Powered By Kitlog Pro v2.0
Kurt Haller RV-9A
Vans RV-9A
Engine
Work Logs Found:
22
Category Work Time:
144 Hours
Date
Hours
Work Log Summary
Details
01-27-2019
1.00
Servo filter check
Details
11-01-2018
1.80
2nd engine ground run; compression checks
Details
09-29-2018
2.80
Follow up after 1st engine start
Details
09-28-2018
0.00
FIRST ENGINE START! (part II)
Details
09-28-2018
2.00
FIRST ENGINE START! (part I)
Details
09-28-2018
0.00
FIRST ENGINE START (part III)
Details
05-06-2018
4.70
Pre-oil the engine
Details
10-15-2016
1.50
Last flame resistant caulking on the firewall
Details
07-10-2016
6.00
Spring return for fuel purge valve.
Details
05-30-2016
6.00
Bowden cable threaded end
Details
05-07-2016
80.00
It got BAFFLES
Details
08-02-2015
0.00
Baffles---oil cooler cutout
Details
04-07-2014
6.50
Manifold Pressure sensor installation
Details
03-30-2014
9.00
Hung exhaust, cntrl cable brackets
Details
03-22-2014
8.50
Hung the engine, installed alternator
Details
03-22-2014
0.00
Alternator installed
Details
03-18-2014
1.00
Engine mount
Details
04-08-2013
3.30
Sensor manifold installation
Details
01-09-2013
3.00
FWF kit ordered and received
Details
11-30-2012
2.80
Engine mount final match drill to f/w
Details
08-31-2012
4.00
Engine Day!
Details
06-28-2012
0.00
Ordered an engine!
Details
SITE NAVIGATION
Contact Builder
Vans RV-9A Home
Category
# Logs
# Hours
All
636
2839
Avionics
22
98
Canopy (slider)
12
81
Cowl
4
5
Electrical
7
32
Empennage
95
377
Engine
22
144
Finish
54
231
Flight
6
Fuselage
188
815
Landing Gear
6
34
Miscellaneous
7
56
None
4
Panel
4
Paperwork
1
1
Prop
2
Tools
3
Wings
199
965
Copyright © 2001-2024 Matronics. All Rights Reserved.