KitLog pro

Powered By Kitlog Pro v2.0

Phils Web Site
Work Logs Found: 10
Category Work Time: 68 Hours
 Date
Hours
Work Log Summary

Details

 12-02-2012
2.00
Updated Firmware/Calibrated MGL Avionics
Details
       

 11-10-2012
0.00
Misc Entry for detail of V6 Radio Standoff
Details
       

 09-30-2012
4.00
PTT
Details
       

 09-29-2012
10.00
Installed Transponder and Comm Radios
Details
       

 09-21-2012
6.00
Reinstall Panel / Engine Oil Leaks
Details

 08-23-2012
8.00
Electrical Wiring
Details
       

 08-17-2012
8.00
Panel Wiring
Details
       

 07-15-2012
12.00
Installed Comm and Transponder Ant. Installed Tra
Details
       

 06-24-2012
12.00
Installed Ground Bar/Installed Panel Switches
Details
       

 06-10-2012
6.00
Started to Layout Panel
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.