KitLog pro

Powered By Kitlog Pro v2.0

Sid & Houston Mayeux Project
Work Logs Found: 65
Category Work Time: 181 Hours
 Date
Hours
Work Log Summary

Details

 03-27-2015
3.00
First engine start, systems test run
Details
       

 11-06-2014
1.00
Exhaust pipe repair
Details
       

 10-05-2014
1.50
New fuel line, oil quickdrain
Details
       

 09-25-2014
3.00
Redux: Left Intake Snorkel mount, part 2
Details
       

 09-09-2014
2.00
Installing ignition/spark wires, part 2
Details
       

 09-09-2014
1.00
Alternate Air Door/oil line conflict, Part 2
Details
       

 09-09-2014
5.00
Alternate Air Door/oil line conflict, Part 1
Details
       

 09-08-2014
2.00
Redux: Left Intake Snorkel mount, part 1
Details
       

 09-08-2014
2.00
Installing ignition/spark wires, part 1
Details
       

 09-08-2014
2.00
Alternate Air Door, part 1
Details
       

 08-29-2014
2.00
Installing Oil Cooler/hoses and alternate air cabl
Details
       

 08-25-2014
3.00
FAB Snorkel, part 4
Details
       

 08-21-2014
2.00
Removing the inner crankshaft oil plug (for fixed
Details
       

 08-20-2014
3.00
FAB Snorkel, part 3
Details
       

 08-18-2014
2.00
FAB Snorkel, part 2
Details
       

 08-18-2014
2.00
FAB Snorkel, part 1
Details
       

 07-26-2014
3.00
Baffle Intake conical gussets
Details
       

 07-24-2014
3.00
Forward baffles part 4
Details
       

 07-20-2014
3.00
Forward baffles part 3
Details
       

 07-18-2014
2.00
Forward baffles part 2
Details
       

 07-18-2014
3.00
Forward baffles
Details
       

 07-10-2014
6.00
Cowling exterior finished
Details
       

 07-02-2014
2.00
Test-fitting all four cylinders' baffles
Details
       

 07-02-2014
2.00
#3 Cylinder baffle
Details
       

 07-02-2014
3.00
#1 and #2 cylinder baffles, Top engine mount brack
Details
       

 07-01-2014
4.00
Number 4 baffle and oil cooler, part 2
Details
       

 06-29-2014
7.00
Surface finish/pinhole fill, coat #1
Details
       

 06-29-2014
2.00
Final cowling fit
Details
       

 06-28-2014
3.00
Number 4 baffle and oil cooler, part 1
Details
       

 06-25-2014
3.00
Installing the cowling side camlocs
Details
       

 06-24-2014
2.00
Main Fuel Line re-route and protection
Details
       

 06-24-2014
3.00
Fabricating Cyl 4 baffle wall
Details
       

 06-18-2014
3.00
Oil dipstick, footheat scat tubing
Details
       

 06-18-2014
3.00
Camloc Flange side connections
Details
       

 06-17-2014
6.00
Bottom Cowling Center Brace
Details
       

 06-16-2014
4.00
Top/Bottom Cowl Camloc Stud Holes
Details
       

 06-16-2014
4.00
Top and Bottom Cowl Camlocs
Details
       

 06-16-2014
2.00
Fixing the left side cowling gap
Details
       

 06-01-2014
3.00
Top Cowl Camlocs, part 1
Details
       

 06-01-2014
2.00
Bottom cowling fitting and trimming, part 3
Details
       

 05-31-2014
2.00
Bottom cowling fitting and trimming, part 2
Details
       

 05-28-2014
6.00
Bottom cowling fitting and trimming
Details
       

 05-24-2014
3.00
Blocking the top cowling
Details
       

 05-21-2014
3.00
Cowling top half trim/fit
Details
       

 05-20-2014
2.00
Cowling oil door access
Details
       

 05-16-2014
2.00
Protecting the sniffle valve and throttle cables
Details
       

 04-29-2014
2.00
Installing the "Red Cube" fuel transducer
Details
       

 04-14-2014
3.00
EMS Sensor wire routing
Details
       

 04-04-2014
6.00
Wiring the EMS Sensors part 1
Details
       

 03-25-2014
3.00
Oil/Air Seperator part 2
Details
       

 03-25-2014
2.00
Oil/Air Seperator installation part 1
Details
       

 03-21-2014
4.00
Installing the Throttle and Mixture cables
Details
       

 03-19-2014
3.00
Installing the manifold pressure line and sensor
Details
       

 03-19-2014
3.00
Fuel Pump Overflow and Pressure Sensor connections
Details
       

 03-19-2014
2.00
Fabricating/installing the engine sniffle valve
Details
       

 03-18-2014
2.00
Installing the Fuel Injector
Details
       

 03-12-2014
2.00
Installing the exhaust pipe hanger supports
Details
       

 03-11-2014
2.00
Installing the engine exhaust system
Details
       

 03-10-2014
3.00
Throttle/Mixture linkages
Details
       

 03-06-2014
1.00
Hanging the Engine part 2
Details
       

 03-06-2014
4.00
Hanging the Engine part 1
Details
       

 03-05-2014
2.00
Uncrating the engine
Details
       

 03-05-2014
2.00
Prepping the engine for installation
Details
       

 07-09-2012
2.00
Installing the Engine Mount
Details
       

 04-11-2012
0.10
My Prop Came In!!
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.