KitLog pro

Powered By Kitlog Pro v2.0

Daves Web Site
Work Logs Found: 29
Category Work Time: 282 Hours
 Date
Hours
Work Log Summary

Details

 04-21-2017
2.00
Temporary Firewall fitting
Details
       

 12-05-2012
10.00
Nose Gear Box
Details
       

 09-12-2012
10.00
More Floor pics
Details
       

 09-11-2012
10.00
Fuselage tapes added
Details
       

 09-06-2012
10.00
Join the floor ver2
Details
       

 09-05-2012
10.00
Glass Floor Prep ver2
Details
       

 09-04-2012
10.00
Floor shaping ver2
Details
       

 09-01-2012
10.00
Floor Prep ver2
Details
       

 08-01-2012
10.00
Remove Floor
Details
       

 07-24-2012
10.00
Rear seat tapes
Details
       

 07-23-2012
10.00
Front inside tapes
Details
       

 07-19-2012
10.00
Floor layup2
Details
       

 07-19-2012
10.00
Floor layup1
Details
       

 07-18-2012
10.00
Floor prep
Details
       

 07-16-2012
10.00
Build a curve into the floor
Details
       

 07-14-2012
10.00
Floor fitting prep
Details
       

 07-13-2012
10.00
Begin contouring the floor
Details
       

 07-09-2012
10.00
Cutting floor to size
Details
       

 07-03-2012
10.00
F28 doubler and clean up
Details
       

 07-01-2012
10.00
Front side Tapes
Details
       

 06-30-2012
10.00
Add F28 bulkhead and support blocks
Details
       

 06-29-2012
10.00
F22 & Ft Seat Tapes
Details
       

 06-25-2012
10.00
Back Seat Tapes
Details
       

 06-23-2012
10.00
Flox bulkheads to sides
Details
       

 06-22-2012
10.00
Firewall Datum and setup
Details
       

 06-20-2012
10.00
Trial Bulkhead/Sides Setup
Details
       

 06-17-2012
10.00
More Bulkhead prep
Details
       

 06-16-2012
10.00
Preparing Bulkheads
Details
       

 06-13-2012
10.00
Start Fitting the bulkheads
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.