KitLog pro

Powered By Kitlog Pro v2.0

My RV-8 Build Log
Work Logs Found: 17
Category Work Time: 34 Hours
 Date
Hours
Work Log Summary

Details

 08-10-2019
2.00
Brake Pad Break In, Magnetometer Calibration
Details
       

 06-15-2019
3.00
Brake System Bleeding
Details
       

 03-23-2019
3.00
Brake Cylinder Return Springs
Details
       

 08-11-2016
2.00
Brake Line Attachment Adjustment
Details
       

 06-10-2014
2.50
Brakes - Line from Fuse to Caliper
Details
       

 05-19-2012
2.00
Brake Line - Mounting Bracket to Master Cyllinders
Details
       

 05-18-2012
2.00
Flex Brake Lines - Nylon Tee to Mounting Bracket
Details
       

 05-17-2012
2.00
Clamp gear leg Brake Lines
Details
       

 05-17-2012
1.00
Brake Line - Reservoir to Brake Cylinders
Details
       

 05-16-2012
2.00
Making Right and Left Brake Line - Mounting Bracke
Details
       

 05-16-2012
1.00
Left Brake Line Mounting Bracket to Left Gear Leg
Details
       

 05-15-2012
2.00
Brake Line Connector Mounting Bracket
Details
       

 05-15-2012
1.00
Brake Line - Mounting Bracket to Right Gear Leg
Details
       

 05-11-2012
2.00
Installed Connectors in lower gear leg tower skin
Details
       

 05-11-2012
2.00
Brake Reservoir
Details
       

 05-10-2012
1.00
Locating the Brake Reservoir
Details
       

 05-07-2012
3.00
Sorting out the Brake System Assembly
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.