12-22-2012
|
2.00
|
disassembly for AD gear fix, Tweak baggage wall
|
|
|
|
12-20-2012
|
1.00
|
Attach canopy fairing
|
|
|
|
10-17-2012
|
1.50
|
Sand and prep canopy fairing
|
|
|
|
10-13-2012
|
3.00
|
Nose leg fairing, sand canopy fairing
|
|
|
|
10-09-2012
|
2.50
|
Trim and fill canopy fairing
|
|
|
|
10-06-2012
|
2.00
|
Fiberglass canopy shield-initial layup
|
|
|
|
10-03-2012
|
2.00
|
Nose leg Fairing
|
|
|
|
09-25-2012
|
2.50
|
Nose leg fairing
|
|
|
|
09-22-2012
|
4.00
|
Finish Wheel Fairings! finally...
|
|
|
|
09-18-2012
|
3.00
|
Wheel fairings, epoxy, nutplates, etc.
|
|
|
|
09-09-2012
|
3.00
|
EAA visit, epoxy wheel pant brackets, nutplates
|
Details
|
|
|
09-05-2012
|
2.50
|
Front Wheel Fairing
|
|
|
|
09-01-2012
|
3.00
|
Wheel fairings
|
|
|
|
08-28-2012
|
2.50
|
Wheel fairing brackets, nutplates on fairings
|
|
|
|
08-25-2012
|
3.00
|
Wheel fairings trim and fit
|
|
|
|
08-19-2012
|
4.00
|
Tailcone finish, fit and attach
|
|
|
|
08-16-2012
|
3.50
|
Tail cone
|
Details
|
|
|
08-14-2012
|
3.00
|
Dash panels glove box- Dan does while I vacation!
|
|
|
|
08-12-2012
|
2.00
|
Glove box- Dan finishes in my absence
|
|
|
|
07-31-2012
|
3.50
|
Final attach canopy to painted frame
|
|
|
|
07-25-2012
|
3.50
|
Oil Door on cowling,install and fit
|
|
|
|
07-22-2012
|
4.00
|
Rivet cowl hinges, nut plates, final fit
|
|
|
|
07-18-2012
|
3.50
|
Cowel attachment and fitting
|
Details
|
|
|
07-14-2012
|
4.00
|
Trim cowling,hinges and pins for cowling, trial fi
|
|
|
|
07-11-2012
|
3.50
|
Canopy frame paint, trim cowling
|
|
|
|
07-03-2012
|
3.50
|
Canopy latch, guide blocks, adjust fit
|
|
|
|
06-30-2012
|
3.50
|
Canopy trimming,fitting
|
|
|
|
06-26-2012
|
2.00
|
Canopy trimming,drilling attach points
|
|
|
|
06-18-2012
|
3.50
|
Attach canopy frame, struts,
|
|
|
|
06-16-2012
|
3.00
|
Seatbelts, baggage panel, floor panels
|
Details
|
|
|
06-12-2012
|
3.50
|
Cable tension set, fuel tank in, rear window
|
|
|
|
06-07-2012
|
3.50
|
Stabilator, Rudder Cables,lap belts
|
|
|
|
06-06-2012
|
2.00
|
Wing Electrical Interconnector Update
|
|
|
|
05-30-2012
|
3.50
|
Left wing connector plug,flaperon torque tubes
|
|
|
|
05-26-2012
|
3.50
|
Pushrods, fork, detent bracket,bellcrank
|
Details
|
|
|
05-24-2012
|
3.50
|
Control sticks, flaperon pushrods,fork assembly
|
|
|
|
05-22-2012
|
3.00
|
Flange bearings, flapperon handle, push rods
|
|
|
|
05-16-2012
|
3.00
|
Wiring routing, tunnel cover,
|
Details
|
|
|
05-12-2012
|
3.00
|
Headset plugs, servo wires,plugs,
|
|
|
|
05-09-2012
|
3.50
|
Skyview updates, install options wire harness, pow
|
|
|
|
05-06-2012
|
4.00
|
New skyview upgrades,
|
Details
|
|
|
05-02-2012
|
4.00
|
OAT probe, wire harness, final tasks, try seats!
|
|
|
|
04-28-2012
|
5.00
|
Wire harness, hinge pin sensors,
|
|
|
|
04-28-2012
|
4.00
|
Control sticks,ELT bracket, wiring ELT,fuel pump
|
Details
|
|
|
04-23-2012
|
3.50
|
Flaperon hinges, Transponder,Com cables, wire harn
|
Details
|
|
|
04-19-2012
|
2.50
|
Motor mount, hinge pins, install wings
|
|
|
|
04-15-2012
|
3.00
|
Install landing gear and wheels
|
|
|
|
04-14-2012
|
3.00
|
Wheels and Tire assembly, start main gear assembly
|
|
|
|
04-10-2012
|
1.50
|
Inventory Finish Kit
|