Details
       

 11-12-2016
1.00
Interior, build new part
Details

 11-11-2016
2.00
Interior
Details

 11-10-2016
5.00
Flap and header tank
Details
       

 11-09-2016
5.00
Complete elevator pushrods
Details
       

 11-08-2016
4.00
Sticks
Details
       

 11-07-2016
3.50
Brakes and stick
Details
       

 11-06-2016
3.00
Rudder pedals
Details
       

 11-05-2016
2.00
Front floorboard
Details
     

 11-04-2016
2.50
Header Tank
Details
     

 11-03-2016
4.00
Complete seats
Details

 11-02-2016
5.00
Headrest, seat rails
Details
       

 11-01-2016
4.50
Seats
Details
       

 10-31-2016
5.00
Baggage compartment
Details

 10-30-2016
4.50
Forward and Aft Baggage
Details
       

 10-29-2016
3.50
Baggage area
Details
     

 10-28-2016
1.50
Baggabe box
Details

 10-27-2016
3.50
Baggage compartment
Details
       

 10-26-2016
5.00
Frames, rudder, etc.
Details
       

 10-24-2016
5.00
Formers
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.