Powered By Kitlog Pro v2.0
John (Jack) Clark's Web Site
RV-A8
Fiberglass
Work Logs Found:
148
Category Work Time:
316 Hours
Date
Hours
Work Log Summary
Details
07-15-2014
1.00
Working on Main Wheel Fairings Leg Transitions
Details
07-09-2014
3.00
Wet sanded the Cowl Flap and Nose Gear Fairings
Details
07-08-2014
4.00
Sanded Cowl Flap and Nose Gear Fairings
Details
06-08-2014
2.00
Trimmed to Fit and Installed Main Wheel Fairings
Details
06-02-2014
2.00
Installed the Nose Gear/Main Leg Fairings
Details
05-29-2014
1.00
Reinforced the Engine Cowl Flap
Details
03-01-2014
1.00
Glued a Stiffener in the Right Wing Tip
Details
08-31-2013
1.50
Finished Installation of the Empennage Fairings
Details
08-30-2013
2.00
Installing Empennage Fairings
Details
08-30-2013
0.00
Installed Empennage Fairings
Details
08-12-2013
1.00
Finish Sanded the Empennage Fairing
Details
08-11-2013
2.00
Sprayed on UV Smooth Prime to Empennage Fairings
Details
08-10-2013
2.50
Sanded the Empennage Fqirings
Details
08-09-2013
1.00
Applied Awl Fair to the Empennage Fairings
Details
06-22-2013
3.00
Fit the Nose Gear Fairings
Details
06-21-2013
1.00
Sized the Nose Gear Leg Fairing
Details
04-28-2013
2.00
Primer Painted Windscreen Fairing and Skirt
Details
04-24-2013
1.50
Sanded the Windscreen Transitions
Details
04-21-2013
2.00
Sanding and Re-Application Of UV Smooth Prime
Details
04-20-2013
2.00
Sanded and Re-Applied UV Smooth Prime
Details
04-19-2013
2.00
Sanded UV Smooth Prime then Re-Sprayed
Details
04-18-2013
1.00
Sprayed 3 Coats of UV Smooth Prime
Details
04-17-2013
3.00
Final Wet Sanding of the Epoxy Coated Skirts
Details
04-15-2013
2.50
Wet Sanded the Skirts to 400 Grit
Details
04-08-2013
1.50
Applied 3 Coats of Straight Epoxy
Details
04-07-2013
1.00
Sanded the Transition Around the Handle
Details
04-06-2013
3.00
Glued Canopy Shut!
Details
04-05-2013
2.00
Sanded the Handle Fiberglass Tube to Length
Details
04-03-2013
3.00
Sanded the Right and Left Windscreen Transitions
Details
04-02-2013
2.50
Sanded Right and Left Transition Areas
Details
04-01-2013
3.00
Sanded Right Transition, Re-applied Flox Mixture
Details
03-30-2013
6.00
Sanded the Right Side Canopy Skirt Transition
Details
03-29-2013
4.00
Applied Fiberglass and Carbon Fiber to Windscreen
Details
03-28-2013
2.50
Pulled the Tape and Plastic Off Windscreen
Details
03-27-2013
2.50
?Final Sanded Windscreen Fairing
Details
03-26-2013
1.50
Sanded Windscreen Fairing and Spot Epoxied
Details
03-25-2013
1.00
Light Sanding of Windscreen Fairing with 150 Grit
Details
03-24-2013
2.00
Sanded and Filled Fairing Epoxy Coating
Details
03-23-2013
3.00
Sanded the Epoxy Top Coat, Filled and Re-sanded
Details
03-21-2013
3.00
Detail Sanded Fairing, Applied Black Epoxy Coat
Details
03-20-2013
3.00
Sanded to Bottom Yellow Tape Layer
Details
03-19-2013
3.00
Spot Sanded, Spot Filled and Re-Sanded
Details
03-18-2013
4.00
Sanded Down to the Orange Tape
Details
03-17-2013
2.00
Sanded Down to White Tape Again
Details
03-16-2013
5.00
Sanded down to the Orange Tape
Details
03-15-2013
0.00
2nd Sanding of Fairing to Shape 2
Details
03-15-2013
3.00
2nd Sanding of Fairing to Shape
Details
03-14-2013
6.00
Sanded Entire Windscreen Fairing
Details
03-13-2013
1.00
Applied Blackened Epoxy/Microballoon/Flox
Details
03-12-2013
2.50
Sanded the Bow of the Windscreen Fairing
Details
03-11-2013
1.50
Sanded the Right Bottom of Windscreen Fairing
Details
03-10-2013
1.50
Sanded the Left Side of Bottom Fairing Layup
Details
03-09-2013
0.50
Separated the Canopy from the Bow Fiberglass
Details
03-08-2013
3.00
Glassed the Bow of the Windscreen
Details
03-07-2013
3.00
Glassed the Bottom of the Windscreen Fairing
Details
03-06-2013
1.00
Sanded the Fillet and the Filler
Details
03-05-2013
3.50
Sanded Top Skin and Windscreen With 60 Grit
Details
03-04-2013
3.00
Taped the Windscreen, Top Skin & Canopy
Details
12-10-2012
1.00
Sanded Yesterday's Transition Micro
Details
12-09-2012
1.50
Sanded the Reinforcement Glass on the Lt Lip
Details
12-08-2012
1.50
Pulled the Peel Ply from Yesterdays Lip Glassing
Details
12-07-2012
2.00
Sanded the Skirt Interior with 400 Grit
Details
12-06-2012
1.00
Interior Skirt Pinhole Sealing with Epoxy/Acetone
Details
12-05-2012
2.00
Lightly Finish Sanded the Skirt Exterior Sides
Details
12-04-2012
4.00
Sanded the Exterior of the Left Skirt
Details
12-03-2012
4.00
Sanded the Right Skirt Exterior
Details
12-02-2012
3.50
Sanded the Left Skirt Exterior
Details
12-01-2012
2.00
Applied Micro and Cabosil to the Skirt Exterior Si
Details
11-30-2012
1.00
Started Sanding the Liquid Shim
Details
11-29-2012
1.00
Reapplied Liquid Shim to Canopy Frame/Skirt
Details
11-28-2012
2.00
Sanded Aft Skirt Tip to Shape
Details
11-26-2012
3.00
Sanded Aft Skirt Microballoon Application
Details
11-25-2012
3.00
Sanded Aft Skirt Then Applied Microballoons Again
Details
11-23-2012
3.00
Sanded the Top Of the Aft Skirt to a Better Taper
Details
11-22-2012
1.00
Sanded Aft Canopy Skirt Interior
Details
11-21-2012
2.00
Sanded Aft Inside of Skirt
Details
11-20-2012
3.00
Trimmed the Skirt Aft Top Edge
Details
11-20-2012
0.00
Trimmed the Skirt Aft Top Edge
Details
11-19-2012
3.00
Sanded the Skirt Side's Lip Transitions
Details
11-18-2012
3.00
Established a Contour Line for the Upper Aft Skirt
Details
11-17-2012
3.00
Sanded the Left Transitional Area
Details
11-16-2012
3.00
Sanded the Right Transitional Area of the Skirt
Details
11-15-2012
3.00
Sanded the Aft Transitional Areas of the Skirt
Details
11-14-2012
3.00
Sanded the Upper Lips of the Skirt
Details
11-13-2012
4.50
Sanded Aft Skirt Using Spray Can Paint as Witness
Details
11-12-2012
1.00
Applied Microballoon Slurry to Aft Skirt
Details
11-11-2012
3.50
Sanded the Aft Skirt and Applies 2 ply Glass
Details
11-10-2012
3.50
Sanded Aft Skirt and Applied Micro/Cotton Epoxy
Details
11-09-2012
2.00
Sanded the Aft Canopy Skirt
Details
11-09-2012
4.00
Fit and Gap Sealed Top & Bottom Empennage Fairings
Details
11-09-2012
0.00
Empennage Fairings Fitted
Details
11-08-2012
2.50
Fitted and Glassed the Empennage Fairings Union
Details
11-07-2012
4.00
Trimmed the Aft Top Edge of the Skirt
Details
11-06-2012
3.50
Cut and Shaped Aft Skirt to Clear Empennage Fairin
Details
11-05-2012
3.50
Sanded Aft Skirt and Re-Applied Loose Slurry
Details
11-04-2012
2.00
Sanded Inside of Skirt and Re-Applied Epoxy Slurry
Details
11-03-2012
1.50
Sanded and Shaped Interior of Aft Skirt
Details
11-01-2012
2.00
Added Gap Seal to Bottom of Aft Skirt
Details
10-31-2012
1.50
Sanded Sides and Aft End of Canopy Skirt
Details
10-30-2012
0.00
Results of Aft Canopy Skirt Gap Filling
Details
10-29-2012
1.00
Added Microballoon, Flox and CaboSil to Aft Skirts
Details
10-28-2012
2.00
Applied Filler to Skirt Tops and Clecoed to Canopy
Details
10-26-2012
3.00
Sanded the Recently Glassed Fracture Line Glass
Details
10-21-2012
2.00
Sanded the Skirts Interior Fracture Line Micro Fil
Details
10-07-2012
1.50
Glassed the Inside Aft Joint of the Canopy Skirts
Details
10-05-2012
1.00
Removed the Canopy Skirts to Glass the Inside Lip
Details
10-04-2012
1.00
Re-glassed the Canopy Skirts Aft Joint
Details
10-03-2012
3.00
Formed Clay Mold and Applied Aft Skirt Fiberglass
Details
10-02-2012
1.00
Cut Posterboard Contours of Each Skirt Aft End
Details
09-26-2012
1.00
Applied a Layer of 9 Oz. Glass and Peel Ply
Details
09-25-2012
0.50
Filled Small Void in Skirt Joint with Super Fil
Details
09-24-2012
0.25
Checked the Skirt vs. Empennage Clearance
Details
09-23-2012
2.00
Sanded Aft End of Skirts and the Left Side Repair
Details
09-22-2012
2.00
Sanded the Left Canopy Skirt
Details
09-21-2012
1.50
Sanded the Right Canopy Skirt Liquid Shim
Details
09-21-2012
0.50
Applied Liquid Shim to the Left Canopy Skirt
Details
09-20-2012
1.00
Liquid Shim Applied to the Right Canopy Skirt
Details
09-19-2012
1.00
Micro Balloon & Flox Gap Seal To Right Skirt Lip
Details
09-18-2012
1.50
Heat Formed the Upper Lip of Both Canopy Skirts
Details
09-17-2012
0.00
Sanded Filler and Adjusted the Skirt Top Lip 2
Details
09-17-2012
4.00
Sanded Filler and Adjusted the Skirt Top Lip
Details
09-15-2012
0.00
Filled the Fracture lines of the Canopy Skirts 2
09-15-2012
6.00
Filled the Fracture lines of the Canopy Skirts
Details
09-14-2012
0.00
Fitting the Canopy Skirt 3
Details
09-14-2012
4.00
Fitting the Canopy Skirt 2
Details
09-13-2012
2.00
Match Drilled the Skirts to the Canopy Frame
Details
09-13-2012
1.00
Fit the Skirts
Details
09-13-2012
2.00
Drilled the Canopy Frame with a #40 Bit
Details
09-05-2012
0.75
Fabricated Fiberglass HS Bottom Gap Seal
Details
08-13-2012
0.50
Glassed the Right Side of the Empennage Fairing
Details
08-12-2012
2.50
Modified the VS/HS Empennage Fairing
Details
08-11-2012
2.00
Installed Nutplates for the HS/VS Fairing
Details
08-10-2012
1.00
Trim Fitted the Large Empennage Fairing
Details
08-10-2012
0.50
Sprayed Empennage Fairing Pieces
Details
08-09-2012
2.00
Sanded the Empennage Fairings
Details
08-08-2012
1.00
Sprayed the Empennage Fairings with White Primer
Details
08-07-2012
3.00
Sanded UV Smooth Prime from Empennage Fairings
Details
08-06-2012
1.00
Applied 3 Thin Rolled Layers of UV Smooth Prime
Details
08-04-2012
3.00
Sprayed Primer of the Empennage Fairings
Details
08-03-2012
2.00
Sanded Awl Fair Smooth on Empennage Fairings
Details
08-02-2012
3.00
Sanded Empennage Fairings with Foam Blocks
Details
08-01-2012
2.00
Sanded the Awl Fair with 120 Grit Paper
Details
07-31-2012
3.50
Sanded Empennage Fairings with 120 Grit Paper
Details
07-30-2012
6.00
Applied Microballoon Slurry to Empennage Fairings
Details
07-21-2012
1.50
Sanded Rudder Bottom Fairing with 120 Grit
Details
07-19-2012
2.00
Sanded Rudder Bottom Fairing
Details
07-18-2012
1.50
Applied Microballoon Slurry to Rudder Bottom Fairi
Details
07-16-2012
1.50
Finished Assembly of a Downdraft Box
Details
SITE NAVIGATION
Contact Builder
RV-14A Home
RV-A8 Home
Category
# Logs
# Hours
All
2277
6152
Aircraft Related
314
1432
Avionics
206
404
Brakes
11
18
Canopy
41
63
Cooling System
7
9
Cowl Flap
13
20
Cowling
146
354
Electrical System
157
311
Empennage
29
48
Engine
88
158
Fiberglass
148
316
Finishing Kit
27
76
First Flight Prep
4
1
Flight Control Syste
75
118
Flight Testing
18
20
Flights
6
7
Forward Baggage Comp
6
9
Forward Top Skin
24
36
Fuel System
84
155
Fuselage
344
812
Heating System
1
0
Inspection
5
5
Interior
24
20
Landing Gear
53
100
Lighting
17
27
Miscellaneous
8
5
None
14
6
Oxygen System
5
6
Painiting
11
28
Painting
11
28
Prop
22
27
Sensors
5
7
Testing
1
1
Ventilation
3
4
Windscreen
8
13
Wing Construction
27
76
Wings
314
1432
Copyright © 2001-2024 Matronics. All Rights Reserved.