Date
|
Hours
|
Work Log Summary
|
Details
|
02-02-2019
|
2.50
|
EAA 663 Advisor's reinspection
|
Details
|
|
|
01-21-2019
|
1.00
|
A/W cert!
|
Details
|
|
|
12-29-2018
|
2.00
|
Yet more miscellaneous jobs
|
Details
|
|
|
12-02-2018
|
3.50
|
Taxi test; depanel da plane
|
Details
|
|
|
11-25-2018
|
1.50
|
Flap reticule
|
Details
|
|
|
10-14-2018
|
2.00
|
Revised purge placard; cut down lock-out key
|
Details
|
|
|
10-13-2018
|
3.70
|
Fuse box card; Alt air guard
|
Details
|
|
|
09-30-2018
|
3.00
|
More follow-ups
|
Details
|
|
|
09-16-2018
|
10.00
|
Several small jobs...
|
Details
|
|
|
08-25-2018
|
4.00
|
Gas, prop, new compressor
|
Details
|
|
|
08-20-2018
|
0.00
|
19 August addendum
|
Details
|
|
|
08-19-2018
|
3.00
|
Inclined fuel flow
|
Details
|
|
|
07-29-2018
|
5.00
|
Flow meter issue: fixed; completed tank cals
|
Details
|
|
|
07-28-2018
|
5.00
|
It flows...but the flowmeter doesn't...new headset
|
Details
|
|
|
07-22-2018
|
7.30
|
Wet the tanks with avgas...alas no flow!
|
Details
|
|
|
07-21-2018
|
6.00
|
Cowl, main cotters, flow test line
|
Details
|
|
|
07-15-2018
|
6.00
|
Cowl hinge pin covers; fuel line leak check
|
Details
|
|
|
07-14-2018
|
6.00
|
Nose fork helicoil; a test seating
|
Details
|
|
|
07-07-2018
|
6.00
|
Weight and Balance
|
Details
|
|
|
07-06-2018
|
10.00
|
Main leg fairings; ELT g-switch test; Inital weigh
|
Details
|
|
|
07-04-2018
|
4.00
|
ADSB swap; ELT and Txpndr serial numbers
|
Details
|
|
|
06-24-2018
|
6.00
|
Cowl nose job; main fairing brackets
|
Details
|
|
|
06-23-2018
|
1.00
|
Cowling nose jobs continues
|
Details
|
|
|
06-19-2018
|
0.50
|
Cowling nose job: add micro
|
Details
|
|
|
06-17-2018
|
6.00
|
Cowl nose job; main wheel pants nutplates
|
Details
|
|
|
06-16-2018
|
7.00
|
Cowl nose job; alt safety; cockpit placards
|
Details
|
|
|
06-16-2018
|
0.00
|
Cockpit placards
|
Details
|
|
|
06-10-2018
|
6.50
|
More misc jobs from the punch list
|
Details
|
|
|
06-03-2018
|
8.00
|
Oil recovery/Spike/Mains Fairing Seams
|
Details
|
|
|
05-28-2018
|
11.00
|
Main gear fairings
|
Details
|
|
|
05-27-2018
|
0.00
|
New Batt/Canopy Handle/Main Gear Fairings
|
Details
|
|
|
05-20-2018
|
10.00
|
Wingtips/Nav-Strb installation
|
Details
|
|
|
05-13-2018
|
8.00
|
Wingtips/Good as Dead Battery
|
Details
|
|
|
05-05-2018
|
5.30
|
Spinner, Emp Fairing, Winch
|
Details
|
|
|
04-15-2018
|
7.50
|
Miscellaneous jobs, getting ready to weigh the a/c
|
Details
|
|
|
04-08-2018
|
0.00
|
Continuation of 4/7/2018 entry
|
Details
|
|
|
04-07-2018
|
7.00
|
Cockpit interior is COMPLETE.
|
Details
|
|
|
04-01-2018
|
5.00
|
A more joyful joystick; seat pans
|
Details
|
|
|
03-17-2018
|
3.50
|
Apply tail numbers; wingtip spanwise ribs
|
Details
|
|
|
03-11-2018
|
3.50
|
Harness; aileron pushrod boots; elev channel cover
|
Details
|
|
|
03-10-2018
|
5.70
|
Thin seat, data plate, Reg/AWC pocket, tips, harne
|
Details
|
|
|
03-24-2013
|
3.30
|
Secured aft conduits & static line anitchafe
|
Details
|
|
|
03-16-2013
|
4.00
|
Brake lines, contactors, big fat battery wire
|
Details
|
|
|
03-03-2013
|
1.00
|
Elevator trim servo wiring
|
Details
|
|
|
03-02-2013
|
3.00
|
Install cbn heat cntl box; laminated Cu bus bar
|
Details
|
|
|
02-16-2013
|
4.00
|
Battery box
|
Details
|
|
|
02-02-2013
|
4.00
|
Drill firewall for cabin heat control box
|
Details
|
|
|
12-02-2012
|
6.00
|
Map box, ADAHRS shelf
|
Details
|
|
|
09-03-2012
|
2.00
|
Stowing canopy, wheel pants, cowl
|
Details
|
|
|
09-02-2012
|
4.00
|
Inventory--h/w
|
Details
|
|
|
09-01-2012
|
3.00
|
Inventory--all but h/w
|
Details
|
|
|
08-31-2012
|
2.00
|
Finish kit Day! Part I
|
Details
|
|
|
08-31-2012
|
2.00
|
Finish Kit Day! Part II
|
Details
|
|
|
06-29-2012
|
0.00
|
Ordered the finish kit!
|
Details
|
|