Powered By Kitlog Pro v2.0
Bruces S-19 Build Log
S-19 Venterra
Instruments
Work Logs Found:
42
Category Work Time:
201 Hours
Date
Hours
Work Log Summary
Details
07-03-2017
1.00
Installed glare shield
Details
06-27-2017
1.00
Top Panel ready for close-out
Details
06-16-2017
1.00
Moving Compass & top panel work
Details
02-13-2017
1.00
Compass Reads Wrong
Details
02-06-2017
1.00
Installed Transponder
Details
09-21-2016
1.00
Remade ipad power supply
Details
09-20-2016
1.00
Installed a vertical card compass
Details
09-15-2016
1.00
Finished ipad mount
Details
09-08-2016
1.00
Continued with ipad mount
Details
08-23-2016
1.00
continuing with the ipad mount
Details
07-20-2016
1.00
Started a ipad mount
Details
03-01-2015
6.00
Reinforced the D-1000 EFIS Skyview Cut-out
Details
12-01-2014
10.00
Powered up and tested radio
Details
11-28-2014
10.00
Wiring the radios
Details
11-25-2014
10.00
Finished wire harness fab
Details
11-18-2014
8.00
Started Wiring the radio
Details
09-01-2014
2.00
Enlarged access to ELT transmitter
Details
08-29-2014
2.00
Routed Coax to ELT antenna
Details
08-27-2014
2.00
Installed ELT Antenna
Details
08-17-2014
2.00
Finished USB Power supply
Details
08-13-2014
4.00
Designed and fabed a music in and Auxillary power
Details
07-31-2014
2.00
First Light-up
Details
07-26-2014
4.00
More panel wiring
Details
07-16-2014
4.00
Finished EMS and ADSB brackets
Details
06-04-2014
10.00
Built rack for avionics
Details
05-02-2014
1.00
Mocked up IPad installation
Details
05-01-2014
2.00
Installed panel
Details
04-30-2014
6.00
Painted Panel
Details
04-25-2014
8.00
Bulit a Enunciator panel
Details
04-23-2014
8.00
Finished Cutting Panel
Details
04-19-2014
8.00
Cut the panel holes
Details
12-27-2013
5.00
Finished the center panel
Details
12-26-2013
1.00
Ouch that hurt!
Details
12-20-2013
20.00
Designed and scratch built a center panel
Details
11-04-2013
20.00
Prototype work on instrument panel concept.
Details
06-27-2013
6.00
Built an ADS-B antenna bracket
Details
04-19-2013
3.00
Built pitot/AOA probe
Details
04-16-2013
8.00
Single ADAHRS configuration
Details
04-16-2013
8.00
Prewire and plumb for 2nd ADAHRS unit
Details
04-12-2013
4.00
Pitot tube construction
Details
11-25-2012
4.00
LED instrument lights
Details
07-15-2012
2.00
Dynon Avionics are received
Details
SITE NAVIGATION
Contact Builder
S-19 Venterra Home
Category
# Logs
# Hours
All
460
1984
Aft Fuselage
20
138
Aileron
13
71
Assembly
9
9
Builder
1
Canopy
12
37
Center Fuselage
31
165
Controls
9
15
Cowling
16
16
Demo Flight
2
Distractions
2
Electrical
28
156
Empennage
3
2
Engine
7
8
Fiberglass Tip for V
9
68
Flaps
6
44
Flight Test
5
5
Forward Fuselage
27
139
Fuselage
6
11
FWF
33
57
Horiz Stabilator
29
131
Instruments
42
201
Interiour
6
35
Landing Gear
9
31
Paint
10
10
Project
1
Rudder
11
47
Seats
5
65
Shop
4
Tips
7
0
Tools
3
Trim Tab
1
8
Vertical Stablizer
13
75
Wings
80
440
Copyright © 2001-2024 Matronics. All Rights Reserved.