KitLog pro

Powered By Kitlog Pro v2.0

HAKAN'S WEB SITE
Work Logs Found: 32
Category Work Time: 116 Hours
 Date
Hours
Work Log Summary

Details

 04-30-2013
1.00
Oil change
Details
     

 04-28-2013
3.00
Compression and timing check
Details
     

 01-20-2013
1.00
Engine plenum
Details
     

 10-08-2012
3.00
Fitting engine plenum inlets
Details
       

 10-07-2012
6.00
Plenum inlets
Details
       

 10-05-2012
3.00
Oil return lines
Details
       

 09-30-2012
4.00
Engine run-up 2
Details
       

 09-30-2012
8.00
Engine plenum modification
Details
       

 09-28-2012
6.00
Molding grooves for inlet
Details
       

 09-20-2012
4.00
Air filter box complete
Details
       

 09-19-2012
6.00
Cowl inlet
Details
       

 09-17-2012
10.00
Air filter box
Details
       

 08-20-2012
2.00
Alternator safety wire and carb heat muff
Details
       

 07-31-2012
2.00
heater muff
Details
       

 07-28-2012
0.50
Removed starter motor
Details
     

 07-28-2012
1.50
Prop arrives!
Details
       

 07-27-2012
6.00
Cowl exit ramps
Details
       

 07-24-2012
2.00
Exhaust brackets
Details
       

 07-20-2012
5.00
Oil cooler
Details
       

 07-10-2012
1.00
Manifold pressure sensor
Details
     

 07-10-2012
4.00
Dual throttle linkage and micture
Details
       

 07-09-2012
4.00
CHT and EGT wires
Details
     

 07-07-2012
0.50
CHT probes
Details
     

 07-06-2012
3.00
Engine installation
Details
       

 07-05-2012
3.00
Engine mount installation
Details
     

 06-27-2012
12.00
Engine baffles
Details
       

 06-09-2012
8.00
James plenum and baffles
Details
       

 06-03-2012
2.00
ignition harness
Details
     

 05-24-2012
0.50
attached standby alternator
Details
     

 05-12-2012
1.00
EMS system CHT and EGT wires
Details
     

 05-07-2012
1.00
Cleaning carburator
Details
       

 04-11-2012
2.00
Engine arrives!
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.