KitLog pro

Powered By Kitlog Pro v2.0

Daves Sonex Web Site
Work Logs Found: 89
Category Work Time: 252 Hours
 Date
Hours
Work Log Summary

Details

 05-01-2019
2.25
Installed nut plates for the replacement coils.
Details
       

 03-02-2019
4.25
Cut out the fresh air vents.
Details
       

 10-11-2018
1.50
Install upholstery just for fun.
Details
       

 08-10-2017
5.25
Re-make the steering rod boot.
Details
       

 04-24-2017
6.00
Working on forward lower fuselage.
Details
       

 04-22-2017
4.25
Reinstall Spar tunnel.
Details
       

 09-07-2016
5.25
Custom Instrument panel and extension below.
Details
       

 09-01-2016
2.50
Build extension below the instrument panel.
Details
       

 08-17-2016
1.00
Rivet aft tunnel.
Details
       

 12-24-2015
0.01
Clean shop.
Details
     

 12-21-2015
2.00
Riveted the rear carrythrough assembly.
Details
       

 12-16-2015
7.75
Rear spar carry through and wing rigging.
Details
       

 11-05-2014
1.00
Finished up the steering control boot.
Details

 11-04-2014
3.00
Make Brake pulley link.
Details
       

 11-04-2014
0.01
Building Pulley link.
Details
       

 11-03-2014
1.25
Build Brake Cable guide
Details
       

 10-30-2014
3.25
Gear Mounts and spacers.
Details
       

 10-26-2014
1.50
Positioned Main gear legs and drilled.
Details
     

 10-25-2014
1.75
Fabricate brake handle.
Details
     

 10-20-2014
3.00
Drill firewall and make steering boot.
Details
       

 10-19-2014
2.00
Cut an opening in the lower firewall.
Details
       

 10-17-2014
1.00
Cut fiberglass for nose-gear steering linkage.
Details
       

 10-15-2014
5.42
Glareshield, Panel, Crosstie, attach plates, clips
Details
       

 10-14-2014
4.75
Fit glareshield, instrument panel, panel cross-tie
Details
       

 10-13-2014
2.25
Fit the Glare-shield and located, drilled Fuel tan
Details
       

 10-06-2014
2.75
Rudder cable adjuster fitting.
Details
       

 10-05-2014
0.01
Review plans.
Details
     

 11-03-2013
0.50
Position and drill Flap Handle.
Details
       

 11-02-2013
1.00
Cut and clamp flap handle and cut flap position mo
Details
       

 10-29-2013
1.75
Install lap Seat belts. Installed Idler and Elevat
Details
       

 10-28-2013
2.25
Install rudder pivot blocks and pedals.
Details
       

 09-23-2013
1.50
Build rudder pedal pivot blocks from Phenolic bloc
Details
       

 09-22-2013
1.00
Build pushrod and cable adjusters.
Details
     

 08-21-2013
4.00
Modify and cut instrument panel.
Details
       

 08-20-2013
1.00
Modify and cut instrument panel.
Details
       

 08-20-2013
2.00
Cut Glarshield.
Details
       

 06-26-2013
1.00
Installed seat belts.
Details
       

 06-26-2013
2.00
Build rear Spar carry through assembly.
Details
       

 06-26-2013
4.00
Added an additional angle to the cabin side of the
Details
       

 06-25-2013
6.50
Riveted the forward fuselage bottom skin.
Details
       

 06-19-2013
2.00
Instrument panel cross tie and Fuel tank stop angl
Details
       

 06-12-2013
3.00
Installed the flap drive pivot blocks and flap dri
Details
       

 05-22-2013
2.25
Build dual control stick assembly.
Details
     

 05-16-2013
2.50
Bend and install trim lever.
Details
       

 05-09-2013
1.00
Bend Seat Pan.
Details
       

 05-03-2013
2.50
Install nutplates for the hat cover.
Details
       

 04-28-2013
2.25
Cut the Seat pan.
Details
       

 04-11-2013
8.00
Updrill, deburr and rivet lower fuselage parts.
Details
       

 04-09-2013
4.00
Pilot drill lower forward fuselage parts.
Details
       

 03-23-2013
2.75
Seat Modification
Details
       

 03-22-2013
2.00
Re-build parts for the lowered seat modification.
Details
       

 03-20-2013
1.50
Start Seat Pan,
Details
       

 01-06-2013
3.17
Rivet Firewall, forward tunnel and install motor m
Details
       

 01-05-2013
2.50
Riveted the fwd fuselage to the aft fuselage and t
Details
       

 12-22-2012
4.01
Clecoed all parts in F11.
Details

 12-21-2012
6.00
Deburring and re-assembly of forward fuselage.
Details
       

 12-20-2012
4.00
Deburr forward fuselage parts.
Details
       

 12-19-2012
4.17
Updrill forward fuselage, tunnel zee. take apart.
Details
       

 11-16-2012
3.50
Build various F10 pars from stock channel.
Details
       

 11-14-2012
3.25
Build various F10 parts.
Details
       

 11-12-2012
2.00
Build the idler assembly.
Details
       

 11-08-2012
7.17
Contine forward fuselage.
Details
       

 11-07-2012
6.75
Position and pilot drill Tunnel Zee.
Details
       

 11-05-2012
1.50
Flip fuselage to work on Tunnel Zee.
Details

 10-31-2012
7.50
Fit and drill forward fuselage sides, firewall and
Details
       

 10-25-2012
2.00
Attach the forward and aft fuselage.
Details
       

 10-20-2012
7.00
Remove clecos from Right forward fuselage, deburr
Details
       

 10-19-2012
8.25
fit, pilot and updrill all left forward fuselage.
Details
       

 09-27-2012
0.83
Updrill right forward fuselage.
Details
       

 09-27-2012
1.17
Cutout hole in right upper longeron.
Details
       

 09-09-2012
3.17
Pilot drilled Wing, Gear and Seatbelt attach angle
Details
       

 08-28-2012
2.50
Fwd fuselage angles, R upper and lower engine moun
Details
       

 06-21-2012
0.50
Complete Firewall attach angle assembly.
Details
       

 05-23-2012
1.00
Drill forward side skin and cleco longeron.
Details
       

 05-23-2012
3.00
Canapy latch strike plate. right fwd longersons.
Details
       

 05-22-2012
0.01
New used microstop with 120 degree cutter.
Details
       

 05-22-2012
2.00
Dimple and countersink aft tunnel assembly.
Details
       

 05-17-2012
1.00
R & L Cowling attach hinge and angle assemblies.
Details
       

 05-17-2012
1.00
Make the cockpit canapy latch strike plate.
Details
       

 05-15-2012
1.75
Make several clips, firewall brackets.
Details

 05-14-2012
0.92
Rudder pedal mount assembly.
Details
       

 05-14-2012
3.00
Make several F14 parts.
Details
       

 05-13-2012
3.45
Build F15 parts.
Details
       

 05-12-2012
2.17
Aft web tunnell assembly.
Details
       

 05-11-2012
2.50
Deburr and rivet upper firewall, box and strap.
Details
       

 05-08-2012
3.00
Fit and drill the upper firewall.
Details
       

 05-07-2012
2.00
Upper Firewall and filler box.
Details
       

 05-05-2012
5.00
Make Aft tunnel web and Fwd tunnel zee.
Details
       

 05-02-2012
2.00
Made clips and gussets from F17.
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.