Powered By Kitlog Pro v2.0
Michaels Web Site
Sonex Standard Gear
Engine
Work Logs Found:
224
Category Work Time:
233 Hours
Date
Hours
Work Log Summary
Details
08-22-2021
0.00
Replace Rear Oil Seal
Details
02-21-2020
0.00
Cabin Heater Testing Again
Details
02-09-2020
0.00
Cabin Heater Testing 2 of 2
Details
02-09-2020
0.00
Cabin Heater Testing 1 of 2
Details
02-02-2020
0.00
Cabin Heater Testing
Details
01-26-2020
0.00
Cabin Heater Testing 2 of 2
Details
01-26-2020
0.00
Cabin Heater Testing 1 of 2
Details
01-18-2020
0.00
Cabin Heat 2.0 Testing
Details
01-15-2020
0.00
Cabin Heat 2.0 Pg 3 of 3
Details
01-04-2020
0.00
Cabin Heat 2.0 Pg 2 of 3
Details
01-04-2020
0.00
Cabin Heat 2.0 Pg 1 of 3
Details
11-12-2017
0.00
Oil cooler blank plate
Details
08-09-2017
0.00
Install spark plug Time-Serts
Details
07-04-2017
0.00
Helicoil for stripped bolt hole 2 of 2
Details
07-04-2017
0.00
Helicoil for stripped bolt hole 1 of 2
Details
06-09-2017
0.00
Changing to Top Oil Cooler 2 of 2
Details
06-09-2017
7.00
Changing to Top Oil Cooler 1 of 2
Details
06-08-2017
0.00
Changing to Top Oil Cooler 3 of 3
Details
06-08-2017
0.00
Changing to Top Oil Cooler 2 of 3
Details
06-08-2017
7.00
Changing to Top Oil Cooler 1 of 3
Details
11-16-2016
0.00
If You Have a Hot Engine (part 2)
Details
11-16-2016
0.00
If You Have a Hot Engine (Part 1)
Details
12-26-2015
0.00
New pushrod tubes
Details
10-29-2015
0.00
New oil cooler hoses
Details
10-24-2015
0.00
Oil change + alternator stator
Details
10-21-2015
0.00
First Flight on Rebuilt Engine
Details
10-17-2015
0.00
First Startup after Rebuild
Details
10-13-2015
0.00
Installed oil cooler
Details
10-12-2015
0.00
Reinstall Engine
Details
10-11-2015
0.00
Completion of engine rebuild (2 of 2)
10-11-2015
0.00
Completion of engine rebuild (1 of 2)
Details
10-10-2015
0.00
Back of case hardware (2 of 2)
Details
10-10-2015
0.00
Back of case hardware (1 of 2)
Details
10-08-2015
0.00
Misc case accessories
Details
10-07-2015
0.00
Deck heights & compression
Details
10-06-2015
0.00
Crank-Cam-Case (4 of 4)
10-06-2015
0.00
Crank-Cam-Case (3 of 4)
10-06-2015
0.00
Crank-Cam-Case (2 of 4)
10-06-2015
0.00
Crank-Cam-Case (1 of 4)
Details
10-05-2015
0.00
Bearing and case assembly
Details
10-04-2015
0.00
Install prop hub
Details
10-03-2015
0.00
Timing gear installation
Details
10-03-2015
0.00
Oil relief seat
Details
10-02-2015
0.00
Press off prop hub
Details
09-28-2015
0.00
Measure the cc's of the heads
Details
09-26-2015
0.00
Clean cases
Details
09-25-2015
2.00
Almost finished cleaning
Details
09-24-2015
0.00
Remove con rods; clean more parts (3 of 3)
09-24-2015
0.00
Remove con rods; clean more parts (2 of 3)
09-24-2015
0.00
Remove con rods; clean more parts (1 of 3)
Details
09-23-2015
0.00
More cleaning
Details
09-22-2015
0.00
Remove pistons; Open case (2 of 2)
Details
09-22-2015
0.00
Remove pistons; Open case (1 of 2)
Details
09-20-2015
0.00
Begin engine disassembly (3 of 3)
09-20-2015
0.00
Begin engine disassembly (2 of 3)
09-20-2015
0.00
Begin engine disassembly (1 of 3)
Details
09-19-2015
0.00
Remove engine for rebuild
Details
09-05-2015
0.00
Nickasil Cylinder Damage
Details
06-06-2015
0.00
Flywheel Cap Screw Failure (2 of 2)
Details
06-06-2015
0.00
Flywheel Cap Screw Failure (1 of 2)
Details
06-06-2015
0.00
Engine repairs
Details
06-06-2015
0.00
Engine repairs
Details
06-04-2015
0.00
New heat muff
Details
04-04-2015
0.00
Remote charging port (2 of 2)
Details
04-04-2015
2.00
Remote charging port (1 of 2)
Details
03-03-2015
1.50
New Heat Muff
Details
02-22-2015
2.00
New Heat Muff
Details
02-21-2015
2.00
New Heat Muff
Details
01-05-2015
0.00
Battery Charge Connection
Details
10-11-2014
2.50
New engine shock mounts
Details
06-30-2014
0.00
Engine click solved!
