Date
|
Hours
|
Work Log Summary
|
Details
|
05-01-2019
|
2.25
|
Installed nut plates for the replacement coils.
|
Details
|
|
|
03-02-2019
|
4.25
|
Cut out the fresh air vents.
|
Details
|
|
|
10-11-2018
|
1.50
|
Install upholstery just for fun.
|
Details
|
|
|
08-10-2017
|
5.25
|
Re-make the steering rod boot.
|
Details
|
|
|
04-24-2017
|
6.00
|
Working on forward lower fuselage.
|
Details
|
|
|
04-22-2017
|
4.25
|
Reinstall Spar tunnel.
|
Details
|
|
|
09-07-2016
|
5.25
|
Custom Instrument panel and extension below.
|
Details
|
|
|
09-01-2016
|
2.50
|
Build extension below the instrument panel.
|
Details
|
|
|
08-17-2016
|
1.00
|
Rivet aft tunnel.
|
Details
|
|
|
12-24-2015
|
0.01
|
Clean shop.
|
Details
|
|
|
12-21-2015
|
2.00
|
Riveted the rear carrythrough assembly.
|
Details
|
|
|
12-16-2015
|
7.75
|
Rear spar carry through and wing rigging.
|
Details
|
|
|
11-05-2014
|
1.00
|
Finished up the steering control boot.
|
Details
|
|
|
11-04-2014
|
3.00
|
Make Brake pulley link.
|
Details
|
|
|
11-04-2014
|
0.01
|
Building Pulley link.
|
Details
|
|
|
11-03-2014
|
1.25
|
Build Brake Cable guide
|
Details
|
|
|
10-30-2014
|
3.25
|
Gear Mounts and spacers.
|
Details
|
|
|
10-26-2014
|
1.50
|
Positioned Main gear legs and drilled.
|
Details
|
|
|
10-25-2014
|
1.75
|
Fabricate brake handle.
|
Details
|
|
|
10-20-2014
|
3.00
|
Drill firewall and make steering boot.
|
Details
|
|
|
10-19-2014
|
2.00
|
Cut an opening in the lower firewall.
|
Details
|
|
|
10-17-2014
|
1.00
|
Cut fiberglass for nose-gear steering linkage.
|
Details
|
|
|
10-15-2014
|
5.42
|
Glareshield, Panel, Crosstie, attach plates, clips
|
Details
|
|
|
10-14-2014
|
4.75
|
Fit glareshield, instrument panel, panel cross-tie
|
Details
|
|
|
10-13-2014
|
2.25
|
Fit the Glare-shield and located, drilled Fuel tan
|
Details
|
|
|
10-06-2014
|
2.75
|
Rudder cable adjuster fitting.
|
Details
|
|
|
10-05-2014
|
0.01
|
Review plans.
|
Details
|
|
|
11-03-2013
|
0.50
|
Position and drill Flap Handle.
|
Details
|
|
|
11-02-2013
|
1.00
|
Cut and clamp flap handle and cut flap position mo
|
Details
|
|
|
10-29-2013
|
1.75
|
Install lap Seat belts. Installed Idler and Elevat
|
Details
|
|
|
10-28-2013
|
2.25
|
Install rudder pivot blocks and pedals.
|
Details
|
|
|
09-23-2013
|
1.50
|
Build rudder pedal pivot blocks from Phenolic bloc
|
Details
|
|
|
09-22-2013
|
1.00
|
Build pushrod and cable adjusters.
|
Details
|
|
|
08-21-2013
|
4.00
|
Modify and cut instrument panel.
|
Details
|
|
|
08-20-2013
|
1.00
|
Modify and cut instrument panel.
|
Details
|
|
|
08-20-2013
|
2.00
|
Cut Glarshield.
|
Details
|
|
|
06-26-2013
|
1.00
|
Installed seat belts.
|
Details
|
|
|
06-26-2013
|
2.00
|
Build rear Spar carry through assembly.
|
Details
|
|
|
06-26-2013
|
4.00
|
Added an additional angle to the cabin side of the
|
Details
|
|
|
06-25-2013
|
6.50
|
Riveted the forward fuselage bottom skin.
|
Details
|
|
|
06-19-2013
|
2.00
|
Instrument panel cross tie and Fuel tank stop angl
|
Details
|
|
|
06-12-2013
|
3.00
|
Installed the flap drive pivot blocks and flap dri
|
Details
|
|
|
05-22-2013
|
2.25
|
Build dual control stick assembly.
|
Details
|
|
|
05-16-2013
|
2.50
|
Bend and install trim lever.
|
Details
|
|
|
05-09-2013
|
1.00
|
Bend Seat Pan.
