Powered By Kitlog Pro v2.0
My RV-10
RV-7A
Electrical
Work Logs Found:
62
Category Work Time:
130 Hours
Date
Hours
Work Log Summary
Details
12-23-2013
2.00
Wing Tips / Nav/Strobes/Landing Lights
Details
07-25-2013
1.00
Capacitance Fuel Sensors
Details
07-23-2013
1.00
Working my Way Back
Details
07-21-2013
3.50
Wiring Harness
Details
07-20-2013
3.50
Wrapping Up
Details
07-16-2013
1.00
GPS Position to ELT Testing
Details
07-14-2013
2.00
ELT Harness Completion
Details
07-13-2013
3.50
ELT / GPS Position Wiring
Details
07-11-2013
1.00
Installed Remote ELT Switch
Details
07-10-2013
1.00
ELT Planning / Installation
Details
07-07-2013
0.00
ELT / ADS-B
Details
06-18-2013
1.50
Landing Lights
Details
06-16-2013
1.50
Right Landing Light
Details
06-15-2013
3.00
Mounting the Landing Lights
Details
06-12-2013
1.00
Nav / Strobe Wiring Test
Details
06-11-2013
1.00
AeroLED Wiring Harness Left Fuselage
Details
06-10-2013
1.50
Mounting Nav/ Strobes in Wingtips
Details
06-09-2013
2.50
Fabricated Harness for Nav/Strobes/Lnd Lights
Details
05-29-2013
0.50
Right Nav/Strobe light
Details
05-28-2013
1.00
Landing Light Wiring
Details
05-27-2013
1.50
AeroLED SunTail Mounting
Details
05-26-2013
2.00
More Wiring Harness Work
Details
05-25-2013
2.50
Nav / Landing Lights Harness
Details
05-24-2013
2.50
Suntail Wiring Harness
Details
05-20-2013
1.00
Suntail mounting
Details
03-23-2013
2.50
Aileron Trim Motor Mounts
Details
03-19-2013
1.50
Backing Plate for Aileron Trim Motor
Details
03-17-2013
3.50
Aileron Trim
Details
03-16-2013
4.50
Aileron Trim Mounting
Details
03-14-2013
1.50
Roll Trim Motor
Details
03-10-2013
3.50
Control Stick / Trim Wiring
Details
02-03-2013
2.50
Boost Pump / Land Lgts Wiring / Canopy
Details
01-08-2013
1.50
EFIS / EMS Ground Wires
Details
12-18-2012
1.00
Pitot Heat
Details
12-16-2012
4.50
Roll Servo / Pitch Wire Harness
Details
12-11-2012
2.00
Left Control Stick
Details
12-10-2012
1.00
Starter Switch
Details
12-08-2012
4.00
Antennas / Aux Power / Wiring
Details
12-07-2012
1.50
Map Lights
Details
12-04-2012
1.00
Switch Wiring Harness
Details
12-02-2012
2.00
Middle Switch Panel Wiring
Details
11-26-2012
1.00
Wiring
Details
11-23-2012
3.50
Pitch / Roll Trim System
Details
11-22-2012
5.50
Pitch Trim / Tail Lights
Details
11-21-2012
4.50
Flaps / AP Pitch Servo
Details
11-18-2012
3.00
VP-X Switch / System Checks
Details
11-06-2012
2.00
Wing Wire for Auto-pilot Servo
Details
10-01-2012
4.00
Dynon EMS / Wiring
Details
09-15-2012
2.50
Switches
Details
09-14-2012
0.00
Ordered Dynon EMS Module
Details
09-11-2012
1.50
VP-X Pro Starter Annuciator
Details
09-09-2012
2.50
Battery Cables / Master / Starter Solenoids.
Details
08-23-2012
2.00
Alternator / ANL Fuse / Baffle
Details
08-18-2012
2.50
Wiring
Details
04-16-2012
2.00
Pinned Out J2 D-Sub
Details
04-13-2012
2.00
Flap Circuit - Test Bench
Details
04-12-2012
2.00
Vertical Power VP-X Pro Test - Starter
Details
04-11-2012
2.00
Vertical Power VP-X Pro Test Bench
Details
04-10-2012
2.00
Vertical Power VP-X Pro Test Bench
Details
04-08-2012
2.00
Switch Selection
Details
04-07-2012
2.00
VP-X Pro
Details
04-06-2012
0.50
VP-X Pro
Details
SITE NAVIGATION
Contact Builder
RV-10 Home
RV-7A Home
Category
# Logs
# Hours
All
1042
2191
Avionics
58
98
Cockpit
15
28
Electrical
62
130
Elevators
21
106
Empennage
13
95
Engine
123
199
Firewall Forward
36
79
Flight
7
3
Fuel Tanks
68
126
Fuselage
333
734
Hanger
10
Horizontal Stab
27
82
Interior
2
8
Introduction
4
Miscellaneous
13
6
Mistakes
3
2
None
1
Paint Schemes
3
50
Practice Kit
3
3
Prop
4
2
Rudder
20
60
Shop
4
1
Shop Supplies
1
Tools
9
2
Vertical Stab
6
38
Wings
196
339
Copyright © 2001-2024 Matronics. All Rights Reserved.