Powered By Kitlog Pro v2.0
My RV-8 Build Log
RV-8
Brake System
Work Logs Found:
17
Category Work Time:
34 Hours
Date
Hours
Work Log Summary
Details
08-10-2019
2.00
Brake Pad Break In, Magnetometer Calibration
Details
06-15-2019
3.00
Brake System Bleeding
Details
03-23-2019
3.00
Brake Cylinder Return Springs
Details
08-11-2016
2.00
Brake Line Attachment Adjustment
Details
06-10-2014
2.50
Brakes - Line from Fuse to Caliper
Details
05-19-2012
2.00
Brake Line - Mounting Bracket to Master Cyllinders
Details
05-18-2012
2.00
Flex Brake Lines - Nylon Tee to Mounting Bracket
Details
05-17-2012
2.00
Clamp gear leg Brake Lines
Details
05-17-2012
1.00
Brake Line - Reservoir to Brake Cylinders
Details
05-16-2012
2.00
Making Right and Left Brake Line - Mounting Bracke
Details
05-16-2012
1.00
Left Brake Line Mounting Bracket to Left Gear Leg
Details
05-15-2012
2.00
Brake Line Connector Mounting Bracket
Details
05-15-2012
1.00
Brake Line - Mounting Bracket to Right Gear Leg
Details
05-11-2012
2.00
Installed Connectors in lower gear leg tower skin
Details
05-11-2012
2.00
Brake Reservoir
Details
05-10-2012
1.00
Locating the Brake Reservoir
Details
05-07-2012
3.00
Sorting out the Brake System Assembly
Details
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
876
2687
Ailerons and Flaps
1
5
Avionics
61
194
Baggage Door
1
3
Brake System
17
34
Cabin
7
40
Canopy
44
138
Cowl
56
180
DAR Inspection
1
3
Electrical
97
275
Empennage
97
342
Engine
122
322
Fairings
54
153
First Flight
1
2
Flight Control
17
46
Flight Training
2
10
Fuel System
34
106
Fuselage
98
299
Instrument Panel
17
60
Interior
13
42
Landing Gear
8
18
Lighting
10
26
Markings, Placards a
2
4
Miscellaneous
14
66
None
1
Paint and Prep
8
24
Phase I
1
2
Pitot/AOA
2
6
Post DAR Inspection
3
14
Prop
15
46
QB Kit
2
9
Static Pressure Syst
4
10
Tech Councilor Visit
1
2
Tech Inspection
1
2
Tires
1
1
Transition Training
1
10
Weight and Balance
1
3
Windscreen
27
75
Wings
34
115
Copyright © 2001-2024 Matronics. All Rights Reserved.