Powered By Kitlog Pro v2.0
Bill & Brendas RV-8 QB
RV-8
Wire work
Work Logs Found:
22
Category Work Time:
27 Hours
Date
Hours
Work Log Summary
Details
11-14-2014
1.50
wig wag gremlin search
Details
08-11-2014
3.00
fix wiring for trim indicators. Check auto pilot s
Details
07-24-2014
1.50
right wing wiring connections at root
Details
07-22-2014
0.75
Wing root wiring left side
Details
07-14-2014
2.00
Molex connectors for fuse to wing junction
Details
12-01-2013
1.25
Shunt wire to buss terminal and to master relay
Details
10-09-2013
2.50
Sort EMS wires for FWF from Panel sides
Details
10-09-2013
0.50
Run required engine sensor wires forward
Details
10-07-2013
0.75
Continuity check and label of EMS wires
Details
09-15-2013
1.00
Install hot battery fuse block
Details
06-22-2013
0.00
PIC SET 2 FOR 6-22-13
06-12-2013
0.25
wires thru baggage area to firewall secured
Details
06-08-2013
0.50
bundled wire in baggage area
Details
06-07-2013
0.75
starter wiring routed fwd thru firewall
Details
04-19-2013
0.75
terminal block final install and grounding studs t
Details
02-11-2013
2.50
complete molex connect on pitch trim and started r
Details
02-10-2013
3.00
Trim tab servo wire connection-2
Details
02-09-2013
0.75
D-sub pins to the elevator trim tab servo-1
Details
07-05-2012
0.50
Comm ant coax and xpdr coax bnc connector attached
Details
07-01-2012
1.00
Setting up rg 400 stripping tool
Details
05-22-2012
0.00
Trim servo wire routing and Elt antenna pics
Details
05-22-2012
2.50
Auto pilot servo wire routing and pitch trim wire
Details
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
1040
2332
baffles
37
97
brake system
16
23
Canopy
64
162
Canopy skirt
47
75
Canopy/windscreen
64
162
cowling
58
130
electical-FWF
4
3
Electrical-cockpit
12
16
Elevators
20
63
Empennage
11
28
Engine
20
41
Exterior lights and
6
8
FAB
16
36
Fiberglass fairings
9
8
Fiberglass tips
46
68
Firewall Forward
46
90
Fuselage
136
329
Horizontal Stabilize
15
68
interior cushions an
3
8
Inventory
8
19
jigs, cradles, stand
6
15
Kit arrival
7
6
labels and plackards
2
3
Landing gear
17
40
Lights
12
28
Miscellaneous
56
96
None
1
1
Panel
40
78
paperwork
2
4
phase one tests
4
Practice kit
6
23
practice kit or tria
1
2
Prop
12
29
Propeller/Spinner
12
29
Rudder
16
43
Seats and floors
7
31
Tools
1
1
Vertical Stabilizer
8
18
weight and balance
3
8
Wing Fit/install
27
76
Wing Fitting
27
76
wing tip lights and
5
16
Wing Tips
7
20
Wings
43
123
Wire work
22
27
Wiring behind panel
34
63
wiring-cabin
24
42
Copyright © 2001-2024 Matronics. All Rights Reserved.