Powered By Kitlog Pro v2.0
My RV-8 Build Log
RV-8
Fuel System
Work Logs Found:
34
Category Work Time:
106 Hours
Date
Hours
Work Log Summary
Details
07-21-2019
2.00
Fueling Aircraft and Calibrating Fuel Sendors
Details
07-20-2019
2.00
Prep for Fuel Sender Calibration
Details
01-01-2019
5.00
Fuel Line Connections, Fuel Valve Re-Install
Details
03-31-2018
4.00
Fuse to Tank Fuel Lines
Details
06-14-2017
2.00
New Right Side Fuel Line
Details
01-19-2017
2.00
Fuel Handle Reinstallation
Details
01-18-2017
2.00
Installing NEW Cross Over Fuel Line
Details
09-03-2016
4.00
Fuel Line Re-Do
Details
08-24-2016
2.00
New Fuel Line Installation
Details
08-22-2016
2.00
Fuel Line Grommet - Servo to Red Cube
Details
07-10-2016
6.00
Installing the Fuel Flow Sensor
Details
07-06-2016
2.00
NPT fittings for Red Cube vs. Fuel Line
Details
07-05-2016
2.00
Fuel Flow Sensor Triage - Red Cube
Details
07-13-2014
6.00
Fuel Valve/Filter Re-Install
Details
06-18-2014
2.50
Fuel System - Valve Cover Plate
Details
06-17-2014
2.00
Fuel System - Bracket Relocation
Details
06-09-2014
2.00
Fuel Line Redo - Final Fitting?
Details
06-08-2014
4.00
Fuel Line Redo - Mid Cabin Fuel Lines
Details
06-07-2014
5.00
Fuel Line Redo - Mid Cabin Console and Valve Loc
Details
06-05-2014
2.00
Fuel Line Redo - Fuel Filter
Details
06-03-2014
2.00
Fuel Line Redo - High Pressure Pump
Details
05-09-2012
3.00
Fuel Line Boost pump to Firewall
Details
05-09-2012
1.00
Engine Mount Rremoved,Fuel line installed
Details
05-08-2012
1.00
Fuel Line boost pump to firewall
Details
05-08-2012
2.00
Flare and Install Fuel Line Filter to Boost Pump
Details
05-06-2012
1.00
Fuel Line Boost Pump to Firewall Connector
Details
05-06-2012
3.00
Another Fuel Line attempt filter to boost pump
Details
05-01-2012
3.00
Fuel Line Filter to Boost Pump
Details
04-30-2012
1.50
Left Fuel Line Valve to Fuse
Details
04-30-2012
1.50
Complete 2nd Right Fuel Tank Line
Details
04-24-2012
2.00
Re-Make new Right Fuel Line - Valve to Tank
Details
04-22-2012
2.00
Right Tank Fuel Line Valve to Wing
Details
04-18-2012
3.00
Fuel Line from Selector to Filter
Details
04-18-2012
20.00
Fuel Line Bending - Valve to Filter
Details
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
876
2687
Ailerons and Flaps
1
5
Avionics
61
194
Baggage Door
1
3
Brake System
17
34
Cabin
7
40
Canopy
44
138
Cowl
56
180
DAR Inspection
1
3
Electrical
97
275
Empennage
97
342
Engine
122
322
Fairings
54
153
First Flight
1
2
Flight Control
17
46
Flight Training
2
10
Fuel System
34
106
Fuselage
98
299
Instrument Panel
17
60
Interior
13
42
Landing Gear
8
18
Lighting
10
26
Markings, Placards a
2
4
Miscellaneous
14
66
None
1
Paint and Prep
8
24
Phase I
1
2
Pitot/AOA
2
6
Post DAR Inspection
3
14
Prop
15
46
QB Kit
2
9
Static Pressure Syst
4
10
Tech Councilor Visit
1
2
Tech Inspection
1
2
Tires
1
1
Transition Training
1
10
Weight and Balance
1
3
Windscreen
27
75
Wings
34
115
Copyright © 2001-2024 Matronics. All Rights Reserved.