Powered By Kitlog Pro v2.0
Michaels Web Site
Lightning LSA
Empennage
Work Logs Found:
34
Category Work Time:
118 Hours
Date
Hours
Work Log Summary
Details
03-26-2022
6.00
Rudder Cable Adjustments
Details
08-09-2020
1.00
Elevator Final install Push Rod
Details
05-19-2020
6.00
Finishing off the Tail Plane
Details
05-14-2020
6.00
Elevator Final install
Details
03-21-2020
4.00
Troque rod painting
Details
10-10-2012
1.50
Elevator Trim Tab
Details
10-06-2012
4.00
Trim Tab
Details
09-30-2012
4.00
Trim Tab Control Horn
Details
09-06-2012
1.00
Trim Servo Connection
Details
07-08-2012
3.00
Filling the HS Fairing Underside
Details
07-07-2012
4.50
Turned the Fuselage
Details
07-05-2012
1.50
Install Trim Tab Hinge
Details
07-03-2012
1.50
Trim Tab Installation
Details
06-29-2012
2.00
Glassing the Gap on Tail
Details
06-26-2012
2.00
More Sanding
Details
06-25-2012
1.50
Elevator Bell Crank
Details
06-22-2012
3.00
Drilling the AOI Bolts
Details
06-17-2012
10.00
Rework of the HS Spar
Details
06-08-2012
3.00
HS Sanding
Details
06-03-2012
5.00
Elevator Balance Modification
Details
06-02-2012
5.00
Elevator Balance Modification
Details
05-29-2012
2.00
HS Hinge Install Left Site
Details
05-28-2012
5.00
Making Incidence Meter
Details
05-24-2012
2.00
Fabricating Mounting Pan for Trim Servo
Details
05-23-2012
2.00
Rudder Filling and Preparation
Details
05-21-2012
2.00
Elevator Preparation
Details
05-17-2012
5.00
Work on HS and elevator
Details
05-13-2012
6.00
Install the hinges and prep the elevator
Details
05-11-2012
1.00
Hinge Drilling
Details
05-10-2012
1.50
Cutting the HS hinges
Details
05-09-2012
1.50
Cover plate on HS
Details
05-08-2012
1.00
Hinge line cutting
Details
05-07-2012
8.00
Horizontal stab install preperation
Details
05-04-2012
6.00
Horizontal stab install preperation
Details
SITE NAVIGATION
Contact Builder
Lightning LSA Home
Category
# Logs
# Hours
All
395
1656
Airplane
6
22
Avionics
1
10
Canopy
28
108
Cockpit
46
176
Controls
18
56
Electronic
12
52
Empennage
34
118
Engine
32
76
Firewall Forward
5
13
Fuselage
65
258
Landing Gear
12
71
Miscellaneous
4
16
None
2
8
Painting
40
276
Shop Supplies
1
Upholstery
12
138
Wings
77
258
Copyright © 2001-2024 Matronics. All Rights Reserved.