Powered By Kitlog Pro v2.0
Waynes Bearhawks
4-Place Bearhawk
Tail
Work Logs Found:
30
Category Work Time:
157 Hours
Date
Hours
Work Log Summary
Details
07-15-2012
7.00
Trim tab drive
Details
07-07-2012
3.00
Trim tab drive parts
Details
07-01-2012
4.00
Connect elevator
Details
06-30-2012
4.00
Horizontal stab struts
Details
06-25-2012
1.50
Weld horz stab attach
Details
06-24-2012
4.50
Square up horizontal stabilizer
Details
06-23-2012
7.00
Mount horizonal stab
Details
06-19-2012
3.00
Misc parts
Details
06-16-2012
3.00
Horizontal stab forward mounts
Details
06-15-2012
5.50
Horizontal stab rear mounts
Details
06-08-2012
7.00
Finish vertical stab
Details
05-29-2012
3.50
Vertical stab
Details
05-23-2012
6.50
Finished rudder
Details
05-22-2012
7.00
Rudder
Details
05-17-2012
10.00
Started rudder
Details
05-08-2012
10.00
Right Elevator
Details
04-26-2012
5.00
Welded left elevator
Details
04-25-2012
6.00
Assembling left elevator
Details
04-24-2012
6.00
Start assembling left elevator
Details
04-23-2012
2.00
Lay out elevator
Details
04-18-2012
5.00
Finish elevator hinges
Details
04-17-2012
4.00
Elevator/rudder hinges
Details
04-13-2012
4.00
Elevator/rudder hinges
Details
04-12-2012
5.00
Horizontal stab bushings
Details
04-10-2012
6.00
Horizontal stabs
Details
03-31-2012
3.50
Started 2nd horizontal stab
Details
03-29-2012
3.00
First horizontal stab tacked
Details
03-28-2012
6.00
More horizonal stab
Details
03-27-2012
7.00
Horizontal stab T-25 ribs
Details
03-26-2012
8.00
Started horizontal stabilizer
Details
SITE NAVIGATION
Contact Builder
Bearhawk LSA Home
4-Place Bearhawk Home
Category
# Logs
# Hours
All
509
2633
Ailerons
20
100
Aux Fuel Tanks
32
168
Electrical
1
8
Flap/Aileron Hinges
13
78
Flaps
18
106
Flight Controls
21
115
Fuel System
32
168
Fuselage
86
468
Miscellaneous
13
15
Ribs
36
190
Spars
57
303
Tail
30
157
Wing Assembly
40
216
Wing Skinning
92
442
Wing Steel Parts
18
99
Copyright © 2001-2024 Matronics. All Rights Reserved.