|
Details
|
|
|
05-03-2013
|
2.50
|
Install nutplates for the hat cover.
|
Details
|
|
|
04-28-2013
|
2.25
|
Cut the Seat pan.
|
Details
|
|
|
04-11-2013
|
8.00
|
Updrill, deburr and rivet lower fuselage parts.
|
Details
|
|
|
04-09-2013
|
4.00
|
Pilot drill lower forward fuselage parts.
|
Details
|
|
|
03-23-2013
|
2.75
|
Seat Modification
|
Details
|
|
|
03-22-2013
|
2.00
|
Re-build parts for the lowered seat modification.
|
Details
|
|
|
03-20-2013
|
1.50
|
Start Seat Pan,
|
Details
|
|
|
01-06-2013
|
3.17
|
Rivet Firewall, forward tunnel and install motor m
|
Details
|
|
|
01-05-2013
|
2.50
|
Riveted the fwd fuselage to the aft fuselage and t
|
Details
|
|
|
12-22-2012
|
4.01
|
Clecoed all parts in F11.
|
Details
|
|
|
12-21-2012
|
6.00
|
Deburring and re-assembly of forward fuselage.
|
Details
|
|
|
12-20-2012
|
4.00
|
Deburr forward fuselage parts.
|
Details
|
|
|
12-19-2012
|
4.17
|
Updrill forward fuselage, tunnel zee. take apart.
|
Details
|
|
|
11-16-2012
|
3.50
|
Build various F10 pars from stock channel.
|
Details
|
|
|
11-14-2012
|
3.25
|
Build various F10 parts.
|
Details
|
|
|
11-12-2012
|
2.00
|
Build the idler assembly.
|
Details
|
|
|
11-08-2012
|
7.17
|
Contine forward fuselage.
|
Details
|
|
|
11-07-2012
|
6.75
|
Position and pilot drill Tunnel Zee.
|
Details
|
|
|
11-05-2012
|
1.50
|
Flip fuselage to work on Tunnel Zee.
|
Details
|
|
|
10-31-2012
|
7.50
|
Fit and drill forward fuselage sides, firewall and
|
Details
|
|
|
10-25-2012
|
2.00
|
Attach the forward and aft fuselage.
|
Details
|
|
|
10-20-2012
|
7.00
|
Remove clecos from Right forward fuselage, deburr
|
Details
|
|
|
10-19-2012
|
8.25
|
fit, pilot and updrill all left forward fuselage.
|
Details
|
|
|
09-27-2012
|
0.83
|
Updrill right forward fuselage.
|
Details
|
|
|
09-27-2012
|
1.17
|
Cutout hole in right upper longeron.
|
Details
|
|
|
09-09-2012
|
3.17
|
Pilot drilled Wing, Gear and Seatbelt attach angle
|
Details
|
|
|
08-28-2012
|
2.50
|
Fwd fuselage angles, R upper and lower engine moun
|
Details
|
|
|
06-21-2012
|
0.50
|
Complete Firewall attach angle assembly.
|
Details
|
|
|
05-23-2012
|
1.00
|
Drill forward side skin and cleco longeron.
|
Details
|
|
|
05-23-2012
|
3.00
|
Canapy latch strike plate. right fwd longersons.
|
Details
|
|
|
05-22-2012
|
0.01
|
New used microstop with 120 degree cutter.
|
Details
|
|
|
05-22-2012
|
2.00
|
Dimple and countersink aft tunnel assembly.
|
Details
|
|
|
05-17-2012
|
1.00
|
R & L Cowling attach hinge and angle assemblies.
|
Details
|
|
|
05-17-2012
|
1.00
|
Make the cockpit canapy latch strike plate.
|
Details
|
|
|
05-15-2012
|
1.75
|
Make several clips, firewall brackets.
|
Details
|
|
|
05-14-2012
|
0.92
|
Rudder pedal mount assembly.
|
Details
|
|
|
05-14-2012
|
3.00
|
Make several F14 parts.
|
Details
|
|
|
05-13-2012
|
3.45
|
Build F15 parts.
|
Details
|
|
|
05-12-2012
|
2.17
|
Aft web tunnell assembly.
|
Details
|
|
|
05-11-2012
|
2.50
|
Deburr and rivet upper firewall, box and strap.
|
Details
|
|
|
05-08-2012
|
3.00
|
Fit and drill the upper firewall.
|
Details
|
|
|
05-07-2012
|
2.00
|
Upper Firewall and filler box.
|
Details
|
|
|
05-05-2012
|
5.00
|
Make Aft tunnel web and Fwd tunnel zee.
|
Details
|
|
|
05-02-2012
|
2.00
|
Made clips and gussets from F17.
|
Details
|
|