Details
06-24-2014
0.00
Engine Click!
Details
06-18-2014
0.00
Final install of new throttle/mixture cables
Details
06-17-2014
0.00
New fuel line and throttle cable
Details
06-11-2014
0.00
Starting replacement of throttle cable
Details
06-07-2014
0.00
Reversing flywheel magnet
Details
06-07-2014
0.00
Last minute pre-flight tasks
Details
06-05-2014
0.00
Disconnect prior to engine removal
Details
05-31-2014
0.00
Primary ignition with Keith Macht
Details
05-26-2014
1.00
Mag checks
Details
05-24-2014
1.00
Taxi test
Details
05-17-2014
2.00
Re-check upper plugs
Details
05-11-2014
0.00
Another test run
Details
05-10-2014
2.00
Reinstall oil sump plate nuts
Details
05-05-2014
2.00
Reinstalled new EGT #4 probe
Details
04-26-2014
0.75
Compression check
Details
04-21-2014
2.50
Misc engine stuff
Details
04-20-2014
0.00
Another Engine Start
Details
04-12-2014
1.00
FIRST SUCCESSFUL ENGINE START!
Details
04-06-2014
2.00
New coil wiring
Details
04-05-2014
0.00
Attempted first start
Details
04-01-2014
0.00
Over torque spark plug
Details
03-29-2014
0.50
Re-installed battery & connections
Details
03-01-2014
2.00
Differential compression check
Details
02-16-2014
1.00
Modified air/oil separator
Details
01-17-2014
0.75
Reinstall oil cooler
Details
01-15-2014
0.50
Reinstalling new oil cooler
Details
01-13-2014
0.50
Remove oil cooler
Details
12-14-2013
0.00
Air filter
Details
11-19-2013
1.25
Oil cooler lines
Details
11-14-2013
1.00
Air/Oil Separator
Details
11-14-2013
0.00
Air/Oil Separator
Details
11-02-2013
0.75
Air/Oil separator
Details
10-29-2013
0.75
Air/Oil separator...again
Details
10-28-2013
1.25
Oil breather thru baffle
Details
10-04-2013
3.25
Misc stuff
Details
10-01-2013
1.50
Exhaust wrap + air/oil separator
Details
09-30-2013
2.00
Exhaust wrap, air/oil separator
Details
09-24-2013
2.00
Wiring + heater + cowl
Details
09-22-2013
0.75
Exhaust
Details
09-21-2013
2.50
Oil Cooler Baffles - Done
Details
09-20-2013
2.00
Oil Cooler Baffles
Details
09-17-2013
1.75
Oil Cooler Baffles
Details
09-16-2013
1.75
Oil Cooler Baffle
Details
09-15-2013
2.00
Oil Cooler Baffles
Details
09-14-2013
0.75
Right exhaust attach
Details
09-14-2013
1.25
Oil cooler baffles
Details
09-11-2013
2.00
Oil cooler, exhausts, cowl
Details
09-04-2013
1.00
Exhaust springs
Details
09-04-2013
1.50
Exhaust pipes & other things
Details
05-14-2013
1.50
CHT probes + Secure cables
Details
04-17-2013
1.25
Finish lower baffles
Details
04-16-2013
1.50
Lower right baffle seals
Details
04-15-2013
1.75
Rivet lower left baffle seals
Details
04-14-2013
2.00
Lower baffle seals
Details
04-13-2013
1.75
Completer rear and side baffles
Details
04-12-2013
3.00
Rear baffle seal
Details
04-10-2013
1.25
Extend baffles
Details
04-09-2013
1.75
Attaching baffle material
Details
04-08-2013
2.00
Testing baffle material placement
Details
04-06-2013
2.00
Cut baffles to fit cowl
Details
04-05-2013
2.00
Rivet baffles
Details
04-03-2013
2.00
Drill baffles
Details
04-02-2013
3.00
Finalize baffle layout
Details
04-01-2013
2.25
Baffles
Details
03-31-2013
0.00
More baffle photos
Details
03-31-2013
2.00
Learn baffle locations
Details
03-05-2013
1.50
Attach mixture cable
Details
03-04-2013
2.00
AeroInjector connections
Details
03-03-2013
2.00
Engine alignment, etc.
Details
02-24-2013
1.50
Attach heat muff + fit exhaust pipes
Details
02-22-2013
1.50
Baffles & cowl
Details
02-13-2013
2.00
Baffles
Details
02-12-2013
2.50
Rear baffle
Details
02-12-2013
0.00
Rear baffle
Details
02-12-2013
0.00
Rear baffle
Details
02-11-2013
1.00
Engine baffles
Details
02-11-2013
2.50
Coil plug-wires + baffles
Details
02-10-2013
1.00
Control cables and supports
Details
02-09-2013
1.00
Finish heat muff
Details
02-08-2013
3.00
Remake heat muff
Details
02-04-2013
2.00
Oil Cooler Baffle
Details
02-02-2013
1.00
Wiring + AeroInjector
Details
02-02-2013
0.00
Engine hanging day!
