KitLog pro

Powered By Kitlog Pro v2.0

HAKAN'S WEB SITE
Work Logs Found: 25
Category Work Time: 84 Hours
 Date
Hours
Work Log Summary

Details

 12-30-2015
2.00
fairings
       

 12-30-2015
2.00
fairings
       

 12-19-2015
2.00
Mods
       

 12-19-2015
2.00

       

 12-19-2015
2.00

       

 05-29-2013
5.00
DAR inspection
Details
       

 05-04-2013
12.00
Condition inspection
Details
       

 04-30-2013
0.50
ID plate
Details
     

 04-30-2013
1.50
Bleeding the brakes
Details
       

 04-27-2013
3.00
Transition training
Details
       

 04-21-2013
4.00
Weight and balance
Details
       

 04-19-2013
1.00
Installing fire extinguisher
Details
     

 04-07-2013
0.50
Left wing on
Details
       

 03-26-2013
3.00
Aircraft in hangar
Details
       

 03-23-2013
5.00
Preparing the hangar
Details
       

 03-22-2013
3.00
Paint almost done
Details
       

 03-16-2013
6.00
In the paint shop 2
Details
       

 03-08-2013
2.00
In the paint shop
Details
       

 02-27-2013
4.00
To the paint shop !
Details
       

 01-19-2013
10.00
Hardware for assembly
Details
       

 01-18-2013
1.00
Pilot stick labels
Details
     

 01-18-2013
2.00
Aileron trim decal
Details
       

 09-22-2012
5.00
Engine startup
Details
       

 04-29-2012
3.00
Rudder return springs
Details
     

 03-22-2012
3.00
Kit arrives at home
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.