Powered By Kitlog Pro v2.0
My RV-8 Project
RV-8
Fuselage
Work Logs Found:
49
Category Work Time:
174 Hours
Date
Hours
Work Log Summary
Details
03-01-2014
4.00
Rear throttle and matching panel
Details
02-27-2014
3.00
Weight and Balance day
Details
01-10-2014
3.00
Girl in back right side panel
Details
12-09-2013
3.00
Installed rudder pedals and brake lines
Details
11-30-2013
2.00
Baggage door support
Details
11-11-2013
5.00
Baggage door day 4
Details
11-09-2013
4.00
Baggage door day 3
Details
11-06-2013
4.00
Baggage door day 2
Details
11-04-2013
4.00
Baggage door day 1
Details
09-25-2013
6.00
Forward Top Skin
Details
09-08-2013
7.00
Throttle quadrant
Details
09-05-2013
3.00
Installed left foot panel
Details
04-17-2013
2.00
Glare shield vinyl and defroster
Details
04-02-2013
4.00
Fuel pump cover
Details
04-01-2013
0.50
Off the rotisserie!
Details
03-10-2013
1.00
Rudder pedal extensions
Details
03-10-2013
2.00
Rudder cable covers
Details
03-10-2013
1.00
Added individual brake reservoirs
Details
02-15-2013
4.00
Flap mechanism cover
Details
02-15-2013
4.00
Battery access hatch
Details
02-13-2013
4.00
Do it all over day....
Details
02-12-2013
8.00
Fuselage side rails, windscreen hoop and canopy ra
Details
02-04-2013
1.00
Riveted panel surround to the fuselage
Details
01-30-2013
3.00
bulkhead fitting for vent scat tube
Details
12-01-2012
4.00
Landing gear tower modification
Details
11-03-2012
8.00
Cockpit rail and front seat back support
Details
10-14-2012
5.00
Forward fuselage skin
Details
10-14-2012
3.00
Forward baggage door hinge support and side suppor
Details
10-13-2012
4.00
Infinity Grip Install
Details
10-12-2012
3.00
POS12 Flap position sensor
Details
10-06-2012
3.00
Ran wiring for flap motor and finished panel struc
Details
10-01-2012
2.00
Panel fit and firewall bend
Details
09-29-2012
4.00
Andair fuel pump
Details
07-09-2012
4.00
Throttle/Mixture cables, rear throttle linkage, fu
Details
07-04-2012
4.00
Rear Seat back and ground for Whelen shielded line
Details
07-04-2012
5.00
Andair fuel selector valve
Details
06-28-2012
3.00
Pilot seat
Details
06-25-2012
3.00
Pitch AutoPilot and Rear seat throttle
Details
06-22-2012
5.00
Interior paint day
Details
06-21-2012
2.00
Whelen Power supply mounted
Details
06-20-2012
5.00
Wiring day
Details
06-15-2012
1.00
Disassembled for interior paint
Details
06-14-2012
2.00
Installed ELT
Details
06-13-2012
2.00
Installed electric roll trim
Details
06-04-2012
2.00
Assembled rear seat floor skins
Details
05-26-2012
9.00
Nut plate day
Details
05-26-2012
1.00
More nutplates
Details
05-25-2012
6.00
Cabin Details
Details
05-23-2012
2.00
Built rotisserie for fuselage out of engine stand
Details
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
239
854
Avionics
52
158
Canopy
26
105
Cowl
9
43
Electrical
28
89
Empennage
7
27
Engine
11
35
Firewall Forward
30
104
Fuel System
3
8
Fuselage
49
174
Gear
10
58
Oxygen System
1
4
Prop
1
2
Shop Supplies
3
5
Wings
9
42
Copyright © 2001-2024 Matronics. All Rights Reserved.