Powered By Kitlog Pro v2.0
Pete's RV-8 Web Site
RV-8
Wiring & Electrical
Work Logs Found:
72
Category Work Time:
259 Hours
Date
Hours
Work Log Summary
Details
09-22-2015
4.00
Rudder wiring
Details
09-21-2015
3.00
Wiring for pitch trim & rudder lights
Details
09-11-2014
1.00
Installed comm antenna
Details
09-02-2014
5.00
Wing wiring complete
Details
06-14-2013
6.00
P-Mag switch circuit breakers and documentation
Details
06-13-2013
4.00
More wire clean-up (beneath cockpit)
Details
06-13-2013
2.00
Electrical Testing
Details
06-12-2013
6.00
More wire labeling and clean-up
Details
06-11-2013
6.00
Wiring labeling and clean-up
Details
06-09-2013
0.00
Preliminary electrical check
Details
06-06-2013
1.00
Heat shrink and conduit
Details
06-06-2013
2.00
Grounding suntail LED
Details
06-06-2013
2.00
Flap wiring
Details
06-03-2013
1.00
Wiring idea for flaps
Details
06-02-2013
2.00
Grounded intercom shields and conductors
Details
06-01-2013
5.00
Circuit testing
Details
05-31-2013
4.00
Aux audio input and encoder connector
Details
05-30-2013
2.50
Terminated intercom wires (all but grounds)
Details
05-30-2013
3.00
Antenna cables (encoder, VOR/ILS)
Details
05-29-2013
3.00
Reworked encoder harness
Details
05-27-2013
4.00
Intercom and autopilot harness
Details
05-26-2013
2.00
Relocated encoder mounting bracket
Details
05-24-2013
6.00
Wiring continued
Details
05-23-2013
6.00
Wiring continued
Details
05-18-2013
5.00
Wiring
Details
05-15-2013
8.00
Installing more instrument harnesses
Details
05-13-2013
6.00
Installed comm & xpndr antennas
Details
05-07-2013
4.00
Terminating wires on strip under front cockpit
Details
05-06-2013
2.00
Resolving radio to intercom wiring
Details
05-04-2013
2.00
Questions for avionics guru at WBF, Inc.
Details
05-01-2013
8.00
Numerous wiring tasks
Details
04-29-2013
4.00
Starter circuit experiment and flap system
Details
04-28-2013
4.00
Additional wiring tasks
Details
04-27-2013
1.50
Modified and installed dimmer wiring harness
Details
04-26-2013
2.00
Wiring harnesses inspection & labeling
Details
04-24-2013
7.00
Circuit testing - starter
Details
04-18-2013
3.00
Circuit testing
Details
04-17-2013
7.00
Completed trim wiring & miscellaneous
Details
03-14-2013
3.00
Modification of stick wiring harness
Details
11-03-2012
2.00
Fabricated panel mount for ELT and +12V power
Details
11-02-2012
2.00
Fabricated trim relay mounting tray
Details
10-29-2012
5.00
Completed trim system harnesses
Details
10-28-2012
2.00
Fabricated wiring for fuel gauges
Details
10-27-2012
3.00
Fabricated trim harnesses
Details
10-26-2012
20.00
Wiring organization, verification, and testing
Details
10-25-2012
6.00
Firewall manifold and wiring organization
Details
10-21-2012
6.00
Reworked console wiring
Details
10-04-2012
4.00
Switch console wiring organization
Details
10-03-2012
4.00
Wiring in rear cockpit area
Details
10-02-2012
3.00
More electrical work
Details
09-26-2012
6.00
Continued running electrical wiring
Details
09-25-2012
4.00
Cleaned up and repaired used harnesses
Details
09-22-2012
6.00
More electrical work
Details
09-21-2012
4.00
Forward bulkhead panels
Details
09-16-2012
3.00
Replaced wire to rudder (nav/strobe)
Details
09-13-2012
3.00
Autopilot wiring, landing/taxi lgts, FPS wiring
Details
09-12-2012
4.00
Installed static & trim wire and the FPS component
Details
09-11-2012
0.00
Ordering electrical components
Details
09-10-2012
0.00
Studying electrical plans & schematics
Details
09-09-2012
4.00
Miscellaneous wiring
Details
07-07-2012
2.00
Assembled right switch console
Details
07-03-2012
2.00
Aft fuselage wiring and ELT install
Details
05-01-2012
2.00
Installed nav/position light wiring in tail cone
Details
04-30-2012
3.00
Installed ELT coax, static line, elevator trim cab
Details
04-28-2012
1.00
Located and installed ELT antenna
Details
04-24-2012
0.20
Installed ELT with mounting bracket
Details
04-23-2012
3.50
Fabricated ELT mounting bracket
Details
03-20-2012
0.50
Switch/circuit breaker console
Details
03-18-2012
1.00
Install jacks & 12V power receptacle
Details
09-30-2011
2.00
Installed cockpit lights
09-26-2011
2.00
Fabricated & installed terminal block and grounds
Details
09-21-2011
2.00
Installed cockpit lights
Details
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
1127
2782
About the Builder
12
Canopy
60
198
Electrical Supplies
2
Elevators
40
79
Empennage
22
104
Engine
55
145
Finishing Kit
31
178
Fuselage
293
898
Hangar/Workshop
28
Horiz Stabilizer
33
49
Instrument Panel
22
47
Miscellaneous
103
4
Paint
15
Primer
3
Prop
5
28
Reference Material
14
Rudder
19
37
RV-8 Specifications
2
Shop Supplies
5
Software
1
Tools
27
4
Tools (Fabricated)
15
16
Training Project
5
7
Vertical Stabilizer
14
26
Wheels & Brakes
1
2
Wings
192
645
Wiring & Electrical
72
259
Workshop
36
56
Copyright © 2001-2024 Matronics. All Rights Reserved.