Powered By Kitlog Pro v2.0
GARY'S WEB SITE
CH750
Empennage
Work Logs Found:
58
Category Work Time:
95 Hours
Date
Hours
Work Log Summary
Details
06-23-2013
2.75
finish deburr, scuff for primer, dimple for nut pl
Details
06-16-2013
3.25
begin deburring
Details
05-20-2013
0.75
updrill upper side
Details
05-18-2013
1.25
updrill to #20, drill and locate access cover
Details
04-24-2013
1.75
elevator skin stiffeners
Details
04-11-2013
1.75
elevator skin stiffeners
Details
03-18-2013
1.25
elevator control horns
Details
03-17-2013
1.00
elevator control horns
Details
03-16-2013
1.50
up drill to #30
Details
03-08-2013
1.00
servo doubler
Details
03-05-2013
1.00
servo doubler
Details
02-28-2013
1.00
trim nose skins
Details
02-25-2013
0.75
elevator nose skins
Details
02-24-2013
0.75
elevator nose skins
Details
02-23-2013
3.00
elevator nose skins
Details
12-30-2012
1.75
inspection hole, locate and cleco tab servo
Details
12-29-2012
1.00
Reinstalled skins and finish drill/cleco.
Details
12-25-2012
2.00
Notch for trim servo rod
Details
12-15-2012
3.00
locate and drill/cleco trim tab
Details
12-11-2012
1.50
locate and drill/cleco rear elevator channel
Details
12-01-2012
1.25
Fit and remake elevator trim tab channel.
Details
11-27-2012
1.25
Completed cut out of left skin for trim tab.
Details
11-24-2012
3.25
Elevator rear skins, trim tab cut out.
Details
11-23-2012
1.50
bend control horns and trim tab horn
Details
11-20-2012
1.00
sand to shape other .063 parts
Details
11-20-2012
1.75
rough cut horns and hinge brackets, trim tab hinge
Details
11-19-2012
1.00
bend trailing edge trim tab, drill rivet holes
Details
11-18-2012
3.25
fabricate new trim tab
Details
11-16-2012
3.50
tip hinge and trim tab hinge
Details
11-15-2012
0.75
cut and sand upper elevator horn
Details
11-14-2012
0.75
Cut and sand lower elevator horn
Details
11-12-2012
1.75
Lay out horns and ninge brackets
Details
11-06-2012
0.50
install elevator rear channel
Details
11-04-2012
1.00
New elevator rear channel
Details
09-21-2012
1.00
elevator rear channel
Details
09-16-2012
1.00
Cleco tip ribs to elevator skins
Details
09-11-2012
1.75
drill and cleco skin to skeleton
Details
08-30-2012
1.75
tune up and begin clecoing to skeleton
Details
08-29-2012
2.00
Bend elevator skins
Details
08-28-2012
1.00
elevator rear skins
Details
08-27-2012
0.75
elvator rear skins
Details
08-23-2012
2.50
elevator rear skins
Details
08-21-2012
0.25
elevator rear skins
Details
08-20-2012
1.00
elevator rear skins
Details
06-21-2012
1.25
Elevator skeleton assembly.
Details
06-19-2012
0.75
Flange lightening holes in stab and elev. spars.
Details
06-15-2012
2.50
Deburr lightening holes elev.and fwd. stab. spars.
Details
05-18-2012
3.25
Fabricate elevator spar
Details
04-28-2012
1.00
Form elevator tip ribs
Details
04-25-2012
1.50
Remakeelevator tip rib form blocks.
Details
04-20-2012
2.00
Form elevator tip and nose ribs.
Details
04-13-2012
1.50
elevator spar blank
Details
04-11-2012
2.75
bend elevator trim tab
Details
04-06-2012
1.00
bend parts
Details
04-01-2012
2.00
elevator skeleton blanks
Details
03-31-2012
2.50
elevator rear ribs
Details
03-26-2012
2.00
elevator tip and nose blanks
Details
03-23-2012
3.25
form blocks elevator tip and nose ribs
Details
SITE NAVIGATION
Contact Builder
CH750 Home
Category
# Logs
# Hours
All
158
275
Elevator
58
95
Empennage
58
95
Flaperons
3
4
Horizontal stabilize
16
21
Rudder
19
50
Slats
3
6
Tools
1
4
Copyright © 2001-2024 Matronics. All Rights Reserved.