Details
01-31-2013
0.75
Spark plugs + terminal block
Details
01-31-2013
0.75
Heat control cable
Details
01-30-2013
0.50
Heat muff + starter ground
Details
01-29-2013
0.75
Heat muff
Details
01-28-2013
1.25
Intake, exhaust, probes
Details
01-28-2013
1.00
Continue on heat muff + got cowl!
Details
01-26-2013
1.25
Exhaust + electrics
Details
01-26-2013
1.25
Cabin heat muff
Details
01-25-2013
1.25
Cabin heat muff
Details
01-12-2013
2.50
More wiring
Details
01-11-2013
2.00
More wiring
Details
01-08-2013
2.00
More wiring
Details
01-02-2013
1.50
More wire connectors
Details
01-01-2013
1.75
More wire connectors
Details
12-30-2012
4.00
Engine & firewall electrical
Details
12-27-2012
1.00
Terminal block install
Details
12-26-2012
1.50
Laying out electric runs & firewall penetration
Details
12-22-2012
2.00
Firewall forward wiring
Details
12-20-2012
2.00
CHT & Spark Plugs
Details
12-19-2012
2.00
Add master & starter relays to firewall
Details
12-17-2012
1.50
More firewall prep
Details
12-15-2012
1.50
More firewall prep
Details
12-14-2012
0.00
Smoke oil tank considerations (READ THIS)
Details
12-14-2012
2.50
More firewall prep
Details
12-13-2012
2.00
More firewall prep
Details
12-12-2012
2.00
Laying out and drilling firewall
Details
12-12-2012
0.00
Engine timing mark
Details
12-08-2012
1.25
Oil Cooler
Details
12-08-2012
1.25
Alternator Install
Details
12-07-2012
2.50
Intake
Details
12-07-2012
0.00
Intake
Details
12-06-2012
2.00
Finally finished flywheel
Details
12-01-2012
1.00
Re-doing shims
Details
11-28-2012
2.00
Re-doing shims
Details
11-16-2012
1.00
Re-do flywheel assembly
Details
11-16-2012
0.25
Oil sump plate
Details
11-12-2012
2.00
Misc
Details
11-10-2012
3.00
Flywheel & accessory plate
Details
11-10-2012
0.00
Flywheel & accessory plate
Details
11-09-2012
3.00
Rockers, crank seal, accessory plates
Details
11-09-2012
0.00
Accessory plates
Details
11-08-2012
2.50
2nd rockers + oil accessories
Details
11-05-2012
0.00
Pushrods & rockers
Details
11-05-2012
3.50
Push rods & rockers
Details
11-03-2012
1.75
Redo + rocker arms
Details
11-02-2012
2.00
Attach cylinders & heads
Details
10-29-2012
2.00
Cylinder Assembly
Details
10-21-2012
2.25
Assemble crank case
Details
10-21-2012
0.00
Assemble crank case
Details
10-18-2012
1.25
Crank & cam installation
Details
10-18-2012
0.00
Crank & cam installation
Details
10-16-2012
1.75
Assemble case & bearings
Details
10-16-2012
0.00
Assemble case & bearings
Details
10-13-2012
2.50
Paint engine block
Details
10-12-2012
3.50
STARTED MY AEROVEE BUILD!
Details
10-12-2012
0.00
More pics of day 1
Details
09-14-2012
0.00
Little progress, but ordered AeroVee!
Details
08-10-2012
3.00
Cabin heat box (shuttle)
Details
07-15-2012
1.00
Complete battery box
Details
07-14-2012
3.00
Battery Box
Details
07-12-2012
2.00
Battery Box - again!
Details
07-10-2012
0.25
Battery box
Details
07-09-2012
1.00
Battery Box
Details
07-07-2012
0.75
Engine mount - final prep
Details
07-06-2012
0.75
Engine mount - finish holes
Details
07-05-2012
2.25
Engine Mount
Details
07-04-2012
1.75
Engine Mount
Details
07-02-2012
2.00
Shims for engine mount
Details
06-30-2012
0.75
Test fitting engine mount
Details
06-28-2012
0.00
Received engine mount & wheel assemblies
Details
SITE NAVIGATION
Contact Builder
RV-7 Home
Sonex Standard Gear Home
Category
# Logs
# Hours
All
1608
2445
Aluminum Materials
45
98
Angle Parts
63
126
Avionics
96
132
Bending Brake
10
15
Canopy
61
91
Controls
55
85
Cowl
84
99
Empennage
100
179
Engine
224
233
Finish-Polish
66
85
FLIGHT!
18
Fuel System
36
43
Fuselage
208
382
Hardware
3
4
Landing Gear
74
95
Learning Point
2
1
Miscellaneous
84
111
None
7
Prop
6
7
Smoke System
7
6
Tools
5
9
Upholstery
7
6
Wings
347
638
Copyright © 2001-2024 Matronics. All Rights Reserved.