Powered By Kitlog Pro v2.0
HAKAN'S WEB SITE
rv7a
Fuel
Work Logs Found:
12
Category Work Time:
28 Hours
Date
Hours
Work Log Summary
Details
01-19-2013
1.00
Tank selector
Details
11-13-2012
1.00
Safety wire on gascolator
Details
10-06-2012
4.00
FAB drain line
Details
10-05-2012
2.00
FAB fuel drain
Details
07-14-2012
2.00
Wing drain fittings
Details
07-14-2012
3.00
Fuel vent inlets
Details
07-11-2012
2.00
Primer solenoid installed
Details
07-09-2012
1.00
Fuel flow sensor
Details
04-03-2012
4.00
Adding electrical fuel pump and bypass line
Details
03-27-2012
4.00
Main fuel lines
Details
03-26-2012
2.00
Main fuel lines from wing and fuel vent lines.
Details
03-23-2012
2.00
Fuel line from selector valve
Details
SITE NAVIGATION
Contact Builder
320/360 Home
rv7a Home
Category
# Logs
# Hours
All
317
1129
Avionics
27
92
Electrical
36
144
Empennage
18
58
Engine
32
116
Flight controls
4
9
Fuel
12
28
Fuselage
109
375
Interior
3
8
Landing gear
31
127
Miscellaneous
25
88
Prop
2
21
Wings
18
63
Copyright © 2001-2024 Matronics. All Rights Reserved.