KitLog pro

Powered By Kitlog Pro v2.0

John (Jack) Clark's Web Site
Work Logs Found: 79
Category Work Time: 272 Hours
 Date
Hours
Work Log Summary

Details

 03-28-2025
3.50
Riveted F-01410/F-01407/F-01408/F-0140
Details
       

 03-28-2025
0.50
Riveted F-01408/F-0140 Bulkheads
Details
       

 03-25-2025
1.00
Riveted the F-01412 Bulkheads together
Details
       

 03-24-2025
0.50
Primed the F-01412 Bulkheads and Tie Down
Details
     

 03-23-2025
1.00
Dimpled the F-01412 Bulkheads
Details

 03-21-2025
1.00
Match Drilled F-01412 Bulkheads to Vertical Stab
Details
       

 03-21-2025
2.00
Fabricated the F-14113 Rudder Stops
Details
       

 03-20-2025
7.00
Separated and Deburred Numerous Parts
Details
       

 03-19-2025
1.00
Collected Parts to Start Tail Cone Assembly
Details

 03-18-2025
1.00
Installed Elevator Lead Counterweights
Details
       

 03-17-2025
2.00
Rolled the Elevator Leading Edges and Riveted
Details
       

 03-15-2025
2.00
Installed the Pitch Trim Servo in the Left Elevato
Details
       

 03-13-2025
4.00
Assembled the Pitch Trim Servo Assembly
Details
       

 03-12-2025
5.00
Double Flush Riveted Elvator Trailing Edges
Details
       

 03-10-2025
1.00
Adhered Elevator Top Skins to Trailing Edge Wedges
Details
       

 03-09-2025
4.50
Riveted Skins to the Tip Ribs
Details
       

 03-08-2025
5.00
Riveted Elevator Ribs to the Forward Spar
Details
       

 03-07-2025
1.00
Clecoed Elevator Frames Inside Skins/Rear Spar
Details
       

 03-04-2025
7.00
Riveted the Right Top Skin to the Rear Spar
Details
       

 03-03-2025
3.00
Clecoed the E-1008 A&B Ribs together
Details
       

 03-02-2025
4.00
Riveted E-1008B Ribs to the Left Elevator Top Skin
Details
       

 03-01-2025
4.00
Riveted the E-1008B Ribs and Shear Clips
Details
       

 02-28-2025
2.00
Riveted the Elevator Horns to the Elevators
Details
       

 02-27-2025
1.50
Riveted the Counterbalance Skins to the Tip Ribs
Details
       

 02-25-2025
7.00
Riveted the Elevator Frames together.
Details
       

 02-24-2025
5.00
Marked the Elevator Rib Positions on the Skin
Details
       

 02-21-2025
5.00
Roughed up the Rib and Trailing edge areas
Details
       

 02-20-2025
4.00
Countersunk the Trailing Edges
Details
       

 02-19-2025
8.00
Dimpled the Tip Ribs Assembles #30 & #40 Holes
Details
       

 02-18-2025
2.00
Dimpled the E-913s and the Elevator Skins
Details

 02-17-2025
5.00
Etched, Cleaned & Primed the Elevator Components
Details
       

 02-16-2025
1.00
Disassembled the Elevators
Details

 02-15-2025
5.00
Attached Elevator Top Skins and Trailing Edges
Details

 02-14-2025
1.00
Attached the Tip Rib Assemblies to the Spar
Details
       

 02-14-2025
5.00
Assembled Left & Right Elevator Frames on Skins
Details
       

 02-13-2025
2.50
Drilled Trim Tab Hinge Pilot holes
Details
       

 02-12-2025
3.00
Cut & Sanded the Trailing Edge and Trim Tab Ribs
Details
     

 02-11-2025
4.50
Separated E-1008 A&B Ribs from each other
Details
       

 02-10-2025
8.00
Completed the Horizontal Stabilizer
Details
       

 02-09-2025
7.00
Riveted the HS Skins to the Front Spar Flanges
Details
     

 02-08-2025
4.50
Installed the Missing AN470AD4-5 Rivets
Details

 02-07-2025
6.00
Drillted Out the Front Spar Flange Rivets
Details

 02-06-2025
7.00
Today was a Disappointing Setback Day
Details
     

 02-05-2025
7.00
Riveted the HS-1004s to the HS-00916
Details
       

 02-04-2025
6.00
Dimples the Horizontal Stabilizer Skins
Details
       

 02-03-2025
2.50
Primed the Horizontal Stabilizer Skins
Details

 02-01-2025
2.00
Match Drill Modified Inboard HS905 and HS 1005
Details

 01-31-2025
4.00
Deburred the HS Ribs
Details
     

 01-30-2025
4.00
Riveted HS Front Spar Doubler to the Spar
Details
       

 01-28-2025
4.00
Trimmed, Drilled and Deburred the Spar Caps
Details

 01-27-2025
4.00
Riveted Doubler to the HS Rear Spar
Details
       

 01-25-2025
3.00
Match Drilled HS Rear Spar and Doubler
Details

 01-24-2025
1.00
Deburred HS Spar and Doubler
Details

 01-23-2025
6.00
Riveted the Vertical Stailizer Skin to the Frame
Details
       

 01-22-2025
2.00
Riveted the Vertical Stabilizer Spar
Details
     

 01-22-2025
4.00
Riveted the Rudder Trailing Edge
Details
       

 01-21-2025
6.00
Riveted the Rudder Skin to the Rudder Spar
Details
       

 01-20-2025
1.50
Riveted the Rudder Skin to the Frame
Details
     

 01-19-2025
0.50
Attached the Horn Brace With CR3213-4-3 Rivets
Details
     

 01-18-2025
6.00
Installed the Rudder Skeleton in the Rudder Skin
Details
     

 01-17-2025
3.00
Attached the Left Skin Trailing Edge to the VHB Ta
Details
       

 01-16-2025
7.00
Removed Stiffeners From the Rudder Skins
Details
       

 01-15-2025
2.00
Riveted Rudder Stiffeners to Skins REVERSED!
Details

 01-08-2025
3.50
Primed Rudder parts before dimpling.
Details
       

 01-07-2025
3.50
Match Hole Drilled #40 Holes of the Rudder.
Details

 01-06-2025
1.50
Trimmed the Aft Edges of the Rudder Skin Stiffener
Details
       

 01-06-2025
3.00
Assembled the Rudder for Fit and Drilling
Details
       

 01-03-2025
7.00
Deburred/Primed/Assembled Rudder Skeleton
Details
       

 01-02-2025
2.50
Separated and Deburred Parts for the Rudder Spar
Details

 01-01-2025
2.00
Ordered a Replacement VS Spar Doubler
Details

 12-31-2024
1.50
Dimpled Skins, Ribs, Spar of VS
Details

 12-25-2024
1.00
Primed the VS Parts with Wash Primer
Details
       

 12-24-2024
1.50
Cleaned and ScrothBrited the VS Parts for Priming
Details

 12-23-2024
2.00
Assembled/Fit VS Parts together
Details

 12-22-2024
2.00
Gathered Parts fot the Vertical Stabilizer
Details

 10-09-2023
0.00
Checked Inventory for Laser Cut Parts
Details

 11-08-2022
2.00
Finished Empennage Kit Inventory
Details

 11-07-2022
6.00
Empennage Inventory Continues
Details

 11-06-2022
2.00
Unpacked the Empennage Crate/Inventoried Parts
Details










Copyright © 2001-2025 Matronics. All Rights Reserved.