KitLog pro

Powered By Kitlog Pro v2.0

John (Jack) Clark's Web Site
Work Logs Found: 148
Category Work Time: 316 Hours
 Date
Hours
Work Log Summary

Details

 07-15-2014
1.00
Working on Main Wheel Fairings Leg Transitions
Details
       

 07-09-2014
3.00
Wet sanded the Cowl Flap and Nose Gear Fairings
Details
     

 07-08-2014
4.00
Sanded Cowl Flap and Nose Gear Fairings
Details
     

 06-08-2014
2.00
Trimmed to Fit and Installed Main Wheel Fairings
Details
       

 06-02-2014
2.00
Installed the Nose Gear/Main Leg Fairings
Details
       

 05-29-2014
1.00
Reinforced the Engine Cowl Flap
Details

 03-01-2014
1.00
Glued a Stiffener in the Right Wing Tip
Details
     

 08-31-2013
1.50
Finished Installation of the Empennage Fairings
Details
       

 08-30-2013
2.00
Installing Empennage Fairings
Details
       

 08-30-2013
0.00
Installed Empennage Fairings
Details
       

 08-12-2013
1.00
Finish Sanded the Empennage Fairing
Details

 08-11-2013
2.00
Sprayed on UV Smooth Prime to Empennage Fairings
Details

 08-10-2013
2.50
Sanded the Empennage Fqirings
Details

 08-09-2013
1.00
Applied Awl Fair to the Empennage Fairings
Details
       

 06-22-2013
3.00
Fit the Nose Gear Fairings
Details
       

 06-21-2013
1.00
Sized the Nose Gear Leg Fairing
Details

 04-28-2013
2.00
Primer Painted Windscreen Fairing and Skirt
Details
       

 04-24-2013
1.50
Sanded the Windscreen Transitions
Details
       

 04-21-2013
2.00
Sanding and Re-Application Of UV Smooth Prime
Details

 04-20-2013
2.00
Sanded and Re-Applied UV Smooth Prime
Details

 04-19-2013
2.00
Sanded UV Smooth Prime then Re-Sprayed
Details

 04-18-2013
1.00
Sprayed 3 Coats of UV Smooth Prime
Details
       

 04-17-2013
3.00
Final Wet Sanding of the Epoxy Coated Skirts
Details
       

 04-15-2013
2.50
Wet Sanded the Skirts to 400 Grit
Details
       

 04-08-2013
1.50
Applied 3 Coats of Straight Epoxy
Details
       

 04-07-2013
1.00
Sanded the Transition Around the Handle
Details

 04-06-2013
3.00
Glued Canopy Shut!
Details
       

 04-05-2013
2.00
Sanded the Handle Fiberglass Tube to Length
Details
     

 04-03-2013
3.00
Sanded the Right and Left Windscreen Transitions
Details
       

 04-02-2013
2.50
Sanded Right and Left Transition Areas
Details

 04-01-2013
3.00
Sanded Right Transition, Re-applied Flox Mixture
Details
       

 03-30-2013
6.00
Sanded the Right Side Canopy Skirt Transition
Details
       

 03-29-2013
4.00
Applied Fiberglass and Carbon Fiber to Windscreen
Details
       

 03-28-2013
2.50
Pulled the Tape and Plastic Off Windscreen
Details
       

 03-27-2013
2.50
?Final Sanded Windscreen Fairing
Details

 03-26-2013
1.50
Sanded Windscreen Fairing and Spot Epoxied
Details

 03-25-2013
1.00
Light Sanding of Windscreen Fairing with 150 Grit
Details

 03-24-2013
2.00
Sanded and Filled Fairing Epoxy Coating
Details

 03-23-2013
3.00
Sanded the Epoxy Top Coat, Filled and Re-sanded
Details
       

 03-21-2013
3.00
Detail Sanded Fairing, Applied Black Epoxy Coat
Details
       

 03-20-2013
3.00
Sanded to Bottom Yellow Tape Layer
Details

 03-19-2013
3.00
Spot Sanded, Spot Filled and Re-Sanded
Details

 03-18-2013
4.00
Sanded Down to the Orange Tape
Details
       

 03-17-2013
2.00
Sanded Down to White Tape Again
Details

 03-16-2013
5.00
Sanded down to the Orange Tape
Details
       

 03-15-2013
0.00
2nd Sanding of Fairing to Shape 2
Details
       

 03-15-2013
3.00
2nd Sanding of Fairing to Shape
Details
       

 03-14-2013
6.00
Sanded Entire Windscreen Fairing
Details
       

 03-13-2013
1.00
Applied Blackened Epoxy/Microballoon/Flox
Details
       

 03-12-2013
2.50
Sanded the Bow of the Windscreen Fairing
Details
       

 03-11-2013
1.50
Sanded the Right Bottom of Windscreen Fairing
Details
       

 03-10-2013
1.50
Sanded the Left Side of Bottom Fairing Layup
Details
       

 03-09-2013
0.50
Separated the Canopy from the Bow Fiberglass
Details
       

 03-08-2013
3.00
Glassed the Bow of the Windscreen
Details
       

 03-07-2013
3.00
Glassed the Bottom of the Windscreen Fairing
Details
       

 03-06-2013
1.00
Sanded the Fillet and the Filler
Details
       

 03-05-2013
3.50
Sanded Top Skin and Windscreen With 60 Grit
Details
       

 03-04-2013
3.00
Taped the Windscreen, Top Skin & Canopy
Details
       

 12-10-2012
1.00
Sanded Yesterday's Transition Micro
Details

 12-09-2012
1.50
Sanded the Reinforcement Glass on the Lt Lip
Details

 12-08-2012
1.50
Pulled the Peel Ply from Yesterdays Lip Glassing
Details

 12-07-2012
2.00
Sanded the Skirt Interior with 400 Grit
Details

 12-06-2012
1.00
Interior Skirt Pinhole Sealing with Epoxy/Acetone
Details
       

 12-05-2012
2.00
Lightly Finish Sanded the Skirt Exterior Sides
Details
     

 12-04-2012
4.00
Sanded the Exterior of the Left Skirt
Details

 12-03-2012
4.00
Sanded the Right Skirt Exterior
Details
     

 12-02-2012
3.50
Sanded the Left Skirt Exterior
Details
     

 12-01-2012
2.00
Applied Micro and Cabosil to the Skirt Exterior Si
Details
       

 11-30-2012
1.00
Started Sanding the Liquid Shim
Details
       

 11-29-2012
1.00
Reapplied Liquid Shim to Canopy Frame/Skirt
Details

 11-28-2012
2.00
Sanded Aft Skirt Tip to Shape
Details
       

 11-26-2012
3.00
Sanded Aft Skirt Microballoon Application
Details
       

 11-25-2012
3.00
Sanded Aft Skirt Then Applied Microballoons Again
Details
       

 11-23-2012
3.00
Sanded the Top Of the Aft Skirt to a Better Taper
Details
       

 11-22-2012
1.00
Sanded Aft Canopy Skirt Interior
Details

 11-21-2012
2.00
Sanded Aft Inside of Skirt
Details
       

 11-20-2012
3.00
Trimmed the Skirt Aft Top Edge
Details
       

 11-20-2012
0.00
Trimmed the Skirt Aft Top Edge
Details
       

 11-19-2012
3.00
Sanded the Skirt Side's Lip Transitions
Details
       

 11-18-2012
3.00
Established a Contour Line for the Upper Aft Skirt
Details
       

 11-17-2012
3.00
Sanded the Left Transitional Area
Details
       

 11-16-2012
3.00
Sanded the Right Transitional Area of the Skirt
Details
       

 11-15-2012
3.00
Sanded the Aft Transitional Areas of the Skirt
Details
       

 11-14-2012
3.00
Sanded the Upper Lips of the Skirt
Details

 11-13-2012
4.50
Sanded Aft Skirt Using Spray Can Paint as Witness
Details
     

 11-12-2012
1.00
Applied Microballoon Slurry to Aft Skirt
Details
     

 11-11-2012
3.50
Sanded the Aft Skirt and Applies 2 ply Glass
Details
     

 11-10-2012
3.50
Sanded Aft Skirt and Applied Micro/Cotton Epoxy
Details
     

 11-09-2012
2.00
Sanded the Aft Canopy Skirt
Details
     

 11-09-2012
4.00
Fit and Gap Sealed Top & Bottom Empennage Fairings
Details
       

 11-09-2012
0.00
Empennage Fairings Fitted
Details
       

 11-08-2012
2.50
Fitted and Glassed the Empennage Fairings Union
Details
       

 11-07-2012
4.00
Trimmed the Aft Top Edge of the Skirt
Details
       

 11-06-2012
3.50
Cut and Shaped Aft Skirt to Clear Empennage Fairin
Details
       

 11-05-2012
3.50
Sanded Aft Skirt and Re-Applied Loose Slurry
Details
       

 11-04-2012
2.00
Sanded Inside of Skirt and Re-Applied Epoxy Slurry
Details
       

 11-03-2012
1.50
Sanded and Shaped Interior of Aft Skirt
Details
       

 11-01-2012
2.00
Added Gap Seal to Bottom of Aft Skirt
Details
     

 10-31-2012
1.50
Sanded Sides and Aft End of Canopy Skirt
Details
     

 10-30-2012
0.00
Results of Aft Canopy Skirt Gap Filling
Details
       

 10-29-2012
1.00
Added Microballoon, Flox and CaboSil to Aft Skirts
Details
     

 10-28-2012
2.00
Applied Filler to Skirt Tops and Clecoed to Canopy
Details
       

 10-26-2012
3.00
Sanded the Recently Glassed Fracture Line Glass
Details
       

 10-21-2012
2.00
Sanded the Skirts Interior Fracture Line Micro Fil
Details

 10-07-2012
1.50
Glassed the Inside Aft Joint of the Canopy Skirts
Details
       

 10-05-2012
1.00
Removed the Canopy Skirts to Glass the Inside Lip
Details

 10-04-2012
1.00
Re-glassed the Canopy Skirts Aft Joint
Details

 10-03-2012
3.00
Formed Clay Mold and Applied Aft Skirt Fiberglass
Details
       

 10-02-2012
1.00
Cut Posterboard Contours of Each Skirt Aft End
Details
       

 09-26-2012
1.00
Applied a Layer of 9 Oz. Glass and Peel Ply
Details
       

 09-25-2012
0.50
Filled Small Void in Skirt Joint with Super Fil
Details

 09-24-2012
0.25
Checked the Skirt vs. Empennage Clearance
Details
       

 09-23-2012
2.00
Sanded Aft End of Skirts and the Left Side Repair
Details
       

 09-22-2012
2.00
Sanded the Left Canopy Skirt
Details
       

 09-21-2012
1.50
Sanded the Right Canopy Skirt Liquid Shim
Details
       

 09-21-2012
0.50
Applied Liquid Shim to the Left Canopy Skirt
Details
       

 09-20-2012
1.00
Liquid Shim Applied to the Right Canopy Skirt
Details
       

 09-19-2012
1.00
Micro Balloon & Flox Gap Seal To Right Skirt Lip
Details
       

 09-18-2012
1.50
Heat Formed the Upper Lip of Both Canopy Skirts
Details
       

 09-17-2012
0.00
Sanded Filler and Adjusted the Skirt Top Lip 2
Details
       

 09-17-2012
4.00
Sanded Filler and Adjusted the Skirt Top Lip
Details
       

 09-15-2012
0.00
Filled the Fracture lines of the Canopy Skirts 2
       

 09-15-2012
6.00
Filled the Fracture lines of the Canopy Skirts
Details
       

 09-14-2012
0.00
Fitting the Canopy Skirt 3
Details
       

 09-14-2012
4.00
Fitting the Canopy Skirt 2
Details
       

 09-13-2012
2.00
Match Drilled the Skirts to the Canopy Frame
Details
       

 09-13-2012
1.00
Fit the Skirts
Details
       

 09-13-2012
2.00
Drilled the Canopy Frame with a #40 Bit
Details
       

 09-05-2012
0.75
Fabricated Fiberglass HS Bottom Gap Seal
Details
       

 08-13-2012
0.50
Glassed the Right Side of the Empennage Fairing
Details
       

 08-12-2012
2.50
Modified the VS/HS Empennage Fairing
Details
       

 08-11-2012
2.00
Installed Nutplates for the HS/VS Fairing
Details
       

 08-10-2012
1.00
Trim Fitted the Large Empennage Fairing
Details
       

 08-10-2012
0.50
Sprayed Empennage Fairing Pieces
Details

 08-09-2012
2.00
Sanded the Empennage Fairings
Details
       

 08-08-2012
1.00
Sprayed the Empennage Fairings with White Primer
Details

 08-07-2012
3.00
Sanded UV Smooth Prime from Empennage Fairings
Details
     

 08-06-2012
1.00
Applied 3 Thin Rolled Layers of UV Smooth Prime
Details
       

 08-04-2012
3.00
Sprayed Primer of the Empennage Fairings
Details
       

 08-03-2012
2.00
Sanded Awl Fair Smooth on Empennage Fairings
Details
     

 08-02-2012
3.00
Sanded Empennage Fairings with Foam Blocks
Details
       

 08-01-2012
2.00
Sanded the Awl Fair with 120 Grit Paper
Details
       

 07-31-2012
3.50
Sanded Empennage Fairings with 120 Grit Paper
Details

 07-30-2012
6.00
Applied Microballoon Slurry to Empennage Fairings
Details
       

 07-21-2012
1.50
Sanded Rudder Bottom Fairing with 120 Grit
Details
       

 07-19-2012
2.00
Sanded Rudder Bottom Fairing
Details
       

 07-18-2012
1.50
Applied Microballoon Slurry to Rudder Bottom Fairi
Details
       

 07-16-2012
1.50
Finished Assembly of a Downdraft Box